03-Reporting & Record Keeping

download 03-Reporting & Record Keeping

of 88

description

ehsan moy

Transcript of 03-Reporting & Record Keeping

  • 300/NOM/TNM/1PS :edoC tnemucoD

    ..FF..TT..TT : : :

    EECCNNAANNEETTNNIIAAMM

    GGNNIIPPEEEEKK DDRROOCCEERR && TTRROOPPEERR

    10.veR

    8831/11/018831/01/60 8831/11/01: : :

  • 2 | egaP

    2.................................................................................................................................

    4...................................................................................................RQP SPW

    01.......................................................................................TU TP

    61............................

    81............................................................................................................

    91..................................

    12........ RO TSET YADILOH TSET KRAPS TSET ELOHNIP

    22.......................................................................................

    32.................................................

    62

    ....................

    5-TAGI ...................................................................................................82

  • 3 | egaP

    :

    .

    eht gnivreserp ,ekil eht ro gnitirw ni tnuocca na sa drocer senifed )5002 .de ht4( yranoitciD eirauqcaM ehT

    .ekil eht ro gnitirw ni devreserp ,egdelwonk ro noitamrofni sa ro stneve ro stcaf fo egdelwonk ro yromem

    ,gnidrocer dnuos a gnidulcni( tcejbo ro )lairetam detnirp ro nettirw yna gnidulcni( tnemucod a snaem drocer

    ro gnitniap a ro ledom ro nalp ,pam ,mlif ,hpargotohp ,mroforcim ,csid ro epat citengam ,ecived egarots dedoc

    sniatnoc ti taht rettam ro noitamrofni yna fo nosaer yb tpek ,neeb sah ro ,si taht )krow cihparg ro lairotcip rehto

    .gniht ro ecnatsmucric ,nosrep ,tneve yna htiw noitcennoc sti fo nosaer yb ro ti morf deniatbo eb nac ro

    :

    RQP SPW -

    TU TP -

    -

    -

    -

    RO TSET YADILOH TSET KRAPS TSET ELOHNIP -

    -

    -

    -

    -

    ADCE -

    : 8.13B EMSA

    -

  • 4 | egaP

    -

    .

    RQP SPW - ERUDECORP GNIDLEW(

    )NOITACIFICEPS

    )DROCER NOITACIFILAUQ ERUDECORP(

    :

    . (1.. (2. (3 (4

    ..

    (5.

    (6.

    )RQP(

    . )TQW(

    .

    :

    1.1D SWA XI .ces EMSA

    056IPA

    -NE . 4011IPA

    . 882

  • 5 | egaP

    4011 IPA RQP SPW

    .

  • 6 | egaP

    .

  • Page | 7

    FIELD TEST/INSPECTION REPORTWELDING PROCEDURE SPECIFICATION (WPS)

    COMPANY NAME WELDING PROCEDURE SPECIFICATION NO. DATE SUPPORTING PQR NO. REVISIONS

    WELDING PROCESS(ES) TYPE(S)PROCEDURE QUALIFICATION RECORD NO. (S) JOINTS(QW-402)

    GROOVE DESIGN

    BACKING : YES NO

    BACKING MATERIAL(TYPE)

    POSTWELD HEAT TREATMENT (QW-407)

    TEMPERATURE

    TIME RANGE

    OTHER

    OTHER GAS (QW-408)

    SHIELDING GAS(ES)

    BASE METALS (QW-403)

    P.NO. TO P.NO.

    THICKNESS RANGE

    PIPE DIA. RANGE

    OTHER

    PERCENT COMPOSITION(MIXTURES)

    FLOW RATE

    GAS BACKING

    TRAILING SHIELDING GAS COMPOSITION

    FILLER METALS (QW-404)

    F. NO. OTHER OTHER

    A. NO. OTHER

    SPEC. NO.(SFA)

    AWS NO. (CLASS)

    SIZE OF ELECTRODE OR

    ELECTRICAL CHARACTERISTIC (QW-409)

    CURRENT AC OR DC POLARITY

    AMPS(RANGE) VOLTS(RANGE)

    OTHERS

    SIZE OF FILLER

    ELECTRODE-FLUX(CLASS)

    CONSUMABLE INSERT

    OTHER

    TECHNIQUE (QW-410)

    STRING OR WEAVE BEAD

    ORIFICE OR GAS CUP SIZE

    Initial & Interpass Cleaning (Brushing, Grinding, etc.)

    POSITION (QW-405)

    POSITION OF GROOVE

    WELDING PROGRESSION : UP DOWN METHOD OF RACK GOUGING

    OTHER OSCILLATION

    PREHEAT (QW-406)

    PREHEAT TEMP.

    INTERPASS TEMP.

    PREHEAT MAINTENANCE

    OTHER

    CONTACT TUBE TO WORK DISTANCE

    MULTIPLE OR SINGLE PASS(PER SIDE)

    MULTIPLE OR SINGLE ELECTRODES

    TRAVEL SPEED(RANGE)

    OTHER

    WELD FILLER METAL CURRENT VOLT

    LAYER (S) CLASS DIAMETER RANGEAMPERE

    RANGE

    TYPE POLARITY

    TRAVEL

    SPEEDOTHERPROCESS

  • Page | 8

    GROOVE DESIGN USED

    60

    3

    10

    PROCEDURE QUALIFICATION RECORD (PQR)

    COMPANY NAME PROCEDURE QUALIFICATION RECORD NO. DATE WPS NO.WELDING PROCESS(ES)TYPE(MANUAL AUTOMATIC, SEMI-AUTOWELDING PROCEDURE SPECIFICATION NO.

    JOINT (QW-402

    BASE METALS (QW-403)MATERIAL SPEC. TYPE OR GRADE P NO. TO P NO. THICKNESSDIAMETER

    POSTWELD HEAT TREATMENT (QW-407)TEMPERATURE TIME OTHER

    OTHER GAS (QW-408)TYPE OF GAS (ES)COMPOSITION OF GAS. MIXTUREOTHER

    FILLER METALS (QW-404)WELD METAL ANALYSIS A NO.SIZE OF ELECTRODEFILTER METAL F NO.SFA SPECIFICATIONAWS CLASSIFICATIONOTHER

    ELECTRICAL CHARACTERISTICS (QW-409)CURRENTPOLARITYAMPS VOLTS OTHER

    POSITION (QW-405)POSITION OF GROOVEWELD PROGRESSION (UPHILL, DOWNHILL) TECHNIQUE(QW-410)OTHER TRAVEL SPEED

    STRING OR WEAVE BEADPREHEAT (QW-406)PREHEAT TEMP.INTERPASS TEMP.OTHER

    OSCILLATIONMULTIPASS OR SINGLE PASS(PER SIDE)MULTIPLE OR SINGLE ELECTRODESOTHER

    NOTE :

  • Page | 9

    FIELD TEST/INSPECTION REPORTPROCEDURE QUALIFICATION RECORD (PQR)

    TENSILE TEST (QW-150)

    SPECIMENNO

    WIDTHmm

    THICKNESS mm

    AREAmm2

    ULTIMATETOTAL LOAD

    kg

    ULTIMATEUNIT STRESS

    kg/cm2

    CHARACTER OF FAILURE &

    LOCATION

    GUIDED BENDED TESTS (QW-160)TYPE AND FIGURE NO. RESULT

    BENDBENDBENDBEND

    TOUGHNESS TESTS (QW-170)SPECIMEN NOTCH NOTCH TEST. IMPACT LATERAL EXP. DROP WEIGHT

    LOCATION TYPE TEMP. VALUES % SHEAR MILS BREAK NO BREAK

    FILLET WELD TEST (QW-180)RESULT-SATISFACTORY: YES NO PENETRATION INTO PARENT METAL: YES

    NOTYPE AND CHARACTER OF FAILURE MACRO-RESULTS

    OTHER TESTSTYPE OF TESTDEPOSIT ANALYSISOTHER

    CERTIFICATE OF COMPLIANCE

    WELDERS NAME CLOCK NO. STAMP NO.TESTS CONDUCTED BY LABORATORY TEST NO.WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT THE TEST WELDS WERE PREPARED WELDED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION IX OF THE ASME CODE.

