Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas...

30
1 st Post Combustion Capture Conference Development of Carbon Dioxide Removal System from the Flue Gas of Coal Fired Power Plant May 19, 2011 Yukio Ohashi 1 , Takashi Ogawa 1 , Kensuke Suzuki 2 1 Toshiba Corporation, 1 Toshibacho Fuchu, Tokyo 183-8511, Japan 2 Toshiba Corporation, 1-1-1 Shibaura Minato-ku, Tokyo 105-8001, Japan 1 / 30 © TOSHIBA CORPORATION 2011, All rights reserved.

Transcript of Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas...

Page 1: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

1st Post Combustion Capture Conference

Development of Carbon Dioxide Removal System from the Flue Gas of Coal Fired Power Plant

May 19, 2011

Yukio Ohashi1, Takashi Ogawa1, Kensuke Suzuki2

1Toshiba Corporation, 1 Toshibacho Fuchu, Tokyo 183-8511, Japan2Toshiba Corporation, 1-1-1 Shibaura Minato-ku, Tokyo 105-8001, Japan

1 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 2: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

2 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 3: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

< Digital Products Group >

Toshiba Corporation Organization< Digital Products Group >

Digital Products & Service Company

Network & Solution Control Center

Storage Prod cts Compan

President & CEO < Electronic Devices & Components Group >

Storage Products Company

TOSHIBA TEC CORPORATION

N i S ki Semiconductor Company

< Infrastructure Systems Group >

Toshiba Mobile Display Co., Ltd.

Norio Sasaki

Social Infrastructure Systems Company

Power Systems CompanyThermal & Hydro Power Systems & Services Div.

Social Infrastructure Systems Company

TOSHIBA ELEVATOR AND BUILDING SYSTEMS CORPORATION

Toshiba Solutions Corporation

TOSHIBA MEDICAL SYSTEMS CORPORATION

Toshiba CorporationHeadquarters, Tokyo

3 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

As of April 1, 2011TOSHIBA MEDICAL SYSTEMS CORPORATION

Page 4: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Thermal Power Plants

Toshiba’s Energy Products & ServicesThermal Power Plants

Nuclear Power PlantsHydro Power Plants

Photovoltaic & Renewable Energies Hydro Turbines

Steam TurbinesTurbine Generators

Hydro Generators

C&I Systems

Smart Grid / Smart Communities

4 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

C&I SystemsT&D Systems

Page 5: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Toshiba’s Thermal Power Plant Turbines

Wide range Output and Steam Condition

Turbine Configuration

L t St B k t i750~1100MW

Last Stage Bucket series

High Efficiency

State-of-the-Art Steam Path Technology

600~750MW

Multipurpose

Conventional Power Plant

Combined Cycle Power Plant

450~600MW

Combined Cycle Power Plant

CHP Plant

~150MW

150~450MW.

150~600MW

Multipurpose

i.e. CHP Plant

5 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Toshiba is the one of most experienced power system turbine providers in the world

Page 6: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

T t l 1 896 U it 168 267 MW (A f M h 2011)

Toshiba Turbine Power Plants - Worldwide

Total: 1,896 Units, 168,267 MW (As of March 2011)

Canada10 Units

USA98 Units

30,022 MWIndia13 Units

4 948 MW

Kuwait22 Units

Iran4 Units

255 MW

Pakistan3 Units

137 MW

1,427 MWThailand8 Units

348 MW

4,948 MW4,470 MW

China(incl. Taiwan Region)

