TENDER DOCUMENTATION Group 2 Group Members: YONG SEEN YEE 0315883 TEE SIN YI 0315689 LEE PEI GIE 0315653 KHOO XIN YEE 0316180 LEONG CHEE MUN 0316256 TAY SY MIN 0320813

Transcript of Measurement Presentation

Page 1: Measurement Presentation

TENDER DOCUMENTATION

Group 2Group Members:YONG SEEN YEE 0315883TEE SIN YI 0315689LEE PEI GIE 0315653KHOO XIN YEE 0316180LEONG CHEE MUN0316256TAY SY MIN 0320813

Page 2: Measurement Presentation

Project:One unit of Double Story Semi-Detached corner House on Seksyen 8, Kota Puteri,

Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan.

Completion period:The completion period is 25 weeks

Page 3: Measurement Presentation

Parties1.) Client (Name: Tan Sri Dato Jason Yong)CMC INDUSTRIES SDN. BHDLevel 5A-5, Corporate Building (Block D)Pusat Komersial SouthgateNo.2, Jalan Dua, Off Jalan Chan Sow Lin55200 Kuala Lumpur, Malaysia.

2.) Architect (Name: Mr. AR. Dennis)WAW ALI ARCHITECT SDN. BHDC 206 A&C 206B Jalan PJU 10/2A,Damansara Damai, 47830 Petaling Jaya,Selangor Darul Ehsan. 3.) Civil and Structural & Geotechnical Engineer (Name: Mr. IR. Zulhkiple A. Bakar)PERUNDING ZNA (ASIA) SDN. BHDSuite A-03-06, Block Allamanda,10 Boulevard Lebuhraya Sprint PJU 6A,47400 Petaling Jaya, Selangor Darul Ehsan.

Page 4: Measurement Presentation

Parties4.) Mechanical and Electrical Engineer (Name: Mr. IR. Thum Peng Chew)KTA Tenaga SDN. BHD.D1-21, Jalan PJU 1/41,Dataran Prima, Kelana Jaya,47301 Petaling Jaya,Selangor Darul Ehsan, Malaysia.

5.) Quantity Surveyor (Name: SR Yong Seen Yee)SY Quantity Surveyor SDN. BHD.No.3 Jalan Taylor’s,47500 Subang Jaya,Selangor Darul Ehsan, Malaysia. 6.) MINCONSULT SDN. BHD. (Name: Mr. IR. Chong Kwang Chern)No.6 Jalan 51A/223,46100 Petaling JayaSelangor Darul Ehsan Malaysia

Page 5: Measurement Presentation

COMPONENTS IN TENDER DOCUMENTS

• Form of Tender• Instruction To

Tenderers• Conditions of

Tendering• Final Summary of

Tender• Preambles• Specifications• Bills of Quantities• Preliminaries

• Main Building Works• External Works• PC and Provisional

Sums• Drawings• Schedule of Finishes• Schedule of Work

Rates• Prices of Basic

Materials• Form of Bank

Guarantee For Earnest Money

• Form of Bank Guarantee for Performance Bond

Page 6: Measurement Presentation

Declaration of Non - Colusion This is a form for the tenderer to fill in and sign to

declare that they are not under any agreement with any other tenderers or parties to submit any pre-determined tender amount.

Page 7: Measurement Presentation

Preliminaries Explain the scope of work of the overall

project, client requirements and any relevant works which not highlighted in other section.

Example: • Temporary power• Temporary water supply• Temporary facilities • Temporary hoarding• Guard house• Insurance

Page 8: Measurement Presentation

Form of contract

Form of contract• AGREEMENT AND CONDITIONS OF PAM Contract

2006 – (WITH QUANTITIES)

Type of contract• This contract is based on a firm price lump sum

tender

Page 9: Measurement Presentation

InsuranceINTERIM VALUATION AND CERTIFICATES• Minimum amount in interim Certificate shall be ten (10%) of the Contract Sum

INSURANCE• cover the period from the commencement of the contract until the end of Defect Liability

Period • The amount of cover for Contractor All Risk Insurance shall be RM1 million.

• The amount of cover for Workmen Compensation insurance shall be not less than ten (10%) percents of the Contract Sum.

• Insurance deductible amount shall be RM 100,000.00 an occurrence.

• The amount of cover for Professional Fees for reinstatement shall be a sum equivalent to 10% of the Contract Sum.

• The amount to cover for removal of Debris shall be a sum not less than the equivalent of 2% of the Contract Sum.

Page 10: Measurement Presentation

Daywork rates This part is give the tenderer to fill in the daywork rate

for labours and machineries which shall be pay for daywork ordered by the Architect.

Along with a mark up for overheads and profit. This can avoid the dispute between the workers and

consultant.