    MANUFACTURERDATE BY

    CHIEF OF INSPECTION SECTION(DETAIL OF RECORD OF TESTS ARE ILLUSTRATIVE ONLY AND MAY BE MODIFIED TO CONFORM TO THE TYPE AND NUMBER OF TESTS REQUIRED BY THE CODE.)

  • 01 | egaP

    TU TP -

    ( ) TNARTENEP .

    .

    .

    .

  • Page | 11

    FIELD TEST/INSPECTION REPORT

    LIQUID PENETRANT EXAMINATION

    APPLICABLE CODE STAGE OF EXAMINATION

    MATERIALPREPARED EDGE AFTER P.W.H.T OTHERS

    AS WELDED AFTER HYDROTEST

    SURFACE PREPARATION GRINDING MACHINING OTHERS

    TYPE COLOR CONTRAST FLUORESCENT

    PENETRANT APPLICATION BRUSHING SPRAYING

    TEMPERATURE PENETRANT TIME MINUTES

    WATER-WASHABLE PENETRANTS DRY DEVELOPERREMOVAL POST-EMULSIFYING PENETRANTS

    SOLVENT-REMOVABLE PENETRANTSDEVELOPING

    WET DEVELOPERLOCATION EXAMINED

    REFER TO ATTACHED TEST LOG

    JUDGMENTSATISFACTORY

    UNSATISFACTORY

    ATTACHED REPORT

    SIGNATURE : Witnessed/Reviewed by SIGNATURE: LG E&C SIGNATURE: CUSTOMER

    ( ICIIC ) ( LG E&C ) (CONTRACTOR)

    DATE DATE DATE

  • Page | 12

    FIELD TEST LOG - LIQUID PENETRANT EXAMINATION

    LG E&C JOB NO. REPORT NO.

    CONTRACT NO. AREA

    LINE NO. R 1 R 2 R 3

    & WELD WELDER DATE PASSED WELDER PASSED WELDER PASSED WELDER PASSED

    SHEET NO. NO. SYMB. YES NO SYMB. YES NO SYMB. YES NO SYMB. YES NO

  • 31 | egaP

    .

    THGIARTS

    ELGNA

    .

    TU

    ( ) .

    .

    .

    .

    .

    .

  • Page | 14

    FIELD TEST/INSPECTION REPORT

    ULTRASONIC EXAMINATION

    LG E&C JOB NO. REPORT NO. PROJECT NAME DATE NAME OF EQUIPMENT AND IDENTIFICATION NO.

    APPLICABLE CODE STAGE OF EXAMINATION

    MATERIAL AS WELDED AFTER HYDROTESTAFTER P.W.H.T OTHERS

    METHOD STRAIGHT BEAM ANGLETYPE OF EQUIPMENT

    COUPLANT WATER MOTOR OIL CMC GLYCERINEDETECTING DIRECTION AXIAL RADIAL CIRCUMFERENTIAL OTHERS

    TYPE FREQUENCY MHzTRANSDUCER NORMAL STRAIGHT

    ANGLE 45Deg 60Deg 70DegSENSITIVITY STANDARD TEST BLOCK

    STETTING SENSITIVITYSCANNING

    LOCATION EXAMINED

    REFER TO ATTACHED TEST LOG

    JUDGMENT SATISFACTORYUNSATISFACTORY

    ATTACHED REPORT

    SIGNATURE : Witnessed/Reviewed by SIGNATURE: SIGNATURE:

    ( ICIIC ) ( LG E&C ) (CONTRACTOR)

    DATE DATE DATE

  • Page | 15

    FIELD TEST/INSPECTION REPORT

    FIELD TEST LOG - ULTRASONIC EXAMINATION

    LG E&C JOB NO. REPORT NO. CONTRACT NO. AREA

    LINE NO. R 1 R 2 R 3& WELD WELDER DATE PASSED WELDER PASSED WELDER PASSED WELDER PASSED

    SHEET NO. NO. SYMB. YES NO SYMB. YES NO SYMB. YES NO SYMB. YES NO

  • 61 | egaP

    -

    .

    MTSA

    .

    002 .

  • Page | 17

  • 81 | egaP

    -

  • 91 | egaP

    -

  • Page | 20

  • Page | 21

    - PINHOLE TESTSPARK TEST HOLIDAY TEST OR

  • 22 | egaP

    -

    NOISORROC ( )

    02 ECNAWOLLA REDRO .

    ( + )

    REDRO .

    ( + )

    .

    .

  • 32 | egaP

    -

    :

    . -1 -2

    .

    . -3

    .

    . -4 ( mC.0002 ) -5

    .

    . -6 .

    . -7 -8

    .

    9610PR ECAN

    . 58.0-

  • 42 | egaP

    . )tcetorpnU dna tcetorP( ffO/nO

    tcetorpnU tcetorP )ffO(

    . ( )

  • 52 | egaP

    .

    .

    : .

    . -1 .

    .

    . )ecaF egnalF(

    .

    . -2 .

    .

    teksaG 2 -3 . teksaG

    :

    .

    .

    . vm

    . vm

    . ( )

  • 62 | egaP

    028-PT-I-SPI 028-PT-I-SPI - 028-PT-I-SPI -PT-C-SPI dlewdaC )sdlewomrehT ro sdleW timrehT(

    028

    028-PT-I-SPI

    pooL R/T 3002,60-075-3-CFU edonA eht revo yevruS

    -

    .

    :

    tset ssenthgit taes .sserp tes

    . . erusserp kcab

  • Page | 27

  • 82 | egaP

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: BUILDING DESCRIPTION OF WORK: BUILDING

    ITP NO.: 602C-000-QA-QA-031-D00 REV.: 0 PAGE: 4 OF 9

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SEPEC. OR

    PROCEDURE

    REPORTING FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    1

    2 3 4 5

    PLUMBING SYSTEM SERVICE PRESSURE TEST TEST /DRAINAGE EXPOSED CONDUIT PAINTING FINAL VISUAL INSPECTION PUNCH LIST

    VISUAL

    VISUAL ELECTRICAL SPEC

    PAINTING SPEC VISUAL

    FORM:QA-QA-31-01

    FORM:QA-QA-31-01 FORM:QA-QA-65-01 FORM:QA-QA-81-01 FORM:QA-QA-65-01

    H

    H H H H

    W

    W W W W

    H

    H W H H

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    FINAL VISUAL INSPECTION (PUNCH LIST) ITEM NO. :

    LOCATION :

    SIGNATURE

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    DRAWING NO (S).: ACCEPTANCE CRITERIA :

    NO. NON-CONFORMANCE AND REFERENCE REMEDIAL ACCEPTANCE

    INITIAL DATE ACC REJ

    COMMENTS

    LEGEND: N/A: Not Applicable FORM:QA-QA-65-05 Rev. 00

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    INSPECTION EXPOSED CONDUIT ITEM NO. : LOCATION :

    SIGNATURE INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR. COMPANY'S INSPECTOR : / / / / / / CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR : DRAWING NO (S). : INSPECTIONCRITERIA :

    YES NO

    Support and spacing as per specification and drawing Support adjacent to terminal fitting Conduits clean, Stub-ups protected, Open ends plugged, not damaged during construction period Field bend radius correct per specification and cod, bends free of deformities Expansion joint as shown on drawing Installed neat and evenly spaced Spacing between instrument and power conduit as per specification Spacing from hot pipes and from hot surface maintained Conduit permanently and effectively grounded Proper fitting installed with threads fully engaged, proper sealing compound used, no wrench cuts, conduit ends have bushing and covers installed

    Seals and drains installed per drawing Aluminum, PVC or PVC coated conduits installed where specified on drawings Flexible conduit installed with proper bending radius and with standard fitting Metal junction boxes leveled and supported per drawing with proper hubs, locknuts and bushing installed

    Seals poured

    Remarks and Deviation:

    LEGEND: N/A: Not Applicable FORM:QA-QA-65-01 Rev. 00

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    PAINTING APPLICATION ITEM NO. :

    LOCATION :

    SIGNATURE

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    HUMIDITY%: Dew Point Temp: Paint Material/Manufacturer:

    PAINTING: Intermediate Final Touch-up

    ROOM NO SURFACE CONDITION PAINT SYSTEM NO.

