Harmony Open House Presentation May 4, 2012

25
FELSBURG HOLT & ULLEVIG PUBLIC MEETING #1 May 3, 2012

Transcript of Harmony Open House Presentation May 4, 2012

Page 1: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

PUBLIC MEETING #1May 3, 2012

Page 2: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Harmony Road is an important corridor for regional and local travel.

Page 3: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Fort Collins Corridors

Page 4: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Harmony Road has evolved over time and this study is the next step in planning for the corridor’s future.

Page 5: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Corridor History and Previous Planning EffortsAg

ricul

tura

l com

mun

ity: “

Har

mon

y” (1

870)

Cons

truc

tion

of I-

25 (1

950s

and

196

0s)

Har

mon

y Ro

ad b

ecam

e St

ate

Hig

hway

68

(196

8)

Har

mon

y Ac

cess

Con

trol

Pla

n (2

000)

Har

mon

y de

velo

ped

as d

ivid

ed h

ighw

ay (e

arly

197

0s)

Har

mon

y tu

rned

ove

r to

City

of F

ort C

ollin

s (2

005)

Orig

inal

Har

mon

y Co

rrid

or P

lan

(199

1)

Upd

ate

to H

arm

ony

Corr

idor

Pla

n (2

006)

Har

mon

y es

tabl

ishe

d as

ETC

in T

MP

(200

4)

Har

mon

y es

tabl

ishe

d as

Reg

iona

lly S

igni

fican

t Cor

ridor

by

NFR

MPO

(200

3)

Har

mon

y Ro

ad B

icyc

le P

roje

ct :

Conc

ept P

lan

(199

6)

Har

mon

y Co

rrid

or D

istric

t Lan

d U

se E

stab

lishe

d (1

997)

Designations Planning EffortsConstruction Projects

Timeline

Tim

berli

ne to

Tec

hnol

ogy

Pkw

y w

iden

ed to

6 la

nes

(200

7)

Tech

nolo

gy P

kwy

to I-

25 w

iden

ed to

6 la

nes

(200

9)

Boar

dwal

k to

Tim

berli

ne w

iden

ing

to 6

lane

s (S

umm

er ‘1

2)

Page 6: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

The cross-section along Harmony Road varies.

Page 7: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Physical Characteristics

Page 8: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Typical Cross-Sections

Page 9: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Today, Harmony Road carries the second highest level of traffic in the City.

Page 10: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Existing Daily Traffic Volumes

Page 11: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

The Harmony Road intersections with College Avenue and with Timberline Road currently experience congestion during the afternoon peak hour.

Page 12: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Traffic Operations

Page 13: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

The City’s top two intersections with the highest crash totals in the City are along Harmony Road (at Timberline Road and at Lemay Avenue).

Page 14: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Intersection Crash Summary (2007 – 2011)

Page 15: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Current bus service along Harmony Road is discontinuous.

Page 16: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Transit Service

Page 17: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

The City has an extensive bike network, including existing bike lanes along Harmony Road; but the bicycle use on Harmony is low.

Page 18: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Existing and Proposed Bicycle Facilities

Page 19: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Sidewalks along Harmony Road are relatively continuous, but there are barriers to crossing the street and accessing corridor land uses. Pedestrian activity in the corridor is low.

Page 20: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Existing Sidewalk Conditions and BarriersSidewalk Conditions

Barriers to Crossing

Barriers to Accessing Land Use

Page 21: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

5,800 new households are expected along the Harmony corridor by 2035 (42% increase).

Page 22: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Household Growth

Page 23: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

14,900 new jobs are expected along the Harmony corridor by 2035 (71% increase).

Page 24: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

Employment Growth

Page 25: Harmony Open House Presentation May 4, 2012

FELSBURG HOLT & ULLEVIG

For more information join us at a fun, interactive open house to discuss the future of Harmony Road

on Thursday May 3, 4-7 PM at the Spirit of Joy Lutheran Church, 4501 S. Lemay Ave.

For more info, visit fcgov.com/harmony.

Thank you for your interest in this project!