Cementing
It is the process by which cement slurry isplaced in the annulus ,bonding the casing tothe formation.
Conventionally the cement is pumped down thecasing and displaced around the shoe into theannulus.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
3
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing
4
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Functions of Cements
Primary functions are : Provide support to the casings Zonal isolation-prevent fluid movement between
zones Casing protection against corrosive fluids Support wellbore Protect water zones
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
5
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cement Job Planning
Each cement job must be carefully planned toensure correct additives are being used andsuitable placement technique is being employedfor that application.
The cement engineer must ensure that Cement can be placed correctly using the
available equipment Cement achieves adequate compressive strength Cement will isolate zones and support casing
throughout the life of well.
6
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Classification of Cement
Several classes have beenapproved by API
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
7
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Classification of Cement
Class A Intended to use from surface to 6000ft (1,830m) When no special properties are required. Similar to ASTM (American Society of Testing
materials) Type I Cheaper than other classes of cements
Class B Intended to use from surface to 6000ft (1,830m) Moderate to High sulphate resistance Similar to ASTM Type II Has lower C3A content than class A
8
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Classification of Cement
Class C Intended to use from surface to 6000ft (1,830m) When conditions require early strength Available in all 3 degrees of sulphate resistance
and similar to ASTM Type III.
Class D Intended to use from surface to 6000ft (1,830m)
to 10,000ft (3050m). Moderate and High sulphate resistance types
available Under moderately high temperatures and
pressures conditions.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
9
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Classification of Cement
Class E Intended to use from 10,000ft (3050m) to
14,000ft (4720m) Under conditions of High temperature and
pressure. Available in MSR and HSR types
Class F Intended to use from surface to 10,000ft
(1,830m) to 16,000ft (4880m). Moderate and High sulphate resistance types
available Extremely 09High temperatures and pressures
conditions.
10
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Classification of Cement
Class G and H Intended to use from surface to 8,000ft (2440m) Can be used with accelerators and retarders to
cover a wide range of well depths andtemperatures
Class G Available in MSR and HSR Types, whileClass H is available in MSR Types only.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
11
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Properties of Cement
Compressive strength To support the casing
string a compressivestrength of 500 psi isgenerally adequate
WOC ( Waiting onCement)-The timerequired for the cement toattain strength and settlebehind the casing.
The casing shoe should notbe drilled out untilstrength is attained.
Compressive strengthdepends upon
TemperaturePressureAmount of water mixElapsed time
12
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Properties of Cement
Thickening Time (Pump ability) Time required for cement slurry to be pumped
and displaced in the annulus. Slurry should have enough thickening time to
allow mixing ,pumping and displacement beforehardening.
Generally 2-3 hours thickening time whichincludes safety factor to allow for delays andinterruptions in operations.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
13
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Properties of Cement Water Loss
If water is lost before cement reaches its intendedposition???
Amount of water loss depends upon the type of cementjob
Squeeze cement jobs require low water loss since thecement must be squeezed before filter cake builds upPrimary cementing is not so critical
Corrosion resistance Formation water may contain Na and Mg sulphates which
react with lime to form calcium sulphoaluminate. These crystals expand and cause cement to crack. Lowering C3A content increases sulphate resistance types
Slurry Density Vary between 11 to 18.5 ppg ,depending upon the type of
formation Density is varied for a low to high strength formation.
14
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Additives
Most slurries containadditives to modify theproperties of the slurry toproduce a better cementjob. Cement additives can be
used to Vary slurry density Change compressive
strength Accelerate and retard
setting time Control filtration and
fluid loss Slurry viscosity Additives may be granular
or liquid form, added withthe cement or mixed withwater.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
15
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Additives Accelerators
Chemicals that reduce thickening time of slurry andincrease early strength
Used in conductors and surface casings to reduce WOC Common types of accelerators are :
Calcium chloride (CaCl2 )1.5-2%Sodium Chloride (NaCl) 2-2.5%Sea water
Retarders extends thickening time of cement slurry to aid proper
placement before hardening. Used in HT wells with Intermediate and production casings
and squeeze cement jobs Avoids cement setting prematurely Common types are:
Calcium lignosulphonate 1-1.5%Saturated Salt solutionsCellulose derivativesHydroxycarboxylic acids
16
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Additives Weighting Agents( Heavy
additives) Increases slurry density. Used when cementing over
pressurized zones Types are:
BariteHematite
Extenders (Light weight) Materials that lower slurry
density and increase yieldto allow weak formations tobe cemented withoutfracturing.