Page 11: Measurement Presentation

Drawings List of drawings that prepare by the Architect,

Engineers and etc. It show the exact scope of work of every part of the

building details section and the location.

Page 12: Measurement Presentation

Bank Guarantee Form for Performance Bond

Commonly used in the construction industry as a means of insuring a client against the risk of contractor failing to fulfil contractual obligations to the client.

If contractor fail to obey the agreements between client, the client can claim the money from the bank.

Page 13: Measurement Presentation

Schedule of Programme of Work

Page 14: Measurement Presentation

Form of Tender

Page 15: Measurement Presentation

11) The tenderers shall agree to complete the work within 25 weeks.

2) Tenderers shall not withdraw within 120 days after submission of tenders.

In the event that the tenderers • withdraw within the Tender Validity Period,• Imposed additional condition or stipulation

after the tender submission date, or• refuse to execute Contract agreement or

deposit Performance Bond within 2 months after date of possession of site,

PKNS reserves the right to nullify the contract.

Page 16: Measurement Presentation

Instructions to Tenderer

Page 17: Measurement Presentation

21) The Tenderer shall submit with his tender of Earnest Money of RM3,000.00 in the form of bank guarantee or bank draft in favor of SY Quantity Surveyor Sdn. Bhd .

2) The Tenderers shall have registered with CIDB and allow for all expenses incurred in connections with any levels and/or fees arising out of his compliance with CIDB.

Page 18: Measurement Presentation

Instructions to Tenderer

Page 19: Measurement Presentation

31) The Tenderer shall submit with his tender of Earnest Money of RM3,000.00 in the form of bank guarantee or bank draft in favor of Total Reliability Sdn. Bhd.

2) Employer reserves the right to accept or NOT to accept the lowest or ANY ONE of the Tenders or any other Tender.

3) The Tenderer is to agree that this TENDER is to remain valid and open for consideration for a period of Sixty (60) days from the final closing date for the submission of Tenders.

Page 20: Measurement Presentation

Prime Cost and

Provisional Sum

Page 21: Measurement Presentation

PRIME COST SUMMEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A,

SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8,

KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN

Mechanical and Electrical (M&E) Works

-RM15,000.00

Sanitary ware fittings and plumbing services

-RM6,375.00

Windows and Ironmongeries

-RM3,000.00

External Works and Landscaping-RM6,600.00

Page 22: Measurement Presentation

PROVISIONAL SUMMEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A,

SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8,

KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN

Contingency Sum-RM7,500.00

Page 23: Measurement Presentation

INTERNAL CEILING FINISHESLOCATION TYPES OF FINISHESENTRANCE FOYER, LIVING AND DINING AREA, KITCHEN, WASH AREA, BEDROOM 3

Skim Coat painted with ‘Jotun’ paint system

BATHROOM 1, BATHROOM 2, BATHROOM 3, MASTER BEDROOM, BEDROOM 1, BEDROOM 2, FAMILY AREA,

Suspended Fibrous plaster ceiling board panel

Page 24: Measurement Presentation

INTRNAL FLOOR FINISHESLOCATION TYPES OF FINISHESLIVING AND DINING AREA ‘Kimgres’ Ceramic non-slips Tiles

‘Binco Series (White-gloss/matt)’ floor tiles

KITCHEN, WASH AREA ‘Kimgres’ Ceramic non-slips Tiles ‘Binco Series’ - Plain Yulara Grey floor tile

Page 25: Measurement Presentation

INTERNAL FLOOR FINISHESLOCATION TYPES OF FINISHESBEDROOM 3 ‘Kimgres’ Ceramic non-slips Tiles

‘Concept Series’ - ‘Concept Plain Latte’ floor tiles

BATHROOM 2, BATHROOM 3 ‘Kimgres’ Ceramic non-slip Tiles – ‘Lifestyle Ice Grey’ floor tiles

Page 26: Measurement Presentation

INTERNAL FLOOR FINISHES

LOCATION TYPES OF FINISHESMASTER BEDROOM, BEDROOM 1, BEDROOM 2, FAMILY AREA, STAIRCASE

Timber laminated flooring

BATHROOM 1 ‘Kimgres’ Ceramic non-slip Tiles – ‘Lifestyle River Saltbush’ floor tiles

Page 27: Measurement Presentation

EXTERNAL FLOOR FINISHESLOCATION TYPES OF FINISHESFOYER ‘Kimgres’ Ceramic non-slip tiles-

‘Bino Series(White-gloss/matt) floor tiles.