    RESULT

    ACC

    REJ

    COMMENTS

    LEGEND: ACC: ACCEPT REJ: REJECT N/A: Not Applicable FORM:QA-QA-81-01 Rev. 00

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    WATER TEST ITEM NO. :

    LOCATION:

    SIGNATURE

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    LOCATION PRESSURE TIME

    ACC REJ ACC REJ ACC REJ START END

    COMMENTS

    LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-31-01 Rev. 00

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: PIPING DESCRIPTION OF WORK: A/G PIPING WORK

    ITP NO.: SPY-3-0000-CM-PR-051 REV.: 4 PAGE: 4 OF 22

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    1 1.1

    1.2

    1.3

    1.4

    2 2.1 2.2 2.3 2.4 2.5 2.6 2.7

    MATERIAL RECEIVING INSPECTION Verify the material Classification, grade, identified condition, size and quantity Check physical condition for damage, dent, corrosion, etc. Review receiving inspection report & mill certificate Inspection piping materials in storage

    WELDING, WELDER & WELDING OPERATOR QUALIFICATION

    WPS/PQR Preparation of preliminary WPS Confirm the preparation condition of PQ test Monitoring welding parameters Visual inspection NDT/PWHT repot Laboratory test Qualification documents (WPS/PQR)

    602-000-PI-SP-001

    602-000-PI-SP-001 & 602-000-PI-SP-008

    602-000-PI-SP-010 & 017 ASME Sec. IX

    QA-G-03

    QA-G-03

    QA-G-02

    (Related Procedure Issued later)

    QA-QA-51-03 QA-QA-51-04 & 08

    Lab. Report Issued later

    H

    H

    R

    H

    R H H H W

    SW H

    H

    H

    R

    H

    R H H H H H H

    W

    SW

    R

    SW

    R W W W

    SW/R W H

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: PIPING DESCRIPTION OF WORK: A/G PIPING WORK

    ITP NO.: SPY-3-0000-CM-PR-051 REV.: 4 PAGE: 5 OF 22

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    3 3.1 3.2 3.3 3.4 3.5

    4 4.1 4.2 4.3

    5 5.1

    5.2

    Welder / Welding operator qualification Confirm the preparation condition of test Welding test Visual Inspection NDT or Bend test Welders Qualification document

    FABRICATION AND ERECTION Material verification Material classification and grade Size, thickness and color coding Physical classification

    Identification Material classification and heat number traceability Spool identification (Dwg. No. / spool No.)

    602-000-PI-SP-010 & 017 & ASME Sec. IX

    602-000-PI-SP-010 & 602-000-PI-SP-001 & 602-000-PI-SP-008

    (Related Procedure Issued later)

    QA-G-03

    H H -

    -

    H

    H H H

    H

    H

    H H H H H

    W W W

    W

    W

    W H W W H

    W W W

    SW

    SW

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: PIPING DESCRIPTION OF WORK: A/G PIPING WORK

    ITP NO.: SPY-3-0000-CM-PR-051 REV.: 4 PAGE: 6 OF 22

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE

    SPEC. OR PROCEDURE

    REPORTING FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    6 6.1

    6.2

    6.3 6.4

    7

    8 9

    10 10.1 10.2 10.3 10.4

    Fit-up Applicable WPS/welder/welding consumable / WPS and welder ID Fit-up condition (alignment, root gap, cleaning, etc.) Spool configuration and dimension Pipe inside cleaning

    Preheating (if required) Welding Final visual Inspection for welded joint

    NON-DESTRUCTIVE EXAMINATION Radiographic examination Magnetic particle examination Ultrasonic examination Liquid penetration examination

    ASME B31.3

    ASME B31.3

    ASME Sec. V ASME Sec. V ASME Sec. V ASME Sec. V

    QA-QA-51-01 QA-QA-51-02

    QA-QA-51-03

    QA-QA-51-04 QA-QA-51-05 QA-QA-51-06 QA-QA-51-07

    H

    H

    H H

    H W H

    W W W W

    H

    W

    W W

    W SW W

    W/R W W W

    SW

    W

    W SW

    SW SW SW

    W/R SW/R SW/R SW/R

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: PIPING DESCRIPTION OF WORK: A/G PIPING WORK

    ITP NO.: SPY-3-0000-CM-PR-051 REV.: 4 PAGE: 7 OF 23

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE

    SPEC. OR PROCEDURE

    REPORTING FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    11 11.111.2 11.3

    12

    12.1 12.2 12.3 12.4

    13 13.1 13.2 13.3 13.4 13.5

    PWHT Preparation condition of heat treatment Hardness test PWHT report and chart

    SPOOL RELEASE AND STORAGE (ONLY FOR SHOP FABRICATION) Spool release Inside Cleaning and end capping Spool identification Storage

    PRESSURE TEST Test Package Walk down Punch clear Flushing before test Pressure gauge calibration

    ASME B31.3 ASTM A833

    ISO Dwg.

    As per PWHT procedure, Doc. No.

    SPY-3-000-CM-PR-218

    QA-QA-51-09 QA-QA-51-02

    QA-QA-51-10 QA-QA-51-11

    Certificate

    W H H

    H H H W

    H H H H H

    W W/R W/R

    W W W W

    R H H H W

    W SW/R SW/R

    W SW SW SW

    R H H W W

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: PIPING DESCRIPTION OF WORK: A/G PIPING WORK

    ITP NO.: SPY-3-0000-CM-PR-051 REV.: 4 PAGE: 8 OF 23

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    13.6 13.7

    14

    Pressure/Leak test and visual inspection Drain and/or drying

    PAINTING (it shall be done according to Painting & Coating ITP , ITP NO.: SPY-3-0000-CM-PR-081)

    602-000-PI-SP-017

    QA-QA-51-12

    H H

    -

    H W

    -

    H W

    -

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    VISUAL INSPECTION (GENERAL) ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    DRAWING NO (S).: ACCEPTANCE CRITERIA :

    NO. NON-CONFORMANCE AND REFERENCE REMEDIAL ACCEPTANCE DATE AND INITIAL

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: N/A: Not Applicable FORM:QA-G-02 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO :

    GOODS INWARDS INSPECTION ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR INSPECTOR :

    DESCRIPTION :

    SUPPLIER :

    DRAWING NO.(S) : ACCEPTANCE CRITERIA :

    Q'TY ITEMS RECEIVED : CONTRACT NO. :

    Q'TY ITEMS INSPECTED: SUPPLIERS REF.:

    Q'TY ITEMS ACCEPTED : CERTIFICATION :

    Q'TY ITEMS REJECTED : COLOUR CODE :

    COMMENTS2

    TO BE COMPLETED BY THE CONTRACTOR Q.C.M BELOW THIS LINE

    RECOMMENDATIONS

    SIGNED _ CONTRACTOR Q.C.M

    DISTRIBUTION ORIGINAL FILE CONSTRUCTION MANAGER MATERIAL CONTROLLER PLAAING ENGINEER

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: Q'TY: Quantity N/A: Not Applicable REF.: Reference FORM: QA-G-03 Rev. 01

  • FIELD INSPECTION REPORT FIT-UP CHECK

    ITP NO. :

    REPORT NO.:

    DATE :

    NO. ISO NO. SPOOL JOINT NO. SIZE SCH. HEAT NO.