Allows more mix water tobe added
Types are:BentonitePozzolanDiatomaceous earthgilsonite
Source: Drilling DataHandbook, Editions Technip
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
17
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Additives Mud Contaminants
To Improve slurry properties additives such as Diesel Oil,thinners etc are added.
Prevents undesirable side effects caused by mud on cementsetc.
Dispersants (Friction Reducing Additives) Negatively charged polymer molecules that attach themselves
to positively charges in cement grains. Improves flow properties of slurry Lowers the viscosity so that turbulence will occur at lower
circulating pressure. Types are
Polymers 0.3-0.5 lb / sx of cementSaltCalcium lignosulphonate 0.5-1.5 lb / sx
Fluid Loss Additives Excessive fluid loss can cause ineffective cement setting Prevents slurry dehydration ,premature setting or reduces fluid
loss to formations Types are:
Organic polymers 0.5 -1.5 %CMHEC (Carboxy Methyl Hydroxy Ethyl Cellulose) 0.3 -
18
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing HardwareGuide Shoe
Used to guide the casingthrough the hole with itsrounded nose.
Avoiding jamming casingin washed out zones ordeviated wells
Float Shoe Prevents the back flow into
the casing once cement isdisplaced behind casing.
Built in check valve that isflapper or ball type.
Float shoe takes extra time torun casing in hole
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
19
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Hardware
Float Collars The purpose of these landing collars is to
serve as a seat for cement plugs. Run normally 2 or 3 joints above the shoe,
known as shoe track.
Centralizers Centring the casing string for the success
of cement job. Types
Rigid-Positive centralizers are designedfor a casing-casing annular spaceFlexible or spring bow type are used in
centring in uncased holes. There aretwo types: straight and spiralled
They help toKeep casing out of key seatsPrevent differential stickingImprove displacement efficiency
20
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Hardware Cement Plug Designed to separate the different fluids when
pumped through the casing. Plugs prevent contamination and wipe casing from
mud Prevent over displacement of cement Give surface indication that cement placement is
complete. Allow casing to be pressure tested. Bottom Plug
Bursts when slight over pressure is exerted.Besides seperating,it scrapes walls as it moves Top Plug
Provides seal and withstand high pressuresPumped on the tail end of slurry and comes to
rest on bottom plug Scratchers
Run on casing to remove mud cake and break upgelled mud.
Promotes a better bond between cement andformation
TypesRotating ScratchersReciprocating Scratchers
Source:weatherford
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
21
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Hardware
Cementing Heads Provides connection between
discharge line from cementunit and top of casing
Designed to hold cement plugs Releases bottom plug, mix and
pump down cement slurry Release top plug and displace
cement without makingconnection.
Cement plug need to installedcorrectly in the heads.
22
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Hardware
Cementing Baskets Equipment to minimise losses of
cement slurry in weak zones Used in shallow to medium depths Curb fluid passage considerably, but do
not prevent pressure transmission.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
23
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Lowering Casing
The casing must be lowered as fast as possible as time spent isNPT. Casing string lowering speed is controlled according to surge
pressures on wall and bottom. Carefully organized to prevent casing from being stuck. Spider and casing elevators are often used. Lengths of casing are screwed b means of hydraulic tongs. Driller monitors as casing string is filled up. Mud can be reconditioned and circulated while string is
manoeuvred and scratchers put to work. Circulation is stopped when
mud returns contains no more cuttings Low gas content No kicks or lost returns Homogeneous volume of circulating mud
24
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation Primary Cementing
Cement plugs placed correctly in cement head. Pump spacer ahead of cement. First plug (wiper) pumped down ahead of cement
to clean inside of casing. Landing collar acts as shoulder for bottom plug. Pressure surge ruptures bottom plug and allows
slurry to pass through and circulate into annulus. Slurry displaces mud and washes the outside wall
of casing as it flows. When slurry pumped down, top plug is released
and is pushed along down by drilling mud(flushing)
Pressure increases and top plug bumps againstlanding collar (not to exceed burst pressure)
Displace with spacer and low density mud.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
25
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation
Source:drilling,NGUYEN
26
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation Stage Cementing Carried out usually in longer strings in which the
annulus need to filled completely. Requirements of high pump pressures, longer
pumping times and excessive hydrostatic pressurefrom cement column leads to cementing
First stage Similar to earlier procedure, except that a
smaller volume is used to cement lower part ofannulus depending upon fracture gradient.
