21
> Panjang Bangunan : ### cm = 8.7 m > Lebar Bangunan : ### cm = 7m > Tinggi Bangunan : ### cm = 4.5 m > Pasangan Pondasi : 1 : 4 > Beton Bertulang : 1 : 4 > Sloof : 15 / 20 > Kolom/Tiang : 15 / 20 > Ring Balk : 15 / 20 > Pasangan Tembok : 1 : 4 > Plesteran Dinding : 1 : 3 > Atap : Genteng > Kayu : Kelas 1 > Tulangan Utama : ø 12 > Tulangan Sengkang : ø 6 - ### Parameter Luas Tanah (Tentukan sendiri) Panjang Tanah : 14 m Lebar Tanah : 12 m Rangka Plafond : 6 / 12 dan 5 / 7 gording : 6 / 12 Balok Apit : 2 6 / 12 Kuda-kuda : 8 / 12 Balok Nok : 6 / 12

description

qualifikasi

Transcript of ADM_joule

Page 1: ADM_joule

> Panjang Bangunan : ### cm = 8.7 m> Lebar Bangunan : ### cm = 7 m> Tinggi Bangunan : ### cm = 4.5 m> Pasangan Pondasi : 1 : 4> Beton Bertulang : 1 : 4> Sloof : 15 / 20> Kolom/Tiang : 15 / 20> Ring Balk : 15 / 20> Pasangan Tembok : 1 : 4> Plesteran Dinding : 1 : 3> Atap : Genteng> Kayu : Kelas 1> Tulangan Utama : ø 12> Tulangan Sengkang : ø 6 - ###

Parameter Luas Tanah (Tentukan sendiri)Panjang Tanah : 14 mLebar Tanah : 12 m

Rangka Plafond : 6 / 12 dan 5 / 7gording : 6 / 12Balok Apit : 2 6 / 12Kuda-kuda : 8 / 12Balok Nok : 6 / 12

Page 2: ADM_joule

Juil/D11101096

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lapangan

Pembersihan lapangan dilakukan untuk memulai atau memudahkan suatu pekerjaan pembangunan.Pembersihan dilakukan diseluruh area pekerjaan, yaitu seluas tanah kavling tanah setempat. Upah pembersihan disesuaikan dengan kondisi setempat.

Pembersihan LapanganPanjang Tanah = 14 mLebar Tanah = 12 m

Luas Tanah = 14 x 12 = ###

1.2 Pasangan Bouwplank / Pengukuran

Bouwplank berguna untuk menentukan titik ukur (elevasi) dari suatu pekerjaan bangunan, baik itukedalaman pondasi, tinggi lantai, beda tinggi terhadap muka jalan dan lain sebagainya, juga sebagai pembatas area pekerjaan terhadap lingkungan sekelilingnya.Bouwplank bisa dipasang setengah dari luas bangunan atau sekeliling luas bangunan dengan jaraklebih besar dari 1 m dari galian pondasi.

Garis Bouwplank

1 m

11 m 8.7 m

7 m1 m

9 mPerhitungan Panjang Bouwplank

Panjang Bouwplank : 11 mLebar Bouwplank : 11Panjang Bouwplank : 2p + 2l = 2 x 11 + 2 x 9 = 39 m

m2

Page 3: ADM_joule

Juil/D11101096

1.3 Pekerjaan Pondasi

1.3.1 Galian Tanah Pondasi

Penggalian pondasi dilaksanakan sampai mencapai tanah keras yang mampu menahan beban -beban diatasnya yang disalurkan melalui pondasi bangunan tersebut.