    PIPE CLASS TYPE S/F SUBCON.

    INSPECTION RESULT REMARKS

    ACC REJ

    PREPARED BY SUBCON. QC INSPECTED BY QC APPROVED BY COMPANY

    LEGEND: S/F: Shop/Field Type: BW(Butt Weld) / FL(Fillet weld) / SW: Socket Weld N/A: Not Applicable FORM:QA-QA-51-01 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    PIPE INTERNAL CLEANING ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    ACTIVITY ISO NO. SPOOL NO. ACC

    BEFORE FABRICATION

    REMOVAL OF MILL SCALER / LACQUER (IF APP.)

    AFTER FABRICATION

    SPOOL FREE FROM DEBRIS, SAND, WELD SLAG, OXIDATION, WATER etc.& DRIED IF NECESSARY

    ALL SPOOL CLOSED WITH PLASTIC SHEETING AND FANGES COVERED WITH PLYWOOD AFTER CLEANING

    STICKER AFFIXED AND SIGNED/PIPE TAG STAPED

    AFTER INSTALLATION

    ALL ERECTED SECTIONS CLOSED AT ALL TIMES- FLANGES SEALED, THREADED CONNS, PLUGED

    LINE FREE FROM DEBRIS etc. AFTER WELDING

    STICKER SIGNED/PIPE TAG STAMPED

    VERIFY ALL SECTIONS COVERED BY MARKED UP

    ISO SHEET DULY SIGNED AND DATED

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-02 Rev. 01

  • FIELD INSPECTION REPORT WELD VISUAL INSPECTION

    ITP NO. :

    REPORT NO.:

    DATE :

    NO. ISO NO. SPOOL JOINT NO. SIZE SCH. MATERIAL

    CLASS TYPE S/F WPS SUBCON. WELDER

    NO.

    INSPECTION RESULT REMARKS

    ACC REJ

    PREPARED BY SUBCON. QC INSPECTED BY QC APPROVED BY COMPANY

    LEGEND: S/F: Shop/Field Type: BW(Butt Weld) / FL(Fillet weld) / SW: Socket Weld N/A: Not Applicable FORM:QA-QA-51-03 Rev. 00

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    RADIOGRAPHIC EXAMINATION ITEM NO. : LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR. COMPANY'S INSPECTOR : / / / / / / CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    PROCEDURE METHOD : TECHNIQUE: SWSI DWSI DWDI PANORAMIC ACCEPTANCE CRITERIA : IQI: SFD: MATERIAL : UG: SENSITIVITY:

    SOURCE : DENSITY:

    FILM TYPE :

    MAKER & TYPE OF MACHINE:

    ISO No. LINE N0. SHEET

    NO. SPOOL

    NO. JOINT NO. SIZE

    THK. WELDER

    ID RT NO. SEG. DEFECT ACC REP C-O R/S R/T

    ABBREVIATIONS PG : PIPING EP : EXCESS PENETRATION S : SLAG INCLUSION IP : INCOMPLETED PENETRATION P : POROSITY LF : LACK OF FUSION C : CRACK ND : NO DEFECT T : TUNGESTEN INCLUSION ACC : ACCEPT C-O : CUT-OUT REP : REPAIR R/S: Re-Shoot R/T: Re-Take

    1- To be signed if Accepted by all parties LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-04 Rev. 02

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    MAGNETIC PARTICLE EXAMINATION ITEM NO. : LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR. COMPANY'S INSPECTOR : / / / / / / CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    PROCEDURE METHOD :

    ACCEPTANCE CRITERIA :

    TYPE OF POWDER : ABBREVIATIONS

    L : LINEAR INDICATIONS ACC : ACCEPT R : ROUNDED INDICATION REP : REPAIR ND :NO DEFFECT C-O : CUT-OUT

    DWG N0. JOINT NO. WELDER NO. RESULT ACC REP C-O

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-05 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    ULTRASONIC EXAMINATION ITEM NO. : LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR. COMPANY'S INSPECTOR : / / / / / / CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    PROCEDURE METHOD :

    ACCEPTANCE CRITERIA :

    MATERIAL : THICKNESS:

    METHOD : PROBE SIZE:

    MEDIUM : FREQUENCY: ANGLE: MAKER & TYPE OF MACHINE:

    DWG N0. JOINT NO. WELDER NO. RESULT ACC REP C-O

    ABBREVIATIONS ACC : ACCEPT EP : EXCESS PENETRATION REP : REPAIR IP : INCOMPLETED PENETRATION C-O : CUT-OUT LF : LACK OF FUSION C : CRACK S : SLAG INCLUSION P : POROSITY ND : NO DEFECT * SEE ATTACHED SHEET (DETAILED ULTRASONIC EXAMINATION RECORD)

    1- To be signed if Accepted by all parties LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-06 1/2 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    DETAILED ULTRASONIC EXAMINATION REPORT

    DWG NO. JOINT NO t DISTANCE W L D d LENGTH OF INDICATION

    COMMENTS2

    2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-06 2/2 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    DYE PENETRATION EXAMINATION ITEM NO. : LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR. COMPANY'S INSPECTOR : / / / / / / CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    PROCEDURE METHOD :

    ACCEPTANCE CRITERIA :

    TYPE OF PENETRANT : ABBREVIATIONS

    L : LINEAR INDICATIONS ACC : ACCEPT R : ROUNDED INDICATION REP : REPAIR ND :NO DEFFECT C-O : CUT-OUT

    DWG N0. JOINT NO. WELDER NO. RESULT ACC REP C-O

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-07 Rev. 01

  • FIELD INSPECTION REPORT RELEASED SPOOL LIST

    ITP NO. :

    REPORT NO.:

    DATE :

    NO. ISO NO. SPOOL SHOP JOINT RELEASED NO. RELEASED

    DATE S/F WPS SUBCON. WELDER INSPECTION

    RESULT REMARKS ACC REJ

    PREPARED BY SUBCON. QC INSPECTED BY QC APPROVED BY COMPANY

    LEGEND: S/F: Shop/Field Type: BW(Butt Weld) / FL(Fillet weld) / SW: Socket Weld N/A: Not Applicable FORM:QA-QA-51-09 Rev. 00

  • FIELD INSPECTION REPORT PUNCH LIST (FOR A/G PRESSURE TEST)

    ITP NO. : Walk Down Date: Issued by: REPORT NO.: Sub-Sys : Page : / DATE : TEST TYPE: Hydro test Pneumatic test Visual test

    NO. DATA NO. DESCRIPTION RESULT PUNCH

    TYPE CATEGORY ACTION

    BY ISSUED DATE

    CLEARED DATE

    COMPANY APPROVED REMARKS ACC REJ

    FLANGE RATING(S) CORRECT

    GASKET INSTALLED

    NUTS AND BOLTS TORQUE TIGHTENED

    VALVES TAG NO(S). CORRECT

    FLOW DIRECTION OF VALVE(S) CORRECT

    VALVE STEM ORIENTATION CORRECT

    VALVE OPERATION

    VENT(S) AND DRAIN(S) CORRECT

    BLINDS INSTALLED CORRECT

    SUPPORT CORRECT TO DRAWING(S)

