0002_apeldoorn
-
Upload
syed-wajahat-ali -
Category
Documents
-
view
215 -
download
0
Transcript of 0002_apeldoorn
-
8/3/2019 0002_apeldoorn
1/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
REQUIREMENTS AND SOLUTIONS FORDYNAMIC VOLTAGE RESTORER
A CASE STUDY
REQUIREMENTS AND SOLUTIONS FORDYNAMIC VOLTAGE RESTORER
A CASE STUDY
P. Dhler, R. Affolter, O. ApeldoornABB Industrie AG
5300 Turgi, Switzerland
-
8/3/2019 0002_apeldoorn
2/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
CONTENTSCONTENTS INTRODUCTION
MARKET REQUIRMENTS OF THE DVR
OPERATING PRINCIPLE OF A DVR
SAG COMPENSATION CAPABILITY
RELIABILITY AND AVAILABILITY
LOSSES
CONTROL AND PROTECTION
HARMONICS
MONITORING CONCLUSION
-
8/3/2019 0002_apeldoorn
3/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
IntroductionIntroduction
Turgi
www.abb.com/powerelectronics
ABB Industrie AG, SwitzerlandPower Electronics Systems
-
8/3/2019 0002_apeldoorn
4/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Market requirementsMarket requirements
Sag & Swell compensation capability Reliability and Availability Losses Control and Protection Harmonics Monitoring
Market requirements determine:
-
8/3/2019 0002_apeldoorn
5/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Operating PrincipleOperating PrincipleBooster Transformer
Converter
EnergyStorage
Distrib.Bus Load
-
8/3/2019 0002_apeldoorn
6/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Operating PrincipleOperating Principle
V B V L
xm
xt2
C o n v e r t e r
V G = 0
xt2
I L
Standby Boost
shorted CT !
I L
xm
xt2
C o n v e r t e r
|V G | > 0
xt2
V B
V L
-
8/3/2019 0002_apeldoorn
7/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
TopologyTopology
DistributionBus
LoadBus
Filter
Charger
Q1 Q2
Q3
T 1 TL
Control
V G
V L
DVR
I B
= I G
-
8/3/2019 0002_apeldoorn
8/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
TopologyTopology
-+ 0
Short circuit operation (SCO-Mode)
No switching duringSCO - Mode
No switching losses
No harmonics
-
8/3/2019 0002_apeldoorn
9/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
TopologyTopology
-
8/3/2019 0002_apeldoorn
10/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Compensation RequirementsCompensation Requirements
ms100 200 300 400 5000
0.25
0.35
0.45
0.55
0.65
Voltage sag [%]
-
8/3/2019 0002_apeldoorn
11/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
0.65
0.35
0.7
00 100 200 300 400
Compensation CapabilityCompensation Capability
ABB
othersmax. three phase
sag capability0.35
0.45
0.55
0.65
Voltage sag [%]
ms100 200 300 4000
0.3
-
8/3/2019 0002_apeldoorn
12/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Reliability AvailabilityReliability Availability
An Availability of > 98,5% can be achieved
This is reached by4 Simple Design4 Low number of Parts4 Implementation of the robust IGCT4 Overcurrent capability
-
8/3/2019 0002_apeldoorn
13/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Reliability AvailabilityReliability Availability
4 MVA load In operation
since 1.5 years no IGCT
failure(~200FIT)
thyristortechnology isat 100 FIT
-
8/3/2019 0002_apeldoorn
14/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
LossesLosses
Definition at SCO-Mode (Standby) Transformer losses (measured) Converter (calculated)
Energy storage (calculated) Auxiliaries (measured)
Goal = 98,5%
-
8/3/2019 0002_apeldoorn
15/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
LossesLosses
Feature IGBT GTO IGCT
device turn-off loss 100 % 100 % 100 %device turn-on loss 100 % 30 % 5 %
gate drive power 1 % 100 % 50 %short-circuit current self limited (= f(t)) external (choke) external (choke)dv/dt snubber no yes nodi/dt snubber no yes yes
chip mount solder pressure pressure
switch chip discrete monolithic monolithicdiode chip discrete monolithic monolithic
device on-state loss 100 % 70 % 50 %
-
8/3/2019 0002_apeldoorn
16/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Control and ProtectionControl and Protection a ,b Transformation, eliminate zero sequence
Parks Transformation
Low pass filter
DC Voltage compensation, state of charge
Reproduce phasors
Create 3-phase signals
Generate boost voltage
A,B,C
d,q
a,b
a,b
PLL
freeze
VDC
Vbus
Vin
e j t w
Fault
Trigger
Pulse Logic
dq in
dq filtdq out
A,B,C
d,q
a,b
a,b
e j t w
Pulse Width Modulator PWM
Voltage recovery< 1 ms to 100%
-
8/3/2019 0002_apeldoorn
17/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
HarmonicsHarmonics
DistributionBus
LoadBus
Filter
Charger
Q1 Q2
Q 3
T1TL
Control
V G
V L
DVR
I B
= I G
-
8/3/2019 0002_apeldoorn
18/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
HarmonicsHarmonics
Spectrum of DVR Output Voltage
Order n of harmonics
UGN [%]
160 2008000
0,51
0
0,2
0,4
0,6
Ust
40 120
No harmonics duringSCO - Mode
-
8/3/2019 0002_apeldoorn
19/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
MonitoringMonitoring
automatic dataacquisition andlogging
remote online access
remote data transfer PC-based interface
RS232 or RS485
remote diagnosticsand softwarechanges
-
8/3/2019 0002_apeldoorn
20/20
IEEE PES 2000
ABB AutomationABB Industrie AG, Schweiz
Design ParametersDesign Parameters
Load & Power Factor which has to be protected Voltage to be connected Maximum single phase sag [%] or Maximum three phase sag [%] Length of Sag [ms] to protect Area to be protected Recovery time for DC Link Voltage to 100% Overcurrent capability without going in bypass