Batas Kavling

Garis Bouwplank1 m

Galian Pondasi

10.7 m

14 m ###

7 m 1 m

9 m

12 m

118.5 cm Perhitungan Volume Galian :1. Luas Penampang Galian (A)

= ( 118.5 + 64 ) / 2 x 110

= 9946.25

= 0.99463110 cm 2. Panjang Galian (t)

= 2p + 2l= 2 x 8.7 + 2 x 7= 31 m

3. Volume Galian64 cm = A x t

Luas Penampang Galian = 0.99463 x 31

= 31.2312

cm2

m2

m3

Page 4: ADM_joule

Juil/D11101096

1.3.2 Urugan Pasir Bawah Pondasi

27.25 x118.5 cm

10 cm

64 cm

110 cm 27.25=

x110 10

x = 2.47727 cm = 0.02477 m10 cm

64 cm

Gambar 1.3.2.2 Penampang urugan pasir bawah pondasi

Perhitungan Volume Urugan Pasir Bawah Pondasi

Luas Penampang urugan (A) = 0.64 + 2 0.02477 + 0.64 2 x 0.1 cm = 0.064Panjang Galian Pondasi (t) = 31 mVolume Urugan Pasir = A . t

= 0.064 x 31.4

= 2.0096

1.3.3. Pasangan Batu Kosong

27.25 x118.5 cm

10 cm

69.0

110 cm 27.25=

x110 10

x = 2.47727 cm = 0.02477 m10 cm

64 cm

Gambar 1.3.2.2 Penampang Pasangan batu kosong

Perhitungan Volume Batu Kosong

Luas Penampang urugan (A) = 0.7 + 2 0.02477 + 0.7 2 x 0.1 cm = 0.10591Panjang Galian Pondasi (t) = 31 mVolume Urugan Pasir = A . t

= 0.105909 x 31.4

= 3.325545

1.3.4. Pasangan Pondasi Batu Gunung 1 : 4

m2

m3

m2

m3

Page 5: ADM_joule

Juil/D11101096

Gambar 1.3.3.1 Detail Pondasi Batu Gunung 1 : 4

yPerhitungan Volume Pondasi Batu BataLuas Penampang Pondasi (A)= 69 + y / 2 x 90= 69.0 + 23.95

x 904 90 cm 2

= 4180.91 = 0.41809Panjang Pondasi (t) = 31.4 mVolume Pondasi = A.t

= 0.41809 x 31.4 m

= 13.1281x

69 1

Gambar 1.3.3.2 Penampang Pondasi Batu Bata1

=x

4 90x = 22.5 cmy = 69 - 2 x 22.5

= 23.9545 cm

cm2 m2

m3

Page 6: ADM_joule

Juil/D11101096

1.3.5.Urugan Kembali Tanah Bekas Galian

Perhitungan Volume Urugan Tanah Kembali

Volume Galian Tanah = 31.2312Volume urugan tanah kembali = 1/4 x Volume galian tanah

= 7.807806

1.4 Pekerjaan Beton Bertulang 1 : 4

1.4.1. Sloof Beton 15/20

20 cm

15 cmGambar 1.4.1.3. Penampang Sloof Beton

Perhitungan Sloof betonLebar Sloof = 15 cm = 0.15 mTinggi Sloof = 20 cm = 0.2 mPanjang Sloof = 31.4 mVolume Sloof = 0.15 x 0.2 x 31.4

= 0.942Gambar 1.4.1.2 Detail Sloof Beton

penulagan :

Tulangan Geser = direncanakan 6 - ###

Luas A Tulangan = = 3E-005

6 - 200

8.7 m

panjang kait dan bengkokan tulangan utama = 6.5 d = 39 mm = 0.039 m

sehingga panjang 1 tulangan utama adalah : = 15.7 + 2 0.039 = 15.78 m

panjang kait dan bengkokan sengkang = 7 d = 0.042 m

sehingga panjang 1 sengkang adalah : ( 2 x 15 ) + ( 2 + 20 )

m3

m3

m3

r2 m2

Urugan Tanah Kembali

Page 7: ADM_joule

Juil/D11101096

+ ( 2 x 4.2 ) = 0.784 m

jumlah sengkang : 870 + 700 1570= 79.5 buah20 20

≈ 80 buah

Page 8: ADM_joule

Juil/D11101096

1.4.2 Kolom Beton

Perhitungan Volume Kolom BetonLebar Kolom = 15 cmPanjang Kolom = 20 cmTinggi Kolom = 3 mJumlah Kolom = 4 buahVolume Kolom = 0.2 x 0.2 x 3 x 4

= 0.36

penulagan :