TERRACE, BALCONY ‘Kimgres’ Ceramic non-slip Tiles

CAR PORCH Decoractive Concrete Imprint

Bino Series

Concrete Imprint

Page 28: Measurement Presentation

EXTERNAL CEILING FINISHES

LOCATION TYPES OF FINISHESGROUND FLOOR, BALCONY Skim Coating

FIRST FLOOR Eave Ceiling – UAC Duravent CeilingSkim Coating

Eave Ceiling

Page 29: Measurement Presentation

EXTERNAL WALL FINISHES

LOCATION TYPES OF FINISHESGROUND FLOOR, FIRST FLOOR Cement and Sand (1:6) Plastering

and Painting with ‘DULUX’ primer and ‘DULUX’ weathershield matt acrylic exterior finish.

BALCONY Mild Steel Railing‘DULUX’ Primer

‘DULUX’ weathershield

Page 30: Measurement Presentation

INTERNAL WALL

Page 31: Measurement Presentation

INTERNAL WALLAll internal area

Half cement brick wall

Party wall Full clay brick wall

Page 32: Measurement Presentation

INTERNAL WALL FINISHES

Page 33: Measurement Presentation

18mm thick cement and sand (1:6) mixed with plasticiser plastering with 3mm thick skim coat finish and painting with ‘Jotun’ paint system.

Master BedroomEntranceLiving Area, Dining Area Family AreaStaircaseBedroom 1,2 and 3

INTERNAL WALL FINISHES

Page 34: Measurement Presentation

300mm x 400mm ‘Kimgres’ wall tile – AW16LV00 Cane white.

Kitchen Wash Area

INTERNAL WALL FINISHES

Page 35: Measurement Presentation

INTERNAL WALL FINISHES

200mm x 300mm ‘Kimgres’ Lifestyle series wall tiles – A82W92DM Lifestyle Ice Grey.

- Bathroom 1, 2 and 3

Page 36: Measurement Presentation

DOORS

Page 37: Measurement Presentation

SOLID CORE DOORSD1

1200mm x 2400mm Metal Door Frame Veneered Door

Page 38: Measurement Presentation

HONECOMB CORE DOORS

D2

900mm x 2100mm Metal Door Frame Veneered Door

Page 39: Measurement Presentation

SOLID CORE FLUSH DOORS

D3

800mm x 2100mm Metal Door Frame Veneered Door

Page 40: Measurement Presentation

SOLID CORE DOORS

D4

900mm x 2400mm Metal Door Frame Veneered Door

Page 41: Measurement Presentation

ALUMINIUM SLIDING DOORS

SD13050mm x 2400mm

SD22450mm x 2400mm

2 sliding doors and 1 fixed panel

Page 42: Measurement Presentation

SD3

1530mm x 2100mm

ALUMINIUM SLIDING DOORS

1 sliding door and 1 fixed panel

Page 43: Measurement Presentation

F I T T I N G SWATER CLOSETS WASH HAND BASINS

BATHROOM 1, 2 & 3

Page 44: Measurement Presentation

F I T T I N G SKITCHEN SINK

Page 45: Measurement Presentation

T A PSHOWER FITTINGS

Page 46: Measurement Presentation

T A P

HAND BIDETSBATHROOM 1, 2 & 3

TAP WASH BASINBATHROOM 1, 2 & 3

Page 47: Measurement Presentation

T A P

KITCHEN SINK TAP

HOSE BIB TAPWASH AREA & GARDEN TOP

Page 48: Measurement Presentation

A C C E S O R I E SSOAP HOLDER BATHROOM 1, 2 & 3

Claytan TA723 Semi Recessed Soap Holder WHITE COLOUR or other equivalent

MIRROR BATHROOM 1

MSG size 450mm x 600mm x 5mm thk.

Page 49: Measurement Presentation

Dulux Interior Basecoat Sealer

+

Dulux ICI Maxilite Trade Emulsion Paint

To plastered surface of :• Horizontal soffit of landing slab

• Sloping soffit of staircase• Open string of staircase

+

Dulux Trade Metalshield Zinc Phosphate

Dulux Trade Bituminous Paint

To surface of :• Mild Steel balustrade• Mild steel handrails

INOVAR FLOOR Smartfloor Interlocking

Timber Laminated Flooring

To :• Landing Slab

• Threads• Face of receeding riser

STAIRCASE FINISHES

Page 50: Measurement Presentation

SEWER DRAINAGE

MH B1

MH B2

MH B3 MH B4 MH B5

MH B6

MH B7

MH M3

225mm sewer pipe

Page 51: Measurement Presentation

WATER RETICULATION

90 BAND

3 TEES

250mm DIA. PIPE

1 END CAP

22 ½ BEND

Page 52: Measurement Presentation

SURFACE WATER DRAIN

12 DRAINS

13 SEWERS

300mm DIA. PIPE

CULVERT

Page 53: Measurement Presentation

ROAD AND PAVEMENT

Page 54: Measurement Presentation