PROJEK PENYELENGGARAAN DAN OPERASI TAPAK PELUPUSAN SISA PEPEJALDAN CADANGAN PEMBANGUNAN ‘MATERIAL RECOVERY FACILITY (MRF)’
DI PULAU BURUNG, SEBERANG PERAI SELATAN, PULAU PINANGUNTUK MAJLIS PERBANDARAN SEBERANG PERAI & MAJLIS PERBANDARAN PULAU PINANG
WELCOME TO ALL PARTICIPANTS TO THE ENVIRONMENTALLY SOUNDTECHNOLOGIES & PUBLIC-PRIVATE PARTNERSHIP FOR ORGANIC WASTE
MANAGEMENT WORKSHOP 2015
8TH & 9TH JUNE 2015
-
OPERATION & MAINTENANCE OF SANITARY LANDFILLAND MATERIAL RECOVARY FACILITIES FOR PENANG
-
• Project Background
-
Site Possession 16th July 2012
Scope of work:
Design, develop, construct, manage,regulate, and operations in Phase 3 forTwenty (20) Years
Manage leachate generated by theexisting landfill (Phase 2 and Phase 1)
Extending the life of existing landfills inPhase 1 until 30th June 2013
Convert wetlands area of approximately10.12 hectare area adjacent to Phase 2into an Eco Park
-
Executive ChairmanExecutive Chairman
Deputy ExecutiveChairman
Deputy ExecutiveChairman
Chief ExecutiveOfficer
Chief ExecutiveOfficer
Chief OperatingOfficer
Chief OperatingOfficer
Operation GeneralManager
Operation GeneralManager
LandfillLandfillEnvironmentEnvironment Weighbridge &Claim
Weighbridge &Claim
Safety & SecuritySafety & Security MRFMRF
Site ManagerSite Manager
-
• Operation & Development Area• Development Work
-
ZONE B
ZONE A
TA
LP1
ZONE G
ZONE CP
ZONER1
ZONE F
ZONEE
LTP
MRF
OC
ZONE R3
-
Entrance
Weighbridge
-
Internal Road
Internal Road & Drainage system
-
Earth Drainage System
Leachate Pond
-
Office Area
Drainage System
-
Block & Dry
-
• Operation flow• Operation Area• Operation Equipment• Waste Volume
-
INSPECTIONINSPECTION
WEIGHBRIDGEWEIGHBRIDGE
WASTE CELLWASTE CELL
WASTE UNLOADINGWASTE UNLOADINGTIRE WASHTIRE WASH
LEVEL AND MANAGELEVEL AND MANAGE
COMPACTCOMPACT
WEIGHBRIDGEWEIGHBRIDGE
SOIL COVERSOIL COVER
ININ
OUTOUT
-
ZONE B
ZON A
TA
LP1
ZONE G
ZONE CP
ZONE R1
ZONE F
ZONE E
LTP
MRF
OC
ZONE R3
ZONE A
-
ZONE G
ZONE F
ZONE E
ZONE H
ZONE J
45,000M3
36,000M3
75,000M3
36,000M3
108,000M3
-
• 4 NOS. BULLDOZER (D6C - 3 NOS., D6H - 1 NO)• 1 NO WATER TRUCK• 3 NOS. EX-200 HITACHI EXCAVATOR• 1 NO. OF EXCAVATOR LONG ARM• 1 NO. OF 580-F BACKHOE• 2 NOS. OF INTERNAL LORRY• 1 NO. OF 25 TON COMPACT ROLLER
-
• Average incoming waste daily is 1700 to 1800 tons• In 2014, total incoming waste to Pulau Burung is
656,090 tons
-
• Plan layout• Flowchart
-
Incoming waste(MSW,
Industrial andCommercial
waste)
Unloadingwaste at
Loading area
Wasteseparated byTrommel andBag Breaker
Metal sortedout by Magnet
SeparatorManual Sorting
Recyclable
Residual sendto Landfill
Metal sortedout by Magnet
Seperator
Wasteseparated by
OrganicTrommel
Residual sendto landfill
Organic waste,potential toconvert as
landfill cover
Upper sieve
Lower sieve
-
• Leachate Treatment Plant
-
• Technology fromHyflux, Singapore
• Treatment PlantCapacity : 200 m3/day
• Using Biological,Chemical And PhysicalProcess
-
InfluentInfluent
PRE-TREATMENT1. Flocculation2. Sedimentation
ABRMBR1. MBBR2. Membrane System
ACFACFLF ROProcessLF RO
ProcessTreatedWater
TreatedWater
-
• PLBT obtained the Notification Approval fromDOE for constructing and operating the LeachateTreatment Plant on 29 October 2013 with severalconditions.
• Currently still in T & C Process and will comply allthe DOE Regulation and Standard for effluentdischarge, when the system is fully operate.
• PLBT will officially notify the DOE and otherrelevant agencies when the LTP is fully operationwith capacity 200m3/day.