    ANCHORS FIXED CORRECTLY

    GUIDES INSTALLED CORRECTLY

    SHOES INSTALLED CORRECTLY

    SPRING HANGERS/SUPPORTS INSTALLED

    LINE SPACING CORRECT

    INSTALLED TO DRAWING

    OTHER

    NOTE: Important: Punch description shall be described in detail Type: Support, NDT, PWHT, Valve, FDN Category A: Before Pressure Test Action by: Each Discipline Category B: Before Pre-commissioning Data No.: for DB control only Category C: Before Commissioning SUBCON QC CONTRACTOR QC COMPANY

    LEGEND: ACC: ACCEPT REJ: REJECT N/A: Not Applicable FORM:QA-QA-51-10 Rev. 00

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    FLUSHING REPORT ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    LINE NUMBER FLUSHING TIME

    ACC. REJ. ACC. REJ. ACC. REJ. MEDIA RATE START END

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-11 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    PRESSURE TEST A/G PIPING

    ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    1. FABRICATION AND INSTALLATION

    NO. DESCRIPTION VERIFY BY PIPING REMARKS

    1.1 Piping material

    1.2 In-line items/Valve/Supports

    1.3 Punch clear before pressure test (Cat. A only) 1.4 Documents completed

    NOTE:

    PREPARED BY PIPING INSPECTED BY Q/C APPROVED BY COMPANY

    2. PRESSURE TEST

    2.1 Type of test 2.2 Test Date

    2.3 Design Pressure 2.4 Test Media

    2.5 Test Pressure (requirement) 2.6 Holding Time 2.7 Examined Pressure 2.8 Gauge No. Cal. Date

    2.9 Test Result 1

    2.10 Draining & Drying 2

    COMMENTS2

    PREPARED BY PIPING INSPECTED BY Q/C APPROVED BY COMPANY

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-12 Rev. 01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: MECHANICAL DESCRIPTION OF WORK: PAINTING & COATING

    ITP NO.: SPY-3-0000-CM-PR-081 REV.: 3 PAGE: 4 OF 10

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    1 1.1

    1.2

    2 2.1 2.2 2.3

    3 3.1 3.2 3.3

    MATERIAL RECEIVING INSPECTION Check the material physical condition for damage, corrosion, etc. Review Receiving Inspection Report & Mill Certificate

    SURFACE PREPARATION (BLASTING) Check surface cleanliness Check the Roughness temperature

    -Surface temperature: 3C above dew point and not exceed of 38C -Temperature more than 10C or Relative Humidity less than 85%

    PAINTING Verify the manufacturer painting material Verify the painting system Check the Humidity and Dew point temperature

    602-000-PI-SP-014

    602-000-PI-SP-014

    602-000-PI-SP-014

    QA-G-03

    QA-QA-81-03

    W

    R

    H H H

    H H H

    W

    W

    SW W W

    H H W

    SW

    SW

    SW SW SW

    SW SW SW

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: MECHANICAL DESCRIPTION OF WORK: PAINTING & COATING

    ITP NO.: SPY-3-0000-CM-PR-081 REV.: 3 PAGE: 5 OF 10

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    3.4 3.5 3.6 3.7 3.8 3.9

    4 4.1 4.2 4.3

    5

    -Surface temperature: more than 3C above dew point or not exceed of 38C -Temperature more than 10C or Relative Humidity less than 85%

    Primer coat Application Surface Cleaning Surface Preparation Painting each coat. Check Dry Film Thickness Check the Adherence (for Final Coating only)

    COATING In Process Inspection-Field Joint Preparation In Process Inspection-Field Joint Wrapping Holiday test-Installed Underground Pipework

    Final Visual Inspection Punch list

    602-000-PI-SP-014

    602-000-PI-SP-014 & Vendor Procedure

    NACE RP0188

    QA-QA-81-03

    QA-QA-81-01 QA-QA-81-01 QA-QA-81-01 QA-QA-81-01

    QA-QA-81-04

    QA-QA-81-02

    H H H H H H

    H H H

    H

    W SW W

    SW H H

    SW SW H

    H

    SW SW SW SW W H

    SW SW H

    H

    (For Underground Piping)

    (only for Wrapping)

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO :

    GOODS INWARDS INSPECTION ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR INSPECTOR :

    DESCRIPTION :

    SUPPLIER :

    DRAWING NO.(S) : ACCEPTANCE CRITERIA :

    Q'TY ITEMS RECEIVED : CONTRACT NO. :

    Q'TY ITEMS INSPECTED: SUPPLIERS REF.:

    Q'TY ITEMS ACCEPTED : CERTIFICATION :

    Q'TY ITEMS REJECTED : COLOUR CODE :

    COMMENTS2

    TO BE COMPLETED BY THE CONTRACTOR Q.C.M BELOW THIS LINE

    RECOMMENDATIONS

    SIGNED _ CONTRACTOR Q.C.M

    DISTRIBUTION ORIGINAL FILE CONSTRUCTION MANAGER MATERIAL CONTROLLER PLANING ENGINEER

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: Q'TY: Quantity N/A: Not Applicable REF.: Reference FORM: QA-G-03 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    PAINTING APPLICATION ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    HUMIDITY%: Dew Point Temp: Paint Material/Manufacturer:

    PAINTING: Intermediate Final Touch-up

    ITEM NO. OR LINE NO.

    SURFACE CONDITION

    PAINT SYSTEM

    NO.

    FINAL DRY FILM THICKNESS ADHERENCE TEST

    (for final only) RESULT

    SPECIFIED D.F.T

    MEASURED VALUE

    1 2 3 AVE. ACC REJ ACC REJ

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC: ACCEPT REJ: REJECT N/A: Not Applicable FORM:QA-QA-81-01 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO. :

    FINAL VISUAL INSPECTION PUNCH LIST (PAINTING)

    ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    DRAWING NO (S) : ACCEPTANCE CRITERIA :

    NO. NON-CONFORMANCE AND REFERENCE REMEDIAL ACCEPTANCE DATE AND INITIAL

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: N/A: Not Applicable FORM:QA-QA-81-02 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    BLASTING / PRIMER REPORT ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    1. BLASTING

    Humidity / Dew point temp. / Cleaning condition Accept Reject Roughness Others

    2. PRIMER

    Paint system No. Paint material / Manufacturer

    Humidity / Dew point temp. Surface condition Accept Reject Dry film thickness Others

    3. ITEMS

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: N/A: Not Applicable FORM:QA-QA-81-03 Rev. 01

  • FIELD INSPECTION REPORT

    JOINT COATING LOG

    ITP NO. : SPY-3-0000-CM-PR-081

    REPORT NO. :

    DATE :

    UNIT: ISO / LINE: FROM: TO:

    Joint Reference Relative Humidity (%) Surface Cleaning Roughness

    Dry Film Thickness (Microns)

    Holiday Detection Adhesion Check

    Result Remarks

    ACC REJ

    PREPARED BY SUBCONTRACTOR

    INSPECTED BY CONTRACTOR

    APPROVED BY COMPANY

    LEGEND: N/A: Not Applicable ACC: ACCEPT REJ: REJECT FORM:QA-QA-81-04 Rev. 00

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: MECHANICAL DESCRIPTION OF WORK: INSULATION

    ITP NO.: SPY-3-0000-CM-PR-082 REV.: 4 PAGE: 4 OF 8

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    1 1.1 1.2 1.3

    2 2.1 2.2

    3 3.1 3.2 3.3 3.4

    4 4.1 4.2 4.3 4.4

    Material Verification Verify the material/size/quantity Check the damage Review the Certificate Material Test Report

