APPENDIX D
FIRST NATIONS CONSULTATION
����������� ����������� ���������������������� ����� ������������������������������������������������
Chief Joe MiskokomonChippewas of the Thames 320 Chippewa RoadR. R. #1Muncey, Ontario, N0L 1Y0
Chief William K. MontourSix Nations of the Grand River Territory1695 Chiefswood RoadP.O. Box 5000 Ohsweken, Ontario, N0A 1M0
Chief Patrick Waddilove Munsee-Delaware NationR. R. #1 Muncey, OntarioN0L 1Y0
Chief Randal Kahgee Chippewas of Saugeen R. R. #1 Southampton, Ontario, N0H 2L0
Chief Joel Abram Oneida Nation of the Thames2212 Elm AvenueSouthwold, Ontario, N0L 2G0
Chief Elizabeth J. CloudChippewas of Kettle & Stony Point 6247 Indian Lane, R.R. #2Forest, Ontario, N0N 1J0
Patrick Wedaseh MadahbeeGrand Chief Council Union of Ontario IndiansNipissing First NationP.O. Box 711North Bay, ONP1B 8J8
Grand Chief Randall PhillipsAssociation of Iroquois and Allied Indians387 Princess AvenueLondon, ONN6B 2A7
Gary Lipinski, PresidentMetis Nation of Ontario500 Old St. Patrick St., Unit 3Ottawa, ONK1N 9G4
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
May 28th
, 2010
NAME OF FIRST NATION
ADDRESS
Dear NAME OF CHIEF/ORGANIZATION,
Re: 401 Energy Ltd., Farm Owned Power (Melancthon) Ltd. Wind Farm
This letter is being sent to Aboriginal communities and organizations that 401 Energy
Ltd. has identified as potentially having an interest in the above noted project. While we
understand that the Ontario Ministry of the Environment (MOE) will be confirming the
list of Aboriginal communities that should be notified of this project, 401 Energy Ltd. is
taking the initiative to notify you in advance of receiving the list. Previous notification of
this project was sent to your community/organization in April, 2007.
401 Energy Ltd. intends to develop, with the project landowners, a 100 MW wind farm in
the Township of Melancthon in Dufferin County, Ontario (the “Farm Owned Power
(Melancthon) Ltd. Wind Farm”). The majority ownership of the project will be the local
community (land owners). 401 Energy Ltd. has been granted a contract for the sale of
electricity with the Ontario Power Authority (OPA) through the Province’s Feed-in-Tariff
(FIT) program. The project will require approval under Ontario Regulation 359/09 –
Renewable Energy Approval (REA) under the Green Energy Act. The REA process
replaces the previous process that required several separate approvals including, for
example, the Environmental Assessment Act, Planning Act and Environmental Protection
Act. As specified in the REA regulations (Section 17), a project proponent is required to:
• Notify Aboriginal communities of the proponent’s intent to develop the project;
• Provide Aboriginal communities with a copy of the draft Project Description
Report;
• Provide information regarding any adverse impacts that the project may have on
constitutionally protected treaty rights;
• Notify Aboriginal communities of each of the REA Reports that are to be
released; and
• Make a written request that the Aboriginal community provide in writing any
information available to the community that in its opinion, should be considered
in preparing the REA Reports and in particular, any information the community
may have about the adverse impacts that the project may have on constitutionally
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
protected aboriginal or treaty rights and any measures for mitigating those
adverse impacts.
While Section 17 of the REA Regulations makes reference to the need to submit the
above through a form that has been approved by the MOE, no such form is available at
this time, and the information/request is being made through this letter.
The following addresses the above-noted requirements:
Project Description
The draft Project Description Report (PDR) for this project is attached and includes a
map of the project area.
Information Regarding any Adverse Impacts on Aboriginal or Treaty Rights
There are no Aboriginal communities located within the Project Area, the Township of
Melancthon or Dufferin County as a whole. The Melancthon wind farm project lies
outside the Haldimand Tract, however, it is immediately adjacent to the Tract and it lies
within the Treaty of 1701 boundary. As such, the project may be of interest to the Six
Nations of Grand River community. 401 Energy Ltd. has arranged a meeting with the
Six Nations First Nation.
The following Aboriginal communities and organizations have also been identified as
potentially having an interest in the project:
� Chippewas of the Thames
� Chippewas of Saugeen
� Oneida Nation of the Thames
� Munsee-Delaware Nation
� Chippewas of Kettle & Stony Point
� Union of Ontario Indians
� Association of Iroquois and Allied Indians
� Metis Nation of Ontario
401 Energy Ltd. has no specific information with regard to potential adverse effects that
the project could have on the constitutional and/or treaty rights of the above noted
aboriginal communities. 401 Energy Ltd. is communicating with aboriginal communities
to confirm potential project interest.
REA Reports Summary
401 Energy Ltd. is in the process of completing the following technical reports which are
required for the REA submission to the Ministry of the Environment:
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
• Construction Plan Report – This report will include a description of the
following: construction activities; location and timing of the construction;
potential negative effects that might be incurred during construction; and
mitigation measures to be implemented to avoid/minimize the identified effects.
• Natural Heritage Features Summary Report – A description of the natural
heritage features in the project area (birds, bats, vegetation, terrestrial and aquatic
wildlife and habitats) and demonstration that required REA setbacks from natural
features have been met.
