MAzeem_CV
-
Upload
muhammad-azeem -
Category
Documents
-
view
8 -
download
0
Transcript of MAzeem_CV
Muhammad AzeemS/O Muhammad Sharif Naz
Cell +973-38844573Building No: 1239, Flat: 23, Road: 3331, 0933 East
Riffa, BahrainE-mail: [email protected]
JOB EXPERIENCE More than 15 years of experience in the field of IT Business/Technology/Project Management.
March 2015 till to date Gold Coast Communication Technology (Bahrain)
Working as Techno Commercial ManagerResponsibilities/assignments
Managing different team for different project including the subcontractors. Setting budgets and agreeing project time scales and deadlines with clients. Managing staff to ensure that all milestones are achieved within the agreed
timeframes
Ensuring effective quality control processes are in place to monitor deliverables produced.
Maintaining client relationships.
Responsible for identifying, analyzing, measuring and managing project risks.
Ensuring that projects conform to PRINCE methodology and required standards.
Conducting regular impact analysis in order to assess the consequences of the project deliverables on other sections of the business.
Keeping accurate administrative records of expenditure, accounting, costing and billing.
Assisting the technical team in their design and development tasks.
Producing project definitions to include validated functional requirements, scope, roles, responsibilities, budgets, timescales and resources.
January 2013 March 2015 Valor Soft Technologies
Working as Head IT Business Development
Responsibilities/assignments
Managing all kind of departmental affairs.
Provide consultancy regarding different IT project (Networking, Cabling,
Server Infrastructure, Data Center Development and software
development.
Understand the client business requirement and provide them the
relevant support to align their business with IT.
Project management.
Preparing Project Initiation documentation.
Responsible for ensuring best value is obtained for the project including
supplier base, use of internal and external resources.
Maintaining and completing Project Key Performance Indicators.
Writing detailed and summarized project progress reports.
Identifying, costing and processing any contract variations.
Tracking activities against the detailed project plans.
Updating project plans to include agreed changes.
Producing accurate financial reports.
Monitoring actual expenditure figures against project budgets.
Facilitating Project Steering / Operating Committees meetings
Managing VOIP infrastructure for the company contact center
Corporate clients follow ups
Vendor management.
March 2008 till Jan 2013 Kashf Microfinance Bank
Working as Manager IT & ADC (promoted from Manager IT Infrastructure)
Responsibilities/assignments
Managing all kind of departmental affairs.
Plan and implement complete centralized IT infrastructure for a newly
established bank with 31 Branches countrywide.
Design and implement complete data center with DR site.
Configure replication using Commvault Software with two SUN M5000
M5000 machines and two SUN storages in Solaris environment.
Deployment of DXX circuit in all 30 Branches with a backup connectivity
of MPLS
Design and implement complete data center with disaster recovery site
Implement M500 SUN machines for core banking application using
Sybase database.
Implement centralized Email, Internet and DHCP using HP DL 380 servers
for the bank
Develop procurement process for IT and responsible of purchasing all IT
equipment.
Vendor negotiating and finalization of purchase regarding IT
Infrastructure.
Provide secure VPN connectivity for remote branches using CISCO ASA
5505 firewall.
Plan and implement Network security using CISCO firewall 5510
Install and configure WSUS for patch management
Secured the network form virus attacks through centralized Antivirus.
Implement Microsoft licensing
Plane and Implementation of ATM’s with 1-Link switch.
Planning and Deployment of complete IT setup for KIOSK.
Planning of branchless banking.
To deal and integrate with new upcoming banks for branchless banking
products.
Working on SUN VDI solution for branches
Working to deploy VOIP for all branches.
March 2004 March 2008 ABN Amro Pakistan
Worked as Unit Head IDS (Infrastructure Delivery Services)
Responsibilities/assignments
Implementation of Panda Gate defenders
Configuration / implementation of Juniper NetScreen NS50.
Configuration / implementation of Juniper IDP 100.
Designed and developed Data center.
Installation / configuration of L2/L 3 switches
Configuration of DMZ to secure servers
Managing Citrix Servers and Citrix Access Gateways.