Second Stage Involves a stage collar, which is made up into
casing string at pre determined depth. Stage collar are initially closed by inner sleeve,
held by retaining pins. After first stage is complete, a special dart is
released from surface opening ports allowingcommunication between casing and annulus.
Circulate through stage collar and pump spacer Pump secondary stage slurry and release closing
plug. Displace cement with mud. Top plug closes by moving a second sleeve
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
27
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation
Risk of channellingand poor cementbond may arise???
28
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation Inner String Cementing
Large diameter casing result in ??????Large displacement volumesLong pumping times
Cement casing through tubing or drill pipeCasing run as beforeSpecial float shoe-allows drill pipe to be
stabbedCement job can then proceed as before.Inner string can be retrievedSuitable for casings of 13 3/8 and
largerDisadvantage of NTP for running and
retrieving inner string.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
29
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing OperationLiner cementing
Has a full length float collar , landing collar andshoe installed.
Landing collar catches the cement wiper plug. Wiper plug is held on end of the tail pipe by
means of shear pins. Liner is run on drill pipe and hanger set at
correct point inside previous casing string. Mud is circulated out to ensure it is free of
debris. Before cementing, setting tool is backed off. Pump spacer ahead and followed by slurry. Release pump down plug and displace cement
out of liner. Pump down plug releases wiper plug. Both move down until Landing collar. Bump plugs with 1000 psi pressure. Bleed off and check for back flow. Excess cement used to seal top of liner. Once cement is set, setting tool is picked up
out of liner With tail pipe above liner, excess cement is
reversed circulated
30
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Operation
LinerCementing
Source:drilling,NGUYEN
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
31
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cementing OperationProblems with cementing Liners
Minimal annular spacesClearance between 7 OD liner
and 8-1/2 hole.Difficult to run linerLost circulation problemsDifficult to centraliseCement placement poor
(channelling)
Mud contamination
Lack of pipe movement-due torisk of setting tool sticking
32
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cementing Job
Recommendations Use centralisers at critical
points along the casing string Moving the casing-rotation
rather than reciprocation Before cementing, ensure mud
has good flow properties Displace cement under
turbulent conditions if possible Spacers to prevent mud
contamination in annulus.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
33
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Squeeze Cementing
Process by which hydraulic pressure forcescement slurry through holes in casing intoannulus and formation
Often used as a remedial operation in workovers
34
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Applications To seal off gas and water producing zones and
maximize oil production from completioninterval.
Repair casing failure through leaking joints andcorrosion.
Seal off lost circulation zones. Remedial work on a poor primary cement job. Abandonment.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
35
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Processes of squeezingcement
High Pressure Low Pressure
36
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing OperationHigh Pressure Squeeze
Breaking down the formation andallowing cement slurry intofractured zone.
Carried out by solids free fluids water or brine.
Fracture occurs along planeperpendicular to direction of leastcompressive stress. At depths>3000 ft, vertical stresses aregreater than horizontal stresses.
After breaking formation, slurry ofcement is spotted adjacent toformation and pumped slowly.
Injection pressure gradually buildsup.