• Water Assessment Summary Report – A summary of water features in the
project area and demonstration that the required REA setbacks from water
features have been met.
• Design and Operations Report – A description of the following: site plan of the
project showing all project components and their locations; surface water supplies
to be used, potential emissions and waste; an environmental effects monitoring
plan; and response plan to communicate with affected parties.
• Consultation Report – A summary of communication and consultation activities
conducted to date with the public, government agencies and Aboriginal
communities as well as a summary of the communication and consultation
activities that are planned for the future under the REA process, including
responses to concerns that are received.
• Decommissioning Plan Report – A description of the activities that are to be
undertaken should the facility be decommissioned including: procedures to
dismantle the facility; land restoration activities; and procedures for waste
management.
• Noise Study Report – A description of the noise modeling results to demonstrate
that the renewable energy facility will meet MOE specified noise level levels.
• Wind Turbine Specification Report – A technical description of the equipment
and wind turbines to be used.
401 Energy Ltd. would be pleased to provide the above noted reports to interested
Aboriginal communities for their review and comments.
Request for Information
401 Energy Ltd. is making a written request to your community for information that
should be considered in the planning of this project, in particular any information that
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
your community may have regarding potential adverse impacts of the project on
constitutionally protected aboriginal or treaty rights and recommendations for measures
to mitigate these adverse impacts.
401 Energy Ltd. is pleased to continue communications with aboriginal communities
with respect to this Project. 401 Energy Ltd. is available to meet with aboriginal
communities representatives to present the project and results of the REA process and to
learn about your interests and potential concerns. I intend to follow-up with a phone call
to you, but if you have questions about the project, please do not hesitate to contact me
directly at (905) 910-0269 or via e-mail at [email protected].
Yours truly,
Ian Henderson
Assistant to the President
401 Energy Ltd.
Cc:
Mark Binnington, VP Operations, 401 Energy Ltd.
Don McKinnon, Dillon Consulting, REA Project Manager
Attach:
Project Description Report
����������� ����������� ���������������������� ����� ��������������������������������
Chief Joe MiskokomonChippewas of the Thames 320 Chippewa RoadR. R. #1Muncey, Ontario, N0L 1Y0
Chief William K. MontourSix Nations of the Grand River Territory1695 Chiefswood RoadP.O. Box 5000 Ohsweken, Ontario, N0A 1M0
Chief Patrick Waddilove Munsee-Delaware NationR. R. #1 Muncey, OntarioN0L 1Y0
Chief Randal Kahgee Chippewas of Saugeen R. R. #1 Southampton, Ontario, N0H 2L0
Chief Joel Abram Oneida Nation of the Thames2212 Elm AvenueSouthwold, Ontario, N0L 2G0
Chief Elizabeth J. CloudChippewas of Kettle & Stony Point 6247 Indian Lane, R.R. #2Forest, Ontario, N0N 1J0
Patrick Wedaseh MadahbeeGrand Chief Council Union of Ontario IndiansNipissing First NationP.O. Box 711North Bay, ONP1B 8J8
Grand Chief Randall PhillipsAssociation of Iroquois and Allied Indians387 Princess AvenueLondon, ONN6B 2A7
Gary Lipinski, PresidentMetis Nation of Ontario500 Old St. Patrick St., Unit 3Ottawa, ONK1N 9G4
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
September, 2010
NAME OF FIRST NATION
ADDRESS
Dear NAME OF CHIEF/ORGANIZATION:
RE: Farm Owned Power (Melancthon) Ltd. Wind Farm – Notice of Public
Meeting
As per our letter of May 28th
, 2010 (in which we attached a draft Project Description
Report), landowners in the Township of Melancthon are collaborating with 401 Energy
Ltd. on a locally-owned wind farm project.
The ‘Farm Owned Power (Melancthon) Wind Farm’ would be located approximately 16
kilometres north of the Town of Shelburne, in the Township of Melancthon and the
County of Dufferin, Ontario. If approved, this community-owned wind farm would be
rated as a ‘Class 4 Wind Facility’ under the Renewable Energy Approvals (REA)
regulation (O. Reg. 359/09) with an estimated nameplate capacity of 100 MW.
This project was previously publicly announced in March, 2007, and a public open house
was advertised and subsequently held in April, 2007. This project is now following REA
requirements and the first of at least two Public Information Centres (PICs) will be held
September 29th
, 2010. A copy of the combined Notice of Proposal and Notice of Public
Meeting has been attached to this letter as per the REA requirements of Section 16(6).
The PIC will provide an opportunity for you to ask questions and give feedback directly
to the project proponents.
Alternatively, 401 Energy Ltd. would be pleased to meet with you to discuss your
interests in regard to this project. If you would like any further information at this time, or
401 Energy Ltd. | 1 Valleywood Drive, Suite 3B | Markham, ON L3R 5L9
wish to set up a personal meeting, please do not hesitate to contact me directly at (905)
910-0269 or via e-mail at [email protected].
Yours truly,
Ian Henderson
Assistant to the President
401 Energy Ltd.
copy to:
Mark Binnington, VP Operations, 401 Energy Ltd.
Don McKinnon, Dillon Consulting, REA Project Manager
Attach:
Second Notice of Proposal and First Notice of