Tulangan Geser = direncanakan 6 ###

Luas A Tulangan = = 3E-005Jumlah Kolom = 4 bh

6 - 200

3 m

panjang kait dan bengkokan tulangan utama = 6.5 d = 39 mm = 0.039 m

sehingga panjang 1 tulangan utama adalah : = 3 + 2 0.039 = 3.08 cm

panjang kait dan bengkokan sengkang = 7 d = 0.042 m

sehingga panjang 1 sengkang adalah : ( 2 x 0.15 ) + ( 2 + 0.2 )+ ( 2 x 0.042 ) = 0.784 m

jumlah sengkang : 300= 16 buah ≈ 4 x 64 buah20

1.4.3 Ring Balok

Perhitungan Volume Ring BalokLebar ring balok = 20 cmTinggi ring balok = 20 cmPanjang ring balok = 31 mVolume Ring Balok = 0.2 x 0.2 x 31

= 1.256

penulagan :

Tulangan Geser = direncanakan 6 - ###

Luas A Tulangan = = 3E-005

6 - 200

m3

r2 m2

m3

r2 m2

Page 9: ADM_joule

Juil/D11101096

8.7 m

panjang kait dan bengkokan tulangan utama = 6.5 d = 39 mm = 0.039 m

sehingga panjang 1 tulangan utama adalah : = 8.7 + 2 0.039 = 8.78 cm

panjang kait dan bengkokan sengkang = 7 d = 0.042 m

sehingga panjang 1 sengkang adalah : ( 2 x 0.2 ) + ( 2 + 0.314 )+ ( 2 x 4.2 ) = 9.428 m

jumlah sengkang : 870 + 700 1570= 79.5 buah ≈ 80 buah20 20

PERHITUNGAN JUMLAH BATANG BESI YANG DIBUTUHKANUkuran standar panjang besi = 12 m

1.Tulangan utama 12 mm

Panjang Jumlah Pnjang Keseluruhan Jumlah Batangm bh m Batang

Sloof 15.78 4 63.112 5

Kolom 3.08 16 49.248 4

Ring Balk 15.78 4 63.112 5

1.Tulangan Geser 6 mm

Panjang Jumlah Pnjang Keseluruhan Jumlah Batangm bh m Batang

Sloof 0.78 80 62.72 5

Kolom 0.78 64 50.176 4

Ring Balk 0.78 80 62.72 5

panjang besi yang digunakan untuk Tulangan Utama adalah : 15m x 12m = 175mpanjang besi yang digunakan untuk sengkang adalah : 15m x 12m = 176mvolume pekerjaan pembesian :

volume besi = volume tul.utama + vol.sengkang= ( 175m x 1.580 ) + ( 176m x 0.620 )= 277.246 kg + 108.882 kg = 386.128 kg

kawat = 0.01 x 386.128 kg = 3.8612768 kg

jadi total volume pekerjaan pembesian adalah 389.989 kg

1.5 Pekerjaan Dinding dan Plesteran

1.5.1 Pasangan Dinding Batu Bata 1 : 3

Dinding Batu Bata

kg/m1 kg/m1

Jenis

Jenis

Page 10: ADM_joule

Juil/D11101096

Page 11: ADM_joule

Juil/D11101096

Perhitungan Luas Dinding Batu BataLuas Kusen

K J1 K P1

Dimensi KusenK J1 (Kusen Jendela 1) = 8 buah K P1 (Kusen Pintu I) = 1 buahPanjang Kusen = 120 cm Panjang Kusen = 255 cmLebar Kusen = 84 cm Lebar Kusen = 160 cm

Luas Kusen = 8.064 Luas Kusen = 4.08

Luas Kusen Keseluruhan = 8.06 + 4.08

= 12Tinggi Dinding = 3 mPanjang Dinding = 31.4 mLuas Dinding = (Panjang Dinding x tinggi dinding) - Luas Kusen Keseluruhan