-
Test Parameters StdSpecs.No UnitBefore
TreatmentAfter RO
Treatment
(Range) (Average)
1 Temperature oC 40.0 28 30
2 pH Value 5.5 - 9.0 8.0 7.53 BOD5 @ 20oC mg/L 20 900-2000 24 COD mg/L 400 2500-4000 1005 Suspended Solids mg/L 50 500-1000 500 0
• * For Ammoniacal Nitrogen (AN) , we are trying to study and upgrade the process to achieved Standard• For Heavy metal and other parameter, all results analysis comply with the DOE Standard.
-
• Daily in-situ testing was carry out every hour to make sure the treatmentprocess in a good condition
• Daily sampling and testing for important parameter as COD, AmmoniacalNitrogen and Colour at Internal Lab (PLBT)
• Weekly sample will sent to External Lab (Spectrum Laboratories Sdn Bhd)
-
YSI EXO 1 IN-SITU METERpH, Temp, Dissolved
Oxygen(DO), Turbidity,Salinity, Conductivity,TDS, Depth, Pressure
TSS IN-SITU METERTSS, Turbidity, MLSS
-
DRB 200, COD REACTORChemical Oxygen
Demand, COD
COLORIMETER 890COD, AmmoniacalNitrogen, Colour &
Heavy Metal
-
• Leachate treated – 50 to 100 m3/day depend onquality of the raw leachate.
• Refer to the agreement, LTP must treat leachate200m3/day.
• The consultant still working to maximize thecapacity of the treatment process.
• The existing plant will be modify to fulfill theagreement.
• Planning of the modification will start on May2015 and will be fully operated with maximumcapacity 200m3/day end of this year.
-
• Monitoring (environmental purposes)
-
• 7 Location for water, 2 location for Air & Noise• Leachate Pond (1), Leachate Ditch (2), Wetland
(1), JPS Canal (1), River Water (1), Seawater (1),Air (2), Noise (2)
• Monthly Report Submission- Department of Environmental (DOE)- Seberang Perai Municipal Council (MPSP)- Penang City Council (MBPP)- Penang Fishery Department
-
LeachatePond
Perimeter 1
JPS
Wetland
River Water
Perimeter 2Sea Water
-
• From result analysis up to Feb. 2015(Accreditation Lab), there are no pollution fromlandfill to other external water source at JPScanal, river and sea.
• Our reference to DOE also, there are no directpollution to river or sea from landfill.
• For water quality at Wetland, Leachate Ditch andLeachate Pond, its still under landfill area and willbe treated before discharge to external watersources.
-
Location : Near Site office, LTP Location: Near Guard House
-
Location : Near Site office, LTP Location: Near Guard House
-
POINT DATEL10
dB(A)L50
dB(A)L90
dB(A)Total Leq
dB(A)*DOE Guideline
Leq, dB(A)
Point N1(near guard
house)
Baseline Data(8-9/3/13)
67.5 55.5 49.5 64.165
(15-16/1/15) 69.0 58.5 54.7 69.7(17-18/2/15) 65.0 59.3 47.3 62.0
Point N2(near site
office)
Baseline Data(8-9/3/13)
58.5 56.0 54.0 56.765
(15-16/1/15) 67.2 62.1 54.1 65.4(17-18/2/15) 68.5 64.6 57.9 65.5
Noise generated by passing by vehicles (motorcycles and lorries)
-
Frequency: every 3 month (7 location surroundingTPPB)
1) In Front Of JPS Water Gate2) Sungai Tengah3) In Front Of Old EESB Jetty, 200 meter from
landfill4) About 500 meter from landfill5) About 1.5 kilometer from landfill6) Fish Farming Area, about 2.6 kilometer from
landfill7) Sungai Udang Shell Farming Area, about 3
kilometer from landfill
-
• No correlation between landfill operations andthe pollution levels either in marine water orsediment samples. No pollution was identifieddirectly from TPPB
• Seawater fall under Class II and III, suitable forfisheries, recreational, body contact and wateractivity.
-
• Plan• MRF
-
INSPECTIONINSPECTION
WEIGHBRIDGEWEIGHBRIDGE
DISCHARGE AREADISCHARGE AREA
WASTE UNLOADINGWASTE UNLOADINGTIRE WASHTIRE WASH
OVERHEAD CRAWLEROVERHEAD CRAWLER
BAG BREAKER & TROMMELBAG BREAKER & TROMMEL
WEIGHBRIDGEWEIGHBRIDGE
MANUAL & AUTOMATED SORTERMANUAL & AUTOMATED SORTER
ININ
OUTOUT
RECOVERED ITEMRECOVERED ITEMBALERBALER
RESIDUERESIDUETo LandfillTo Landfill
-
• Separation recyclables such as plastics, bottlesand metals
• Separation organics waste from the recyclablesitems
• Manually sorting by labors
• Reducing volume of waste before entering landfillcell
• Controlling Leachate volume
• Decreased the green houses gasses
• Baler
• Compress the waste
• More orderly
Trommel and conveyor system