000004349

download 000004349

of 1

Transcript of 000004349

  • 7/25/2019 000004349

    1/1

    0StLoc.

    3Yrs

    Annual

    Cons.

    Average

    Annual

    Cons.

    Reorder PointMaximum

    LevelSoH

    Material # 000004349 Plant 0611

    Material Description FUSE,1A,250V,AGC1,GOULD

    Unit Price

    Planned Delivery Lead

    Time

    GR Processing

    Lead Time

    5 3

    Annual demand 0

    Service Level 90% Service Level 90% Per Order cost Fixed Cost

    SL Factor 1.28 Risk of a StockOut 10% Holding Cost /Unit/Year 25 % of the Unit Price

    Economic Order Quantity

    EOQ = Economic order quantity

    Co = Cost of procurement

    S = Annual usage

    Cm = Annual carrying costs

    U = Cost of the item. DDL = Demand during Lead Time or working stock.

    S = Annual usage of the item (demand)

    LT = Lead time i n days.

    SS = Safety stock. SKF Remarks SD= Standard deviation of monthly demand.

    SL= Standard deviation of Lead-time.

    SLFactor = The normal distribution value which yields the desired service level factor

    Spare Part Inventory Analysis Report

    00 0 0

    Demand During Lead Time Reorder Point (RoP) Economic Order Qty (EoQ)

    Material Consumption for Past 5 Years or 60 Months

    Safety Stock (SS)

    Lead Time in Days

    0.28CAD

    Stock On Hand

    0

    CAD - CAD - CAD -

    IOC

    EXISTING MIN

    IOC

    EXISTING MAX

    0 0

    Recommended MIN_MAX

    Lead Time Ranking

    Unit Cost Ranking

    S

    N

    L

    NO STOCK SUGGESTED,

    EXISTING MIN-MAX RETAINED

    CAD - CAD -

    Movement Type

    Ranking

    SKF MIN SKF MAX

    0 0

    0.1% 0.6% 2.3% 6.7% 15.9% 30.9% 50.0% 69.1% 84.1% 93.3% 97.7% 99.4% 99.9%

    Percentile

    Normal Distribution- Curve

    Service Level

    90%

    Risk of aStockOut 10%

    $0.0

    0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    1

    0 50 100 150 200 250 300 350

    Cost($)

    Order Quantity

    EOQ ModelEOQTotal Holding CostTotal Ordering CostTotal Cost

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    1

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    2 015 -1 2 2 01 5-0 9 2 01 5-06 20 15 -0 3 2 014 -1 2 2 01 4-09 20 14 -06 20 14 -0 3 2 01 3-1 2 2 01 3-09 20 13 -06 20 13 -0 3 2 01 2-1 2 2 01 2-09 20 12 -06 2 012 -0 3 2 01 1-1 2 2 01 1-09 20 11 -0 6 2 011 -0 3

    000004349

    68%

    95%