    Surface Preparation Check surface cleanliness Repairs(To apply touch-up paint, If required)

    Insulation Work Check Support Ring & Clip Check Insulation & Thickness Check Banding Check Vapor Barrier Mastic

    Jacketing Work Check Jacketing Check Straps & Screwing Works Check Water or Weatherproofing Check Expansion Joint(If required)

    602-000-PI-SP-015 & 016

    602-000-PI-SP-015 & 016

    602-000-PI-SP-015 & 016

    602-000-PI-SP-015 & 016

    QA-G-03

    QA-QA-81-01

    QA-QA-82-01

    QA-QA-82-01

    H H H

    H H

    H H H H

    H H H H

    W W H

    W W

    W W

    SW W

    SW SW W

    SW

    W W R

    SW SW

    SW SW SW SW

    SW SW SW SW

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • INSPECTION & TEST PROGRAM FOR SITE DISCIPLINE: MECHANICAL DESCRIPTION OF WORK: INSULATION

    ITP NO.: SPY-3-0000-CM-PR-082 REV.: 4 PAGE: 5 OF 8

    NO. DESCRIPTION OF INSPECTION/TEST APPLICABLE SPEC.

    OR PROCEDURE REPORTING

    FORMAT

    PARTICIPATION BY REMARK

    SUBCON. OTC/TPA COMPANY

    5 5.1

    Final Inspection Visual Inspection

    602-000-PI-SP-015 & 016

    QA-QA-82-02

    H

    H

    H

    LEGEND: R: Review SW: Spot Witness W: Witness H: Hold

    FORM NO.: QA-PR-001-03 REV.:01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO :

    GOODS INWARDS INSPECTION ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR INSPECTOR :

    DESCRIPTION :

    SUPPLIER :

    DRAWING NO.(S) : ACCEPTANCE CRITERIA :

    Q'TY ITEMS RECEIVED : CONTRACT NO. :

    Q'TY ITEMS INSPECTED: SUPPLIERS REF.:

    Q'TY ITEMS ACCEPTED : CERTIFICATION :

    Q'TY ITEMS REJECTED : COLOUR CODE :

    COMMENTS:2

    TO BE COMPLETED BY THE CONTRACTOR Q.C.M BELOW THIS LINE

    RECOMMENDATIONS

    SIGNED _ CONTRACTOR Q.C.M

    DISTRIBUTION ORIGINAL FILE CONSTRUCTION MANAGER MATERIAL CONTROLLER PLANING ENGINEER

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: Q'TY: Quantity N/A: Not Applicable REF.: Reference FORM: QA-G-03 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO :

    INSULATION INSTALLATION ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR INSPECTOR :

    DWG. NO.: Description:

    NO. DESCRIPTION RESULT

    REMARK

    ACEEPT REJECT N/A

    1 Material Verification

    2 Surface Preparation

    1) Cleaning 2) Touch-up Paint(If required)

    3

    Insulation Work 1) Support Ring & Pin 2) Banding 3) Insulation & Thickness Check 4) Vapour Barrier Mastic

    4

    Jacketing / Final Inspection 1) Jacketing 2) Scrap & Screw Works 3) Sealing / Water Proofing 4) Expansion Joint

    5 Final Inspection Visual Inspection

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: N/A: Not Applicable FORM: QA-QA-82-01 Rev. 01

  • FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO. :

    FINAL VISUAL INSPECTION PUNCH LIST (INSULATION)

    ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    DRAWING NO (S) : ACCEPTANCE CRITERIA :

    NO. NON-CONFORMANCE AND REFERENCE REMEDIAL ACCEPTANCE DATE AND INITIAL

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: N/A: Not Applicable FORM:QA-QA-82-02 Rev. 01

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 17 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    Description

    Storage Location

    Remarks Open Storage WARE HOUSE

    Air Conditioned

    Room Yard Weathering Protection

    b Electric process heaters and furnaces O

    c Large automatic control valves O

    d Large pressure relief and safety valves O

    e Cable on Drum / Conduit O

    f Electric Wire O

    g Lighting Fixtures O

    h Distribution Panels and Control Panels O

    i Transformer *O O *Designated for outdoor installation

    j Motors *O O *Designated for outdoor installation

    k Instruments O *O *Based on Vendor's instruction. l Meters O

    m Materials for Electrical & instrument work O

    3 ROATING EQUIPMENT (Pumps, motors & etc.)

    a Pump O Vendor's Preservation Procedure shall be followed.

    b Compressors Large Processing machinery O

    4 STATIC EQUIPMENT a Stainless Steel equipment O

    b Vessels, Drums and Heat Exchanger, Stacks and Others O

    c Small items and accessories O

    5 OIL AND GASSES

    a Gasoline, Thinner O

    b Paint, Oil O

    c Gases O

    d Chemicals O Stored Separately in Warehouse. 6 CATALYST & PACKING

    a Catalyst O *O *If requested by VENDORS manual b Packing Materials O

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 18 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    Description

    Storage Location

    Remarks Open Storage WARE HOUSE

    Air Conditioned

    Room Yard Weathering Protection

    7 Insulation and Fire Proofing

    a Heat Insulation Materials O

    *O

    *After unpacking (Based on Vendor's recommendation)

    b Fire Proofing Materials O

    *O

    *Powder Type Mat'ls. (Based on Vendor's recommendation)

    8 PRECIOUS METAL O Special Secured Store

    9 SPARE PARTS O

    Stored separately to all other MATERIALS Area clearly marked "SPARE PARTS/EQUIP NO.''

    5.3. Storing in Open Storage Area All MATERIALS stored in the OPEN STORAGE AREA shall be on pallets or sleepers, and shall be tagged or marked for easy identification. The detailed methods of storing in the OPEN STRORAGE AREA are described for respective categories of MATERIALS in ATTACHMENT 3:''Method for Storing" hereto.

    5.4 Storing in Warehouse All MATERIALS stored in the WAREHOUSE shall be landed on pallets, on shelves, on racks, or in bins, and shall be tagged or marked for easy identification. Pallets, racks, shelves, and bins must be designed to carry the MATERIALS envisaged, in respect of size, weight and quantity.

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 37 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    Reference No.: 5GCS PROJECT

    CARGO DELIVERY REPORT

    IGAT V Booster Gas Compressor Stations Contract No.: 180502

    Date:

    Page No.: of Latest Version Of MR: L/C No. :

    Site Name:

    Remarks Storage Location B/L No. Truck No. Receiving Date Weight (Kg) Description Package List No.

    No.

    MC Representative (observation only):

    Checked and Controlled by

    OTC-C:

    Subcontractor:

    OTC C Material

    Controller:

    OTC EP Material Controller:

    Distribution: Original to OTC EP, Copy to OTC-C, Copy to MC

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 38 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    Reference No.: 5GCS PROJECT

    UNPACKING INSPECTION REPORT

    IGAT V Booster Gas Compressor Stations Contract No.: 180502 Date:

    I.D/TAG No.: Description of Goods: Dates Goods inspected: Dates Goods received::

    Item No. : Package No.: Requisition No.: Vendor / Supplier:

    Visual Inspections(describe in detail any visual signs of damage) Packing condition:

    NOT GOOD GOOD

    Note:

    Condition of Contents:

    NOT GOOD GOOD

    Note:

    Quantities SHORTAGE OVERAGE CORRECT

    OVERAGE/ SHORTAGE details

    OVERAGE/ SHORTAGE / Damage Report required? Yes No

    OTC- C Subcontractor : OTC- C Material Controller: OTC-EP Material Controller:

    Distribution: Original to OTC EP , Coy to OTC-C and OTC C Subcontractor

  • OTC IGAT V Booster Gas Compressor Stations

    Document Title Site Materials

    Control Procedure PHASE

    SPY

    IGAT V Booster Gas Compressor Stations Contract No.:180502 OVERAGE/SHORTAGE/DAMAGE REPORT

    Site Name: CDR No.&Date:

    Vendor/Supplier: Requisition No.:Copy of Unpacking Inspection Report Attached? Yes No

    Photographs Attached? Yes No

    No. Description Item No. Unit Q'ty Packing list

    Recommended Action: A. Repair in Field B. Return to Vendor for Repair

    Reason:

    Claim against : Contractor Vendor

    OTC-EP Material Controller: OTC-

    Distribution: Original to OTC-EP Copy to OTC-C and OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document No. Page AREA TRAIN/UNIT DIS DOC SEQ REV

    3 0000 CM PR 203 03

    5GCS PROJECT Reference No.:

    OVERAGE/SHORTAGE/DAMAGE REPORT Date:

    CDR No.&Date: UIR No.& Date:

    Requisition No.: Package No.:Copy of Unpacking Inspection Report Attached? Yes No

    Attached? Yes No

    Q'ty Packing list

    Q'ty Received Overage Shortage Damage

    Recommended

    Return to Vendor for Repair C. Replace D. Advise Vendor/Supplier of Overage/Shortage

    Other

    -C Material Controller: Subcontractor:

    OTC-C Subcontractor

    Page 39 of 73

    Reference No.:

    Date:

    Package No.:

    Recommended Action Remark

    Advise Vendor/Supplier of Overage/Shortage E. None

  • OTC IGAT V Booster Gas Compressor Stations

    Document Title Site Materials

    Control Procedure PHASE

    SPY

    IGAT V Booster Gas Compressor Stations Contract No.:180502

    Site Name:

    OSD No.&Date:

    Vendor/Supplier:

    Copy of Unpacking Inspection Report Attached? Yes No

    Photographs Attached? Yes No

    No. Description Item No.

    OTC-EP Material Controller:

    Distribution: Original to OTC-EP Copy to OTC-C and OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document No. Page AREA TRAIN/UNIT DIS DOC SEQ REV

    3 0000 CM PR 203 03

    5GCS PROJECT

    SHORTAGE/DAMAGE COMPENSATION

    UIR No. & Date:

    Copy of Unpacking Inspection Report Attached? Yes No

    Attached? Yes No

    Item No. Unit Q'ty

    Packing list

    Q'ty Received Shortage Compensation

    OTC-C Material Controller: Subcontractor:

    C and OTC-C Subcontractor

    Page 40 of 73

    Reference No.:

    SHORTAGE/DAMAGE COMPENSATION Date:

    CDR No.& Date:

    Package No.:

    Compensation Remark

    Subcontractor:

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 41 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    OSD/RUP SUMMARY REPORT PREPARED BY OTC-EP (MR-005) OSD NO. RUP NO. ISSUE

    DATE

    DESCRIPTION UNIT

    NO.

    REMARKS STATUS

    CC:OTC-MC PREPARED BY:OTC-EP MC SIGNE:

    THE COLUMN OF RUP NO.SHALL BE KEPT BLANK IF RUP IS ISSUED WITHOUT OSD, THE COLUMN OF OSD NO.SHALL BE KEPT BLANK.

    IF RUP is issued without OSD The column of OSD NO. Shall be kept blank

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 42 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    RUP STATUS REPORTS (MR-006)

    RUP NO. ISSUE DATE WORK CATEGORY UNIT NO ITEM NO E.T.A ACTUAL DATE ISSUED

    (Y/N) REMARKS

    PREPARED BY OTC-EP (MC) CC: TO OTC-C (MC)

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 43 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    STOCK BOOK (MR-007) WORK NO----------------

    REQ NO PACKAGE NO UNIT

    NO ITEM

    NO TAGE

    NO DESCRIPTION

    SIZE

    PLACE OF

    STOCK

    RECEIVED ISSIUED BLANCE QTY

    REMA

    RKS DATE QTY DATE QTY

    TO BE USED BY OTC-C SUBCONTRACTOR

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 45 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    National Iranian Gas Company South Pars Gas Field Development Phases6,7&8 IGAT V Booster Gas Compressor Stations Contract No.:180502

    5GCS PROJECT Material Issue Voucher

    Reference No.:

    Date:

    No. Tag No. Description Unit Quantity DWG/ISO

    No. Sheet No. Remark Requested Issued

    Requested by Subcontractor Confirmed by Subcontractor Technical Office

    Approved by OTC-C Discipline Supervisor

    Approved by OTC-C Material Controller

    Received by

    Distribution: Original to Warehouse, Copy to OTC-C Material Controller and OTC-C Subcontractor

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 46 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    National Iranian Gas Company South Pars Gas Field Development Phases6,7&8 IGAT V Booster Gas Compressor Stations Contract No.:180502

    5GCS PROJECT Material Return Voucher

    Reference No.:

    Date:

    No. Tag No. Description Unit Quantity MIV

    No. DWG/ISO

    No. Remark Issued Returned Balance

    Requested by Subcontractor Confirmed by Subcontractor Technical Office

    Approved by OTC-C Discipline Supervisor

    Approved by OTC-C Material Controller

    Received by

    Distribution: Original to Warehouse, Copy to OTC-C Material Controller and OTC-C Subcontractor

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 47 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    IGAT V Booster Gas Compressor Contract No. : 180502

    5GCS PROJECT MATERIAL TRANSFER VOUCHER

    M.T.V No:

    Date:

    S-CDR No: S-CRR No: S-CRR Date: MR No.: Letter Req. No. :

    Sender (Site): Receiver (Site): Vendor: Page Of No. Package No. Description Weight (Kg) Unit QTY Req. QTY Rev. Remark

    Sender Receiver OTC-C (Material Controller):

    OTC-EP (Material Controller):

    Subcontractor: MC Representative (Observation Only)

    OTC-C (Material Controller):

    OTC-EP (Material Controller):

    Subcontractor: MC Representative (Observation Only)

    Distribution: Original to OTC-EP, copy to OTCC, copy to MC

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 48 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    MONTHLY REPORT FOR STORING TO BE USED BY OTC-C SUBCONTRACTOR (MR-011)

    WORK NO. ------------------

    ISSUED DATE: ----------- 1. RECIVING WORKS

    CONTENTS OF WORK EQUIPMENT PIPING INST ELEC OTHER TOTAL REMARKS NO.OF PACKAGES

    NET WEIGHT(TON) MEASUREMENT(M3) MANHOURS

    2. UNPACKING INSPECTION&STORING WORKS NO OF PACKAGE

    TYPE OF PACKAGE

    1)CASE 2)CRATE 3)SKID 4)BUNDEL 5)SHRINK 6)DRUM 7)BARE NET WEIGHT(TON) MEASUREMENT(M3) MANHOURS(M/H)

    SIGNATURE

    WAREHOUSE SUPERVISOR

    CC: OTC-C (MC)

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 49 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    SPA

    RE

    PAR

    TS C

    ON

    TRO

    L SH

    EET

    TO BE

    U

    SED

    BY

    O

    TC-EP

    STA

    TI

    ON

    INV

    : In

    voic

    e

    STK

    : St

    ock

    ISS

    SLIP

    NO

    .

    STK

    BOX

    LOC

    ATI

    ON

    CASE

    INV

    MRR

    BAL

    RC

    VD

    QTY

    PO

    QTY

    PAR

    T

    N

    O.

    SIZE

    DES

    CR

    IPTI

    ON

    BA

    L: B

    alan

    ce

    MR

    R:

    Mat

    eria

    l Rec

    eivin

    g R

    eport

    ITEM

    TAG

    #

    PUR

    CH

    ASE

    OR

    DE

    NO .