Managing and administration of Email, SQL, ISA, MOM and Domain
Controller Servers.
Installation of SAN MSA 1000 / EVA 6100 with DL 580/585 Servers in a
cluster environment.
Design and implement Backup procedures using Veritas Backup exec 10.
Designed and implemented Disaster Recovery Plan (DRP).
Configuring/Monitoring/Troubleshooting of Email Server.
Installation / configuration / monitoring of IVR (Interactive Voice
Response) setup.
Installation and Configuration of HP Server DL 380.
July 2002 - March 2004 Virtual Resource Solutions
Worked As Manager IT/IS
Managing and administering the whole IT dept.
Configured the VOIP setup for the call center using Cisco Routers and
Inter-Tel VOIP exchange.
Designed and configured the LAN including Domain Controller, ISA server,
MS Exchange 2000.
Responsibility to deal with PTCL and with different vendors.
Providing different solutions to different companies in UK for their
networks and call centers.
July 2001 July 2002 Align Technology Pakistan
Worked in the IT Support Department with the following duties:
Troubleshooting, configuration and optimization of LAN consisting of 350+ nodes
Manage and troubleshoot Nortel IP exchange.
Monitoring & reporting of WAN consisting of two 2Mbps IPL from Lahore to Santa Clara (USA) and a 2Mbps IP circuit for Internet
Configuration, troubleshooting and administration of company’s mail server running on Microsoft Exchange Server.
May 2000 – June 2001 Matinn Technologies
Worked as a trainer of Cisco. Responsible of teaching CCNA, CCNP and different network subjects
Projects Date Center ABN Amro - Lahore, Pakistan
o Head the project of re-designing and re-development of the data center in Lahore for ABN Amro Pakistan. It was a tier III data center and it requires to host the most critical banking applications along with the DR site in Karachi. Me and my team got a special reward and bonus and letter of appreciation from the CEO of the bank for the timely delivery of the project.
Data Center – Finca Microfinance bank Formerly Kashf Microfinance Bank
o Kashf Microfinance Bank started their operations in 2008 all over Pakistan, I was hired as Manager IT & ADC and a totally new network infrastructure needs to be build. I was leading all different projects of IT from hiring the team to managing them for different responsibilities. In my supervision the team has built a stat of the art Tier Iv data center and providing all the services along with the mission critical application through centralized data center. The data center was built and implemented by considering all the international standards of power, cooling, data, fiber optic and rack installations and deployed high end SUN servers along with HP servers.
ATM Infrastructure - Finca Microfinance Bank Formerly Kashf Microfinance Bank
o The complete project of ATM machine deployment is handled and initiated by me, selection of the machine, procurement, certification with the ATM switch, deployment plan, ROI documentation, installation and making the project successful within the time limit.
Virtual Resource Solution – Installation/configuration of call center.o Design and implement a project of a UK base Call Center which has
two offices in different location of UK (Coventry). I have used Inter-Tel VOIP telephone exchange DB version 5.0 providing the facility of Hunt Groups, ACD, Trunk call from both sides (remote and local), Call-view (Software which integrates with Inter-Tel exchange) support for call agent/managers and recording servers etc.
Bahrain Defense Force – Implementation of Cryptoflow (Certes Networks)
o Implement Certes Network Solutions to enable the encryption while the data is in motion. This project was recently managed and executed by me, my team has implemented the product between 4 sites. I have done the complete documentation of the project assign different roles to my team and get the delivery of the project within time line.
Academic Qualification
2000 National College of Computer Sciences, Lahore(Attested and verified by University of South Asia)Bachelor of Computer Sciences
Professional Qualification
MCSE2000 Installing, Configuring and Administering Microsoft windows 2000 Professional
Installing, Configuring and Administering Microsoft windows 2000 Server
Implementing and Administering Microsoft windows 2000 Directory Services Infrastructure
CCNA CCNA 2.0 (Cisco Certified Network Associate).
COBIT CIBIT Training from Singapore sponsored by Kashf Bank Pakistan.
Prince2 Complete training sponsored by Kashf Bank Pakistan
ITIL Completed the training for three weeks provided by Kashf Bank Pakistan