= 3 x 31 - 12.144

= 82.056

Perhitungan Plesteran DindingLuas Plesteran = 2 x Luas dinding

= 164.112Volume Plesteran = Ketebalan x Luas Plesteran

= 1.64112

m2 m2

m2

m2

m2

m3

Page 12: ADM_joule

Juil/D11101096

1.6 Pekerjaan Atap

1.6.1 Pekerjaan Kuda -kuda Klas 1

Untuk Kuda-kuda I

1.5 m

8.7 m

dimensi kuda-kuda

Tan =1.5 m

= ###4.35 m 0.94537

= 19.0256

perhitungan panjang bentang

AL = LK = KJ = JI = IH = HG = AG / 6 = 1.45 m

AB = FG = BC = EF = CD = DE = AL = ###

AD = 3 AB = ###

BL = FH = - = 0.5 m

CK = EI = - = 1 m

BK = FI = + = 1.53 m

CJ = EJ = + = 1.76 m

Tabel Pehitungan :

Nama BalokDimensi Balok

Panjang (m) JumlahPanjang

P (m) L (m) Keseluruhan (m)Kuda-kuda 0.08 0.12 17.90 1 17.90 0.172Balok Apit 0.06 0.12 3.00 4 12.00 0.086Balok Nok 0.06 0.12 1.5 1 1.5 0.011

COS

AB2 AL2

AC2 AK2

LK2 BL2

KJ2 KJ2

Volume (m3)

A G

F

E

D

C

B

JKL I H

Page 13: ADM_joule

Juil/D11101096

Untuk Kuda-kuda II

1.5 m

7 mdimensi kuda-kuda

Tan =1.5 m

= ###3.5 m

= 23.19860.91915

perhitungan panjang bentang

AL = LK = KJ = JI = IH = HG = AG / 6 = ###

AB = FG = BC = EF = CD = DE = AL = ###

AD = 3 AB = ###

BL = FH = - = 0.5 m

CK = EI = - = 1 m

BK = FI = + = 1.27 m

CJ = EJ = + = 1.54 m

Tabel Pehitungan :

Nama BalokDimensi Balok

Panjang (m) JumlahPanjang

P (m) L (m) Keseluruhan (m)Kuda-kuda 0.08 0.12 14.62 1 14.62 0.140Balok Apit 0.06 0.12 3.00 2 6.00 0.043Balok Nok 0.06 0.12 1.5 1 1.5 0.011

1.6.1 Pekerjaan Gording

dimensi gording

COS

AB2 AL2

AC2 AK2

LK2 BL2

KJ2 KJ2

Volume (m3)

A G

F

E

D

C

B

JKL I H

A

E

F

C

D

B

G

H I

M

L

J

K

JURAI LUAR

GORDING

SISI DEPAN

SISI SAMPING

Page 14: ADM_joule

Juil/D11101096

UNTUK SISI DEPANGD

=FD 3.5 m

=###

FB = 2.9 mGA FB 4.35 m FB

GD=

ED 3.5 m=

###EC = 1.45 mGA EC 4.35 m EC

UNTUK SISI SAMPINGHD

=ID 4.35 m

=2.9 m

IL = ###HM IL 3.5 m IL

HD=

JD 4.35 m=

1.45 mJK = ###HM JK 3.5 m JK

PERHITUNGAN JURAI LUAR

AD = + = 5.583234 m

AD' = + = 5.78 m

Tabel Pehitungan :

Nama BalokDimensi Balok

Panjang (m) JumlahPanjang

P (m) L (m) Keseluruhan (m)Gording 0.06 0.12 15.7 4 62.8 0.45

Jurai Luar 0.06 0.12 5.78 4 23.12 0.17

1.6.2 Pekerjaan Rangka Atap Klas 1

Tahap Perhitungan Atap sisi depanPanjang kasau = AD + 1 = ### + 1 = ###Luas Atap = 0.5 lebar depan x panjang kasau

= 5.35 + ###

= 10.9514

GD2 AG2

Tatap

2 AD2

Volume (m3)

m2

D

A

D'

Page 15: ADM_joule

Juil/D11101096

Tahap Perhitungan Atap sisi sampingPanjang kasau = AD + 1 = ### + 1 = ###Luas Atap = 0.5 lebar depan x panjang kasau

= 4.5 + ###

= 9.30789

1.6.3 Pekerjaan Atap genteng Betonuntuk sisi depanTahap Perhitungan Atap sisi depanPanjang kasau = AD + 1 = ### + 1 = ###Luas Atap = 0.5 lebar depan x panjang kasau