Pressure released for back flow. High Pressure squeeze jobs are
recommended for very dense andimpermeable formations.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
37
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Low Pressure Squeeze
Efficient method to seal unwanted zones Slurry of finely divided solids in liquid is forced
into formation without fracturing. Liquid is forced into formation and solids build up
cake. Reverse circulate out excess cement. Often used for repairing primary cement job.
38
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Placement Techniques Braden head Squeeze Retrievable squeeze packer Drillable cement retainer
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
39
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing OperationBraden head Squeeze
Pumping cement through drill pipewithout the use of packer.
Cement stopped at required depthand pressure build up is obtainedby closing BOPS at surface.
Displacing fluid is then pumpeddown, forcing cement intoperforations
Generally used for low pressurecement squeeze job.
DisadvantagesIt is difficult to place cement
accurately.Cannot be used for squeezing
off one set of perforations ifother are still open.
40
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing OperationRetrievable Packer
Can be set and released as many timeson one trip.
Isolate casing and well head while highpressure is being applied.
Can be either compression set or tensionset.
By pass ports allow annularcommunication
Generally set 30-50ft above perforations. Sometimes tail pipe is used below packer
to ensure only cement is squeezed
Procedure for squeezingRun packer on drill pipe and set at
depth to with bypass openPump cement slurry ,displace cement
and allow fluid to flow through bypass portsClose port when cement slurry
reaches packer.Apply squeeze pressureRelease pressure and check back flowRelease packer, pick up and reverse
circulate.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
41
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Secondary Cementing Operation
Drillable Retainer Contains two way valves to
prevent flow in either or bothdirections.
Used for primary cement jobsas well as closing waterproducing zones.
Run on drill pipe or wireline,once cement has beensqueezed, the drill pipe canbe removed, closing backpressure valve.
Can be used once then drilledout.
In multiple zones, retainerisolates lower perforations
42
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cement PlugsCement Plugs
Designed to fill a length of casing or open holeto prevent vertical fluid movement
Used for:Abandoning depleted zonesSeal lost circulation zonesProviding KOP for directional wellsIsolating zone for formation testingSeries of plugs for well abandonment
PrecautionsSelection of clean hole to prevent contaminationCondition mud prior to placing plugPre-flush fluid ahead of cementDensified slurry to be used.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
43
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cement Plugs
44
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cement Plugs
Balanced Plug Method achieves an
equal level of cement inthe drill pipe andannulus.
Preflush, cement slurryand spacer fluid arepumped down the drillpipe and displaced withmud.
Displacement continuesuntil level of cementinside and outside issame.
Drill pipe retrievedleaving plug in place.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
45
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cement PlugsDump Bailer Method
Set permanent bridge plug belowplug back depth
Cement bailer containing slurry isthen lowered down the well
When bailer reaches bridge plugthe slurry is released and set ontop
AdvantagesBetter depth controlReduced risk of contamination
DisadvantagesOnly small volume of cement
can be dumped and thereforeseveral runs requiredNot suitable for deep wells
unless retarders used.
46
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cement Evaluation Tools
Cement job can be considered a failure if: Cement does not fill annulus to required height. Cement does not provide good seal at shoe. Cement does not isolate undesirable zones.
Development Phase
September October 2005abalt solutions limited - 2005
INTRODUCTION TO HYDROCARBON EXPLOITATION
47
Abalt Solutions
Dev
elop
me
ntPh
ase
-C
emen
tin
g
2005 Abalt Solutions Limited. All rights reserved
Cement Evaluation Tools
Temperature surveys Running a recording
thermometer in thecasing aftercementing.
Thermometer respondsto heat generated bycement hydration todetect top of cement.
48
Abalt Solutions
Dev
elo
pmen
tPh
ase
-C
em
ent
ing
2005 Abalt Solutions Limited. All rights reserved
Cement Evaluation Tools Cement Bond Logs
Indicate presence ofcement and bond.
Tool emits sonic signalsand receives at receiver.
Amplitude indicateswhether bond is strongor weak.
Channelling can also bedetected.
Radioactive surveys Radioactive tracers can
be added to cementslurry before it ispumped.
Carnolite is commonlyused and detects the topof cement in annulus.