Operations Management Unit 9: Managing Process Constraints 授授授授 授授授授授授授授授授授授 授授授 授授 本本本本本本本本 Operations Management: Processes and Supply Chains, 10th ed., Lee J. Krajewski, Larry P. Ritzman, and Manoj K Malhotra, Pearson Education, ©2013 本本本本本本本本本本 本本本本本本本本 ,。 1 本本 CC 本本本本 本本本本本 本本本本本本 本本 -- 3.0 授授授授

Transcript of Operations Management Unit 9: Managing Process Constraints 授課教師:...

Page 1: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Operations Management

Unit 9: Managing Process Constraints

授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授

本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed., Lee J. Krajewski, Larry P. Ritzman, and Manoj K Malhotra, Pearson Education, ©2013

本講義僅引用部分內容,請讀者自行準備。

1

【 本 著 作 除 另 有 註 明 外 , 採 取 創用 CC

「姓名標示-非商業性-相同方式分享」台灣 3.0

版授權釋出】

Page 3: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Managing ConstraintsManaging Constraints

3

Constraints

Three types of constraints Physical, Market, Managerial

Bottleneck p.264, 265

Page 5: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

TOC and Financial MeasuresTOC and Financial Measures

5

p.265 Table 7.1

Page 6: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Key Principles of the TOCKey Principles of the TOC

6

p.266 Table 7.2

Page 7: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Practical Application of the TOCPractical Application of the TOC

7

TOC involves the implementation of these five steps

p.266, 267

Page 8: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Identification and Management of Identification and Management of Bottlenecks Bottlenecks

8

p.267

Throughput time

Identifying bottlenecks

Page 9: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

EXAMPLE 7.1: Identifying the Bottleneck in EXAMPLE 7.1: Identifying the Bottleneck in a Service Processa Service Process

9

p. 267

Page 10: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Floating BottlenecksFloating Bottlenecks

10

Many front-office processes with high customer contacts and divergences have more complicated operations than the simple line flows in Ex. 7.1.

The variability in workload creates floating bottlenecks. This type of variability increases the complexity of day-to-

day scheduling.

In this situation, management prefers lower utilization rates, allowing greater slack to absorb unexpected surges in demand.

Page 11: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

EXAMPLE 7.2: Identifying the Bottleneck in EXAMPLE 7.2: Identifying the Bottleneck in a Batch Processa Batch Process

11

p.269

Page 12: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Managing Bottlenecks in Manufacturing Managing Bottlenecks in Manufacturing ProcessesProcesses

12

Identifying bottlenecks: Note utilization.

Note setup times.

Variability in workloads may create floating bottlenecks.

Ask experienced workers and supervisors.

Look for piled up materials in front of workstations

Page 13: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Managing Bottlenecks in Manufacturing Managing Bottlenecks in Manufacturing ProcessesProcesses

13

Relieving bottlenecks: Short-term

Carefully monitor schedules and keep bottleneck resource as busy as is practical.

Minimize idle time at the bottleneck.

Make sure bottleneck has all the resources it needs to stay busy.

Long-term Investments

More employees, more shifts, more working days

Process improvement / reengineering

Page 14: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Product Mix DecisionsProduct Mix Decisions

14

Traditional method: Contribution margin is the amount each product

contributes to profit and overhead.

No fixed costs are considered.

Bottleneck method: Note that the firm’s actual throughput and overall

profitability depend on the contribution margin generated at the bottleneck.

Page 15: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

EXAMPLE 7.3EXAMPLE 7.3Determining the Product MixDetermining the Product Mix

15

p.270-272

Page 16: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

Drum-Buffer-Rope SystemsDrum-Buffer-Rope Systems

16

p.272, 273 Figure 7.3

Capacity constrained resource (CCR) The bottleneck schedule is the drum The buffer is the time buffer The rope represents the tying of material release to the

drum beat

Page 17: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

版權聲明版權聲明

17

頁碼 作品 版權圖示 來源 / 作者

3Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 264, 265.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

7Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 266.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

8Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 267.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

10 臺灣大學 / 余峻瑜 教授

12 臺灣大學 / 余峻瑜 教授

13 臺灣大學 / 余峻瑜 教授

Page 18: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

版權聲明版權聲明

18

頁碼 作品 版權圖示 來源 / 作者

14 臺灣大學 / 余峻瑜 教授

16Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 272.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

2-9

Case: Radcliffe Infirmary... EXAMPLE 7.1: Identifying the Bottleneck in a Service Process( 各頁標題 )

Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 263-267.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

11

EXAMPLE 7.2: Identifying the Bottleneck in a Batch Process

Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 269.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

15, 16

EXAMPLE 7.3Determining the Product Mix, Drum-Buffer-Rope Systems( 各頁標題 )

Pearson Education / Lee J., Larry P. Ritzman, and Manoj K Malhotra,Operations Management: Processes and Supply Chains, 10th ed., P. 270, 272.本作品以著作權法第 46 、 52 、 65 條合理使用。瀏覽日期: 2013/05/01 。

Page 19: Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes

版權聲明版權聲明

19

頁碼 作品 版權圖示 來源 / 作者

2-9. 11, 15, 16

Pixabay/ Unknownhttp://pixabay.com/en/ashton-books-book-42701本作品屬公共領域之著作。瀏覽日期: 2013/05/01 。