= 5.35 + ###

= 10.9514

diketahui jumlah genteng = 11 bh /

Jumlah Genteng Beton = 2 11 x 11 bh /= 240.9299 bh

untuk sisi sampingTahap Perhitungan Atap sisi sampingPanjang kasau = AD + 1 = ### + 1 = ###Luas Atap = 0.5 lebar depan x panjang kasau

= 4.5 + ###

= 9.30789

diketahui jumlah genteng = 11 bh /

Jumlah Genteng Beton = 2 9.31 x 11 bh /= 204.7735 bh

jadi jumlah denteng beton yang dibutuhkan = 445.703 bh ≈ 446 bh

1.6.4 Pekerjaan Besi dan Baut

Tahap prhitungan baut konstruksi :Jumlah kuda -kuda : 2 bhJumlah kolom : 4 bhBaut 12 mm ( panjang ) : 12 bh x 2 = 24 bhBaut 12 mm ( pendek ) : 8 bh x 2 = 16 bhPlat Strip ( dua sisi ) : 4 bh x 2 = 8 bhBegel ( type 1 ) : 2 bh x 3 = 6 bhBegel ( type 2 ) : 1 bh x 4 = 4 bhBaut Angkur ( satu baut untuk satu kolom ) : 4 bh

1.6.4 Pekerjaan Listplank 3/30 Klas ITahap Perhitungan ListplankLebar Listplank : 0.03 m

m2

m2

m2

m2 m2

m2

m2

m2 m2

Page 16: ADM_joule

Juil/D11101096

Tinggi Listplank : 0.3 mPanjang Listplank : 31.4 m

Luas Listplank : 9.42

Volume Listplank : 0.2826

1.7 Pekerjaan Lantai1.7.1 Pekerjaan Urugan Pasir Bawah Lantai

Urugan pasir bawah lantai bertujuan untuk meratakan floor lantani yang akan dicor. Urugan pasir diletakkansecara merata dan dipadatkan. Selain itu urugan pasir berfungsi untuk meredam beban lantai ditasnya,sehingga waktu terjadi penurunan lantai tidak akan begelombang.

8.7 m

7 m

Tahap Perhitungan ListplankLebar Lantai : 7 mPanjang Lantai : 8.7 mTebal urugan Pasir : 0.1 m

Volume Urugan Pasir : 6.09

1.7.2 Pekerjaan Rabat Lantai

Tahap Perhitungan ListplankLebar Lantai : 7 mPanjang Lantai : 8.7 mTebal Rabat lantai : 0.12 m

Volume Urugan Pasir : 7.308

1.7 Pekerjaan Plafond1.7.1 Pasangan Plafond Triplek 4 mm dan Rangka

Plafon adalah penutup langit langit rumah yang berguna untuk melidungi ruangan yang penghuninya dari kejatuhan benda benda atau kotoran yang jatuh dari atap. Sealain itu untuk meredam panas yang disebabkanterik matahari, melindungi tampias air hujan dan yang terpenting dapat memperindah langit-langit rumah.Plafon bisa dipasang dengan bahan triplek/multiplek/plywood, eternit dan gypsun, rangkanya bisa terbuat dari kayu dan aluminium utuk bahan dari gypsun.

1

1

9 m

10.7 m

m2

m3

m3

m3

Page 17: ADM_joule

Juil/D11101096

Tahap Perhitungan PlafondPlafond DalamLebar Bangunan : 7 mPanjang Bangunan : 8.7 m

Luas plafond dalam : 60.9Plafond DalamLebar Luar Plafond : 9 mPanjang Luar Plafond : 10.7 m

Luas plafond luar : 35.4

Luas Plafond Keseluruhan : 60.9 + 35 = 96.3

1.7.2 Pasangan List Plafond

Tahap Perhitungan ListplafondPlafond DalamPanjang List : 31.4 m sejajar dinding dalamPlafond LuarPanjang List : 31.4 m sejajar dinding luar

: 39.4 m sejajar LISTPLANKPanjang List Plafond : 102.2 m

1.8 . Pekerjaan Pengecetan

Pengecetan adalah pekerjaan inishing tahap pembangunan. Pengecetan selain memperindah dan memper-cantik bangunan juga dapat melindungi metrial bangunan dari gangguan cuaca. Dinding yang dicat dengan cat tembok akan tahan terhaap lumut. Kayu yang dicat dengan cat minyak akantahan terhadap serangan rayap. Genteng yany dicat dengan cat genteng akan lebih talam terhadap tampias air hujan. Begitu pula terhadap material lainnya.