49 Units12,037 MW

Bulgaria3 Units

532 MW

Iceland

Mexico30 Units Antigua

Korea28 Units

2,138 MW

Cyprus

Puerto Rico1 Unit

214 MW

Japan1,447 Units

81 134 MW

Italy4 Units

994 MW

UK1 Unit

210 MW

1 Unit34 MW

2,512 MW

C t Ri

g2 Units

18 MW

Brazil

Venezuela7 Units

1,418 MW

Philippines27 Units

1,114 MW

Nigeria4 Units

Egypt6 Units

1,764 MW

2 Units120 MW

Papua New Guinea

Nauru1 Unit

0.1 MW

81,134 MW

UAE4 Units

968 MW

Costa Rica1 Unit

55 MW

Brazil3 Units

155 MW

Argentina3 Units

14 MWAustralia

Indonesia18 Units

4, 416 MW

Malaysia22 Units

Sri Lanka1 Unit6 MW

Botswana1 Unit

33 MW

4 Units56 MW Lebanon

4 Units130 MW

Bahrain1 Unit

65 MW

Bangladesh5 Units

41 MW

3 Units135 MW

MyanmarSouth Africa

6 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Australia55 Units

11,672MW

22 Units4556 MW2 Units

118 MW

33 MW Myanmar2 Units

0.9 MW

South Africa

[ PRD-GMG-GES-0016 Rev.19 ]

Page 7: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

7 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 8: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Toshiba Group Environmental Vision 2050

( Toshiba Group Environmental Report 2009 )

Ad d Hi h Effi i C l d CCS t h l l it l l

8 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Advanced High Efficiency Cycles and CCS technology play vital role in reduction of CO2 in the Thermal Power Plant arena

Page 9: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

CO2 Reduction in Thermal Power Plants1400

/ kW

h) 1200

1400

Sub Critical

ns (g

ram

s

800

1000

A-USC

Sub Critical

USC

2 E

mis

sion

400

600

CO

0

200USC+CCS( 90% CO2 Capture )

A-USC+CCS( 90% CO2 Capture )

Plant Net Efficiency (LHV)Substantial CO2 reduction is realized by Integration and Optimization of

030 35 40 45 50 55 60

9 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Substantial CO2 reduction is realized by Integration and Optimization ofBoth High efficiency Turbine Cycles and CCS technology

Page 10: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

10 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 11: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

System Verification and ImplementationP-23

P-36

E-1 Stirpper

E-3

E-4

P-2P-3

P-6

P-7

P-8

P-10

E-8

P-12

P-14

E-11E-12

P-15

P-16

P-17

P-18

P-19

P-20

I-1

V-1 P-21

E-13I-2

P-25 P-26P-27

E-16

P-33 P-34

I-4

V-3 P-35

I-5

P-38

E-17

P-39P-38

E-18

P-40

E-19

P-41

P

I-6

I-8

T

I-9

P-10

T

I-10

P-45

P-11

T

I-11

T

I-12

P-46

P-13P-47 P-7

T

I-13

P-48P-33

P

I-14 P-49

P

I-16

P-50

P-11

P-51

P-52

GC

C

GCGC

E-5

E-6

P-1

P-2

E-7

P-9P-11

I 6P-42 P-9

T

I-7

P-43

N2 NOxSOxCO2O2

I-1I-1I-1I-1I-1

LC

LC

Screening of Absorbents andEvaluation of SystemEvaluation of SystemPerformance Improvementby Simulation Overall Demonstration at

Mikawa - PCC Pilot Plant

E l i f B i P i P f / D d ti D i f F ll S l

11 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Evaluation of Basic Propertiesand Absorption Performance

Performance / DegradationEvaluation by Small Loop

Design of Full Scale Demonstration Plant

Page 12: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Toshiba PCC Pilot Plant at Mikawa

Plot Plan:

Turbine Unit #2Steam Turbine

PCC Pilot Plant

Location:

Test Facility

Tokyo

ESP

T bi U it #1BoilerFGD Stack

Sigma Power Ariake Co., Ltd.Turbine Unit #147.5 MW Coal Fired

Mikawa Power PlantOmuta City, Fukuoka, Japan

12 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Mikawa: Toshiba’s Showcase of Low Emission Thermal Power Technology

Page 13: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

PCC Pilot Plant - Schematic

13 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 14: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

PCC Pilot Plant - Specification

ik h l lTable 1 Pilot Plant Specification

Location Mikawa Thermal Power Plant SIGMA POWER Ariake Corp.

