Measurement iv

39
CADANGAN MEMBINA DAN MENYIAPKAN SATU UNIT RUMAH BANGLO DUA TINGKAT DI ATAS LOT PT 11092, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN: HAJI HAMZAH BIN ABDUL MAJID 1-3, JALAN KASTURI 1, PLAZA KASTURI OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN

Transcript of Measurement iv

Page 1: Measurement iv

CADANGAN MEMBINA DAN MENYIAPKAN SATU UNIT RUMAH BANGLO DUA TINGKAT

DI ATAS LOT PT 11092, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN: HAJI HAMZAH BIN

ABDUL MAJID

1-3, JALAN KASTURI 1, PLAZA KASTURI

OFF JALAN BALAKONG, 43200 CHERAS,

SELANGOR DARUL EHSAN

Page 2: Measurement iv

Construction and completion

of one unit of 2 storey

residential house including

external works within the lot

boundary

Excluding:

- Cold water services

- Sanitary plumbing

- Electrical installations

SCOPE OF

WORKS

Page 3: Measurement iv

- Site is generally flat

- External works outside lot

boundary, earthwork, site

clearance are completed by

others

SITE

CONDITIONS

Page 4: Measurement iv
Page 5: Measurement iv

GROUND FLOOR

PLAN

Page 6: Measurement iv

FIRST FLOOR

PLAN

Page 7: Measurement iv

ELEVATIONS

Page 8: Measurement iv
Page 9: Measurement iv
Page 10: Measurement iv
Page 11: Measurement iv

ROOF PLAN

Page 12: Measurement iv

F L O O R F I N I S

H E S

Ground Floor Plan

Standard Marble

Merbau Timber Flooring

Solid Merbau Plank Timber

Deck

MMK Satori Porcelain Floor

Tiles

MML Kelikir Floor Tiles

MML Mera Tiles

Page 13: Measurement iv

F L O O R F I N I

S H E S

First Floor Plan

Standard Marble

Merbau Timber Flooring

Solid Merbau Plank Timber

Deck

MMK Satori Porcelain Floor

Tiles

MML Kelikir Floor Tiles

MML Mera Tiles

Page 14: Measurement iv

W A L L F I N I S H

E S

Page 15: Measurement iv

W A L L F I N I S H

E S

Page 16: Measurement iv

W A L L F I N I S H E

S

Page 17: Measurement iv

C E I L I N G F I N I S

H E S

Plasterglass Ceiling

Skim Coating

“Lafarge” Waterchock

Plaster Board Ceiling

Page 18: Measurement iv

Types of doors

C E I L I N G F I N I S H

E S

Plasterglass Ceiling

Skim Coating

“Lafarge” Waterchock

Plaster Board Ceiling

Page 19: Measurement iv

DOUBLE LEAF DECORATIVE

SOLID TIMBER CORE DOOR

-ENTRANCE DOOR-

POWDER COATED

ALUMINUM FRAME

SLIDING DOOR WITH

FIXED GLASS BESIDE

-SLIDING DOOR-

H.W TIMBER FRAME

SINGLE LEAF SEMI

TIMBER CORE DOOR

-BEDROOM DOOR-

H.W TIMBER FRAME

SINGLE LEAF SEMI

TIMBER CORE DOOR

WITH WATERPROOFING

-BATHROOM-

Page 20: Measurement iv

Frameless ‘L’ shape fixed

glass panel with silicon

joint

-LIVING ROOM-

Frameless fixed glass

panel with silicon joint

-ENTRANCE-

Page 21: Measurement iv

S T A I R C A S E

Page 22: Measurement iv

B E D R O O M

B A T H R O O M

L I V I N G R O O M

D I N I N G A R E A

Page 23: Measurement iv

T E N D E R D O C U M E N T S

Page 24: Measurement iv

Such declaration requires the tenderer to confirm that:

● Tender price has not been communicated to other

party

● Not given any inducements or rewards to client

Declaration of Non-Collusion

Page 25: Measurement iv

Fixed completion time = 10 months

Tendering period =

2 weeks from date of letter of invitation

Tender validity period = 60 days

Tender deposit =

RM 500.00

Tender bond =

RM 10,000.00

Place of collection/issuance of tender documents = At QS’s office

Place of submission of tender = At

Employer’s office

Instructions & Conditions of Tendering

Page 26: Measurement iv

Appendix to Form of contract:

-Defects Liability Period:

24 months

-Insurance cover of third parties and damage to property :

RM1,000,000.00

-Insurance deductible amount:

RM 50,000.00

-Percentage to cover Professional Fees for reinstatement: (Sum

equivalent to 10% of Contract Sum)

-Amount of removal of debris:

Sum equivalent to 1% of contract sum

-Value of existing structure together with all contents owned by the Employer: Not applicable

-Date of commencement :

To be stipulated on the LOA

-Completion data:

Form of Contract - PAM FORM 2006 (WITH

QUANTITIES)

Page 27: Measurement iv

Form of Contract

-Interim claim interval:

1 month

-Period of honouring certificates:

30 days

-Percentage of value of materials and goods included in the certificate: 75%

-Percentage of certified value retained:

10%

-Limitation of retention:

5% of contract sum

Page 28: Measurement iv

It is contractor’s obligation to take up Contractor’s All

risk Insurance Policy to cover for material damage to

the whole of the contract works and third party liability

in the joint names of the employer and contractor,

subcontractors and all interested parties.

Contractor’s All Risk Insurance Policy ( Clause 20.A.1

)

Page 29: Measurement iv

Preambles

Explain the project, materials needed, unit prices,

provisional sums, methods of measurement and

potential errors.

Example : excavation is included in the project, the

type of rock must be outlined in the preamble.

Page 30: Measurement iv

Materials & Workmanship

Part A: General Requirements

- It includes relevant details of the site and

information on items which do not form part of

the permanent works

Part B: Specification of workmanship and materials

- Deals with the detailed requirements of every

trade. The type, the quality and method of fixing

and testing of every item for incorporation in

permanent works is described.

Page 31: Measurement iv

What’s included in Preliminaries:

Preliminaries

● Earnest money

● Working area

● Firm price contract

● Interpretation of tender

documents

● Drawings, shop drawings

● Temporary roads and

gangways

● Temporary buildings

● Construction plant

● Form of contract

● Performance bond

● Weekly report

Page 32: Measurement iv

PC sum & Provisional Sum

Cold water and Sanitary Plumbing Works :

RM20,000.00

Electrical Installation Works:

RM15,000.00

Supply and Delivery to Site of Sanitary Fittings: RM10,000.00

Contingencies:

RM100,000.00

Page 33: Measurement iv

Appendix A : List of drawings

Page 34: Measurement iv

Appendix B : Schedule of

finishes

● Which decided

by Architect

Page 35: Measurement iv

Appendix C: Schedule of daywork

rates

Page 36: Measurement iv

● Serves as a

basis in the

event of variation

Appendix D: Prices of basic

materials

Page 37: Measurement iv

Appendix E: Form of bank

guarantee for earnest money

● To ensure that

the contractor

does not pull out

if he is selected

by client

Page 38: Measurement iv

Appendix F: Form of bank guarantee for

performance bond

● performance bond protects

the owner from the

contractor’s failure to

perform in accordance with

the terms of the contract

Page 39: Measurement iv

T H A N K Y O