1.8.1 Pekerjaan Pengecetan Dinding dan KolomTahap Pengecetan Dinding dan Kolom

Luas Dinding : 82.056

Luas Kolom : 3.6

Luas Pengecetan : 85.656

1.8.2 Pekerjaan Pengecetan ListplankTahap Pengecetan ListplankLebar Lstplank : 0.3 mPanjang Listplank : 31.4 m

Luas Pengecetan : 31.7

1.8.3 Pekerjaan Pengecetan Plafond Luar dan DalamTahap Pengecetan Plafond

Luas Pengecetan : 96.3

1.9. Pekerjaan Saluran

20 cm

40 cm

10 cm

5 cm10 cm

40 cm

Penampang Saluran

Tahap Perhitungan Saluran Keliling :Panjang Saluran = 2 x 11 + 2 x 9 = 39.4 m

m2

m2

m2

m2

m2

m2

m2

m2

Page 18: ADM_joule

Juil/D11101096

Lebar Penampang Saluran = 40 cmLuas Penampang Saluran = 39.4 x 40

= 15.76 m2

Page 19: ADM_joule

Juil/D11101096

Page 20: ADM_joule

DAFTAR BOBOT

I. PEKERJAAN PERSIAPAN VOLUME SATUAN

1 Pembersihan Lapangan 168.0

2 Pasangan bouwplank / Pengukuran 39.4 M

3 Biaya Air Kerja 1.0 LS

II. PEKEJAAN PONDASI

1 Galian Tanah Pondasi 31.2

2 Urugan Pasir Bawah Pondasi 2.0

3 Pasangan Batu Kospng 3.3

4 Pasangan Batu Gunung 13.1

5 Urugan Tanah Kembali 7.8

III.PEKERJAAN BETON BERTULANG

1 Sloof Beton 15 / 20 3.8

2 Kolom Beton 15 / 20 1.4

3 Ring Balk Beton 15 / 20 5.0

4 Pembesian Tulangan Utama 277.2 kg

5 Pmbesian Tulangan Sengkang 108.9 kg

IV. DINDING DAN PLASTERAN

1 Pasangan Dinding Batu Bata Adukan 1 : 3 1.6

V. PEKERJAAN PINTU

1 Kusen Jendela I 8.0 UNIT

2 Kusen Pintu I 1.0 UNIT

VI. PEKERJAAN PLAFOND DAN RANGKA

1 Pasangan Plafond Triplek 4 mm 96.3

2 List Plafond 102.2 M

VII.PEKERJAAN LANTAI

1 Urogan Pasir Bawah Lantai 6.1

2 Rabat Beton 7.3

VIII. PEKERJAAN SALURAN

1 Pekerjaan Saluran Keliling 15.8

IX. PEKERJAAN PENGECATAN

1 Pengecetan Dinding dan Kolom 85.7

2 Pengecatan Listplank 31.7

3 Pengecatan Plafond Luar dan Dalam 96.3

X. PEKERJAAN ATAP

M2

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M3

M3

M2

M2

M2

M2

Page 21: ADM_joule

1 Kuda-kuda Kayu Klas I 8 / 12 0.1

2 Balok Apit 2 6 / 12 0.043

3 Gording 6 / 12 0.5

4 Nok Balok 6 / 12 0.011

5 Rangka Atap 5/7 dan 3/4 40.5

6 Jurai Luar 6 / 12 0.2

7 Atap Genteng beton 40.5

8 1.0 LS

9 Listplank 3/30 9.4

M3

M3

M3

M3

M2

M3

M2

Baut Konstruksi 12

M2