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 50 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    BIN CARD-MC-013 SITE NAME UNIT NO PKG NO. WORK NO

    TAG NO STORE LOCATION

    DESCRIPTION

    LEDGER

    DATE QUTY REC QUATY ISSUED

    BALANCE

    REMARKS: TO BE USED BY OTC-C SUBCONTRACTOR

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 51 of 73 Site Materials

    Control Procedure PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 203 03

    MATERIAL PRORESS REPORT IGATV BGCS

    STATION NO.

    ITEM TAG NO DESCRIPTION ETA AT

    SITE

    SIZE VOL WEIGHT

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 18 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    Form No.: CM-PR-219-01

    HYDROSTATIC OR PNEUMATIC LEAK TEST RECORD LOG 1. SERIAL

    NO. 2. TEST

    NO. 3. DESCRIPTION 4. TEST

    PRESSURE 5. EXAMINATION

    PRESSURE 6. TEST START

    7.TEST COMPLETED

    8.T/O DATE 9. REMARK

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 19 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    FIELD INSPECTION REPORT PUNCH LIST (FOR A/G PRESSURE TEST)

    ITP NO. : Walk Down Date: Issued by: REPORT NO.: Sub-Sys : Page : / DATE : TEST TYPE: Hydro test Pneumatic test Visual test NO. DATA NO. DESCRIPTION

    RESULT PUNCH TYPE CATEGORY

    ACTION BY

    ISSUED DATE

    CLEARED DATE

    COMPANY APPROVED REMARKS ACC REJ

    FLANGE RATING(S) CORRECT GASKET INSTALLED NUTS AND BOLTS TORQUE TIGHTENED VALVES TAG NO(S). CORRECT FLOW DIRECTION OF VALVE(S) CORRECT VALVE STEM ORIENTATION CORRECT VALVE OPERATION VENT(S) AND DRAIN(S) CORRECT BLINDS INSTALLED CORRECT SUPPORT CORRECT TO DRAWING(S) ANCHORS FIXED CORRECTLY GUIDES INSTALLED CORRECTLY SHOES INSTALLED CORRECTLY SPRING HANGERS/SUPPORTS INSTALLED LINE SPACING CORRECT INSTALLED TO DRAWING OTHER

    NOTE: Important: Punch description shall be described in detail Type: Support, NDT, PWHT, Valve, FDN Category A: Before Pressure Test Action by: Each Discipline Category B: Before Pre-commissioning Data No.: for DB control only Category C: Before Commissioning SUBCON QC CONTRACTOR QC COMPANY

    LEGEND: ACC: ACCEPT REJ: REJECT N/A: Not Applicable FORM:QA-QA-51-10 Rev. 00

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 20 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    TEST PACKAGE SUMMERY

    Test Package

    No. Flu

    id

    Serv

    ice

    Line No. Train Sheet Joint

    No. Size Sch Thk.

    Mat. 1

    of Joint

    Mat. 2

    of Joint

    PWHT

    Rep.

    NDT Before PWHT NDT After PWHT

    RT UT MT PT RT UT MT PT

    PREPARED BY

    (SUB-CON.) APPROVEDBY

    (OTCC) APPROVED BY

    (COMPANY)

    LEGEND: ACC: ACCEPT REJ: REJECT N/A: Not Applicable FORM No.: CM-PR-219-09

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 21 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    INITIAL SERVICE LEAK TEST REQUEST SERIAL NO. SUB-SCOPE FLOW SHEET TEST PACKAGE NO. REMARK

    PREPARED BY:

    DATE

    FIELD ENGINEER DATE

    PACKAGE NO. LINE NO. OPERATING PRESSURE

    DATE TO TEST

    REMARKS

    APPROVED BY COMPANY / START UP ENGINEER

    SIGN DATE

    FORM NO.: CM-PR-219-02

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 22 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    DANGER HYDROSTATIC PRESSURE

    TEST IN PROGRESS DO NOT OPERATE

    COLOUR: RED

    DANGER HYDROSTATIC PRESSURE

    TEST IN PROGRESS DO NOT OPERATE

    SYSTEM:

    SYSTEM:

    COMPONENT ID:

    COMPONENT ID:

    CON/POSITION:

    CON/POSITION:

    DATE:

    DATE:

    TEST ENGINEER:

    TEST ENGINEER:

    TEST NO.:

    TEST NO.:

    FORM NO.: CM-PR-219-03

    FORM NO.: CM-PR-219-03

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 27 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    PIPING REINSTATEMENT CHECK LIST

    PIPEWORK

    Acce

    pt

    Rejec

    t

    Date

    REMARK SUB-TEST PACKAGE NO. :

    SUB-SYSTEM NO. :

    ITEM CHECK LIST

    1 Check pipe cleanliness.(As required)

    2 Verify piping anchor locations are as per project specifications.(Punch List)

    3 Check that pipe supports and clamps comply with project specifications.(Punch List)

    4 Check that pipe guides are correctly aligned.(Punch List)

    5 Verify that pipe check valves operate freely before installation.

    6 Check valves for correct direction, lubrication, spindle, packing and free operation.

    7 Check the pipe flanges are mounted square to each other with correct bolting and gaskets.

    8 Update construction punch list.

    REMARKS: PUNCH LIST ITEMS

    Name Date Signature

    Carried out by

    Acce

    pte

    d by

    Contractor

    Company

    Commissioning

    Certifying Authority

    FORM NO. CM-PR-219-07

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 28 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    FIELD INSPECTION REPORT ITP NO. :

    REPORT NO. :

    DATE :

    INSPECTION TYPE: WORK NO.:

    FLUSHING REPORT ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    LINE NUMBER FLUSHING TIME

    ACC. REJ. ACC. REJ. ACC. REJ. MEDIA RATE START END

    COMMENTS2

    1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-11 Rev. 01

  • OTC

    National Iranian Gas Company

    IGAT V Booster Gas Compressor Stations

    Document Title Document No. Page 29 of 29 Work Procedure for

    Pressure Test PHASE AREA TRAIN/UNIT DIS DOC SEQ REV

    SPY 3 0000 CM PR 219 02

    FIELD INSPECTION REPORT ITP NO. : REPORT NO. : DATE :

    INSPECTION TYPE: WORK NO.:

    PRESSURE TEST A/G PIPING

    ITEM NO. :

    LOCATION :

    SIGNATURE1

    INSPECTION NOTICE NO. : COMPANY CONTRACTOR SUBCONTR.

    COMPANY'S INSPECTOR : / / / / / /

    CONTRACTOR INSPECTOR :

    SUBCONTRACTOR'S INSPECTOR :

    1. FABRICATION AND INSTALLATION

    NO. DESCRIPTION VERIFY BY PIPING REMARKS

    1.1 Piping material

    1.2 In-line items/Valve/Supports

    1.3 Punch clear before pressure test (Cat. A only) 1.4 Documents completed

    NOTE:

    PREPARED BY PIPING INSPECTED BY Q/C APPROVED BY COMPANY

    2. PRESSURE TEST

    2.1 Type of test 2.2 Test Date

    2.3 Design Pressure 2.4 Test Media

    2.5 Test Pressure (requirement) 2.6 Holding Time 2.7 Examined Pressure 2.8 Gauge No. Cal. Date

    2.9 Test Result 1

    2.10 Draining & Drying 2

    COMMENTS2

    PREPARED BY PIPING INSPECTED BY Q/C APPROVED BY COMPANY 1- To be signed if Accepted by all parties 2- Reason of Rejection and to be Signed by Refuser LEGEND: ACC.: ACCEPT REJ.: REJECT N/A: Not Applicable FORM:QA-QA-51-12 Rev. 01