Source Gas Flue Gas of Coal-Fired Boiler

T t d G Fl R t 2100 3/hTreated Gas Flow Rate 2100Nm3/h

CO2 Concentration Approx. 12%

CO2 Capture Ratio 90%

Captured CO2 10t-CO2/day

Impurities SOx, NOx, Dust, etc

Solvent TS-1 SolventSolvent TS 1 Solvent

Mikawa PCC Pilot Plant

14 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 15: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

2009 20102008

PCC Pilot Plant - Schedule and Tests2011

5,000

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5121110 6

Engineering& Permits

Commissioning

Material Procurement,Manufacturing &

ConstructionTest Period-1 Mod Test

Period-2 Mod

7

Test Period-3

O ti H t D t 4308 H ( f F b 24 2011)

8 9 10 11 12 1 2 3

Mod ModTestPeriod-4

TestPeriod-5

3,0003,5004,0004,500

Test Period-1

Test Period-2Performance Tests

atin

g H

ours Operating Hours to Date:4308 Hours (as of February 24, 2011)

Test Period-4Performance Tests

5001,0001,5002,0002,500 Process Evaluation

Test Period-3ulat

ive

Ope

raTest Period-5

Performance Tests

0500

'09/9/

1'09

/10/21

'09/12

/10'10

/1/29

'10/3/

20'10

/5/9

'10/6/

28'10

/8/17

'10/10

/6'10

/11/25

'11/1/

14'11

/3/5

Absorbent Life Test/Load Change Tests

Date

Cum

u

Process Evaluation : Ensure Stable Operation and Good Measurement AccuracyPerformance Tests : Seek Higher CO2 Capture Efficiency and Lower Capture EnergyAbsorbent Life Test : Assess Absorbent Degradation by Live Flue GasLoad Change Tests : Evaluate Response at Transient Operations

15 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

g p p

Operating Hours to Date: 4308 Hours (as of February 24, 2011)

Page 16: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

16 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 17: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - CO2 Recovery Energy (2010)

85

90

95

100

re R

atio

[%]

90%

10

11

12

d C

O2

[t/D

]

10 t/D

70

75

80

85

CO

2 C

aptu

8

9

10

Cap

ture

d

2.8 2.9 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8CO2 Recovery Energy [GJ/t-CO2]

2.8 2.9 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8

CO2 Recovery Energy [GJ/t-CO2]

CO2 Recovery Energy: 3.2 ~ 3.3GJ/t-CO2 @ 90% Capture

17 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 18: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - Performance Degradation (2010)

80

90

100

%] 16

18

20

]

50

60

70

ture

Rat

io[%

10

12

14

ed C

O2

[t/D

20

30

40

CO

2 C

apt

4

6

8

Cap

ture

● CO2 Capture RatioC t d CO

0

10

20

0 500 1000 1500 2000 2500 30000

2

4○ Captured CO2

Performance Stable over 2800 Hours of Continuous Operation

0 500 1000 1500 2000 2500 3000

Operating Time [hr]

18 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 19: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - Solvent Degradation (2010)

100kP

a]After 2800h @120℃ New & Clean @40℃

Pre

ssur

e [k

New & Clean @120 ℃

10

Par

tial P

10 10 20 30 40 50

CO

2

After 2800h @40℃

No Detrimental Degradation after 2800 Hours of Continuous Operation

0 10 20 30 40 50CO2 Loading [NL/L]

19 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 20: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - Solvent Degradation (2010)

89

10er

gy●After 2800h▲New & Clean

5678

over

y E

neO 2

-ton]

2345

CO

2R

eco

[G

J/C

01

0 10 20 30 40

C

No Detrimental Degradation after 2800 Hours of Continuous Operation

CO2Loading [NL/L]

20 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 21: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - Solvent Degradation (2010)

10000m

]

6000

8000

nic

Aci

dat

ion

[ppm

MEA 30wt%

MEA 20wt%

2000

4000

Car

bon

Con

cent

ra MEA 20wt%

TS-1

0

2000

0 500 1000 1500 2000 2500 3000

C

Amine Degradation lower than Conventional Amine Technologies

Operating Time [hr]

