CADANGAN MEMBINA DAN MENYIAPKAN SATU UNIT RUMAH BANGLO DUA TINGKAT

DI ATAS LOT PT 11092, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN: HAJI HAMZAH BIN

ABDUL MAJID

1-3, JALAN KASTURI 1, PLAZA KASTURI

OFF JALAN BALAKONG, 43200 CHERAS,

SELANGOR DARUL EHSAN

Construction and completion

of one unit of 2 storey

residential house including

external works within the lot

boundary

Excluding:

- Cold water services

- Sanitary plumbing

- Electrical installations

SCOPE OF

WORKS

- Site is generally flat

- External works outside lot

boundary, earthwork, site

clearance are completed by

others

SITE

CONDITIONS

GROUND FLOOR

PLAN

FIRST FLOOR

PLAN

ELEVATIONS

ROOF PLAN

F L O O R F I N I S

H E S

Ground Floor Plan

Standard Marble

Merbau Timber Flooring

Solid Merbau Plank Timber

Deck

MMK Satori Porcelain Floor

Tiles

MML Kelikir Floor Tiles

MML Mera Tiles

F L O O R F I N I

S H E S

First Floor Plan

Standard Marble

Merbau Timber Flooring

Solid Merbau Plank Timber

Deck

MMK Satori Porcelain Floor

Tiles

MML Kelikir Floor Tiles

MML Mera Tiles

W A L L F I N I S H

E S

W A L L F I N I S H

E S

W A L L F I N I S H E

S

C E I L I N G F I N I S

H E S

Plasterglass Ceiling

Skim Coating

“Lafarge” Waterchock

Plaster Board Ceiling

Types of doors

C E I L I N G F I N I S H

E S

Plasterglass Ceiling

Skim Coating

“Lafarge” Waterchock

Plaster Board Ceiling

DOUBLE LEAF DECORATIVE

SOLID TIMBER CORE DOOR

-ENTRANCE DOOR-

POWDER COATED

ALUMINUM FRAME

SLIDING DOOR WITH

FIXED GLASS BESIDE

-SLIDING DOOR-

H.W TIMBER FRAME

SINGLE LEAF SEMI

TIMBER CORE DOOR

-BEDROOM DOOR-

H.W TIMBER FRAME

SINGLE LEAF SEMI

TIMBER CORE DOOR

WITH WATERPROOFING

-BATHROOM-

Frameless ‘L’ shape fixed

glass panel with silicon

joint

-LIVING ROOM-

Frameless fixed glass

panel with silicon joint

-ENTRANCE-

S T A I R C A S E

B E D R O O M

B A T H R O O M

L I V I N G R O O M

D I N I N G A R E A

T E N D E R D O C U M E N T S

Such declaration requires the tenderer to confirm that:

● Tender price has not been communicated to other

party

● Not given any inducements or rewards to client

Declaration of Non-Collusion

Fixed completion time = 10 months

Tendering period =

2 weeks from date of letter of invitation

Tender validity period = 60 days

Tender deposit =

RM 500.00

Tender bond =

RM 10,000.00

Place of collection/issuance of tender documents = At QS’s office

Place of submission of tender = At

Employer’s office

Instructions & Conditions of Tendering

Appendix to Form of contract:

-Defects Liability Period:

24 months

-Insurance cover of third parties and damage to property :

RM1,000,000.00

-Insurance deductible amount:

RM 50,000.00

-Percentage to cover Professional Fees for reinstatement: (Sum

equivalent to 10% of Contract Sum)

-Amount of removal of debris:

Sum equivalent to 1% of contract sum

-Value of existing structure together with all contents owned by the Employer: Not applicable

-Date of commencement :

To be stipulated on the LOA

-Completion data:

Form of Contract - PAM FORM 2006 (WITH

QUANTITIES)

Form of Contract

-Interim claim interval:

1 month

-Period of honouring certificates:

30 days

-Percentage of value of materials and goods included in the certificate: 75%

-Percentage of certified value retained:

10%

-Limitation of retention:

5% of contract sum

It is contractor’s obligation to take up Contractor’s All

risk Insurance Policy to cover for material damage to

the whole of the contract works and third party liability

in the joint names of the employer and contractor,

subcontractors and all interested parties.

Contractor’s All Risk Insurance Policy ( Clause 20.A.1

)

Preambles

Explain the project, materials needed, unit prices,

provisional sums, methods of measurement and

potential errors.

Example : excavation is included in the project, the

type of rock must be outlined in the preamble.

Materials & Workmanship

Part A: General Requirements

- It includes relevant details of the site and

information on items which do not form part of

the permanent works

Part B: Specification of workmanship and materials

- Deals with the detailed requirements of every

trade. The type, the quality and method of fixing

and testing of every item for incorporation in

permanent works is described.

What’s included in Preliminaries:

Preliminaries

● Earnest money

● Working area

● Firm price contract

● Interpretation of tender

documents

● Drawings, shop drawings

● Temporary roads and

gangways

● Temporary buildings

● Construction plant

● Form of contract

● Performance bond

● Weekly report

PC sum & Provisional Sum

Cold water and Sanitary Plumbing Works :

RM20,000.00

Electrical Installation Works:

RM15,000.00

Supply and Delivery to Site of Sanitary Fittings: RM10,000.00

Contingencies:

RM100,000.00

Appendix A : List of drawings

Appendix B : Schedule of

finishes

● Which decided

by Architect

Appendix C: Schedule of daywork

rates

● Serves as a

basis in the

event of variation

Appendix D: Prices of basic

materials

Appendix E: Form of bank

guarantee for earnest money

● To ensure that

the contractor

does not pull out

if he is selected

by client

Appendix F: Form of bank guarantee for

performance bond

● performance bond protects

the owner from the

contractor’s failure to

perform in accordance with

the terms of the contract

T H A N K Y O

U