21 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 22: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - Amine Emissions (2010)

5

6

Gas

[ppm

]

Degraded Amine

Amine Emission from Absorber

3

4or

ber E

xit G Amine

2

3

ion

in A

bso

0

1

Con

cent

rati

without Water Wash with Water WashC

Amine Emissions are Controlled, Evaluated and Monitored

22 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

,

Page 23: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results – Material Test Piece (2010)

BufferTank

Flue Gasto Stack

L S l t

CO2

Corrosion Coupon Tests

TankAb

sorb

er

Stri

pper

Lean SolventCooler

Rich SolventLean

Solvent

Condenser& Separator

RefluxPump

Lean SolventPump

HeatExchanger

Rich Solvent Pump

Flue Gasfrom FGD

Reboiler

Solvent

Steamfrom Turbine

Drain

Test Pieces

SS400SUS304SUS316SUS316SUS316L

23 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

No Substantial Degradation is found to Present

Page 24: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Results - CO2 Recovery Energy (2011)

PCC Pil t Pl t S t M difi d i 2011 t I CO Ri h L di

100]

PCC Pilot Plant System Modified in 2011 to Improve CO2 Rich Loading

85

90

95

e R

atio

[%]

75

80

85

O2C

aptu

re

70

75

2.00 2.20 2.40 2.60 2.80 3.00

CO

CO2 Recovery Energy [GJ/t-CO2]

24 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

CO2 Recovery Energy: ~ 2.6 GJ/t-CO2 @ 90% Capture

Page 25: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

25 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 26: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Solvent Screening - Simulation

Thermodynamic Simulation Conducted to Search for Improved Performance

2.9

O2]

2 7

2.8gy

[GJ/

t-CO

2.6

2.7

over

y E

nerg

2.5

CO

2R

eco

Future Solvent Candidates are Screened through Simulation

2.4TS-1 +A +B +C +D +E +F

26 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Future Solvent Candidates are Screened through Simulation

Page 27: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Solvent Screening – Bench Scale Test

2 93.0

O2]

Test Results of Bench-scale Test Facility

2 62.72.82.9

ergy

[GJ/

t-CO

2.32.42.52.6

Rec

over

y E

ne

2.02.12.2

TS 1 T=10K T=8K T=5K

CO

2R

Bench Scale Test

Evaluation of Promising Solvents are Conducted at Bench Scale

TS-1( T=5K)

T=10K T=8K T=5K

27 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Evaluation of Promising Solvents are Conducted at Bench Scale

Page 28: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Contents

1 Toshiba Power Systems Overview1. Toshiba Power Systems Overview2. Decarbonizing Thermal Power3. Development of Carbon Capture Technology3 e e op e t o Ca bo Captu e ec o ogy4. Pilot Plant Results5. Future Solvent Screening6. Summary

28 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 29: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Summary

• Toshiba Corporation holds a well respected history as leading and reliable thermal power plant technology supplier in the global market.

• Toshiba has positioned Carbon Capture as one of the key technologies to decarbonize thermal power plant.

• In view of actual application to power plants, Toshiba constructed itsIn view of actual application to power plants, Toshiba constructed its PCC Pilot Plant in Mikawa (Japan), which works to actual live flue gas of a coal fired thermal power plant. The plant has accumulated more than 4300 hours of operation to date.

• High performance of Toshiba solvent system was proven in 2010 tests, and was improved further by system modification made in 2011.

• Toshiba’s search for improved performance solvents and system application continues through its comprehensive system verification and implementation program.

29 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Page 30: Development of Carbon Dioxide Removal System … of Carbon Dioxide Removal System from the Flue Gas of Coal ... Digital Products & Service Company ... Rich Solvent Pump Flue Gas from

Thank You !

For more information, contact:Mr. Kensuke SuzukiGroup Manager - CCS Plant Planning GroupThermal & Hydro Power Systems & Services DivisionToshiba Corporation Power Systems Company

30 / 30© TOSHIBA CORPORATION 2011, All rights reserved.

Toshiba Corporation Power Systems Companye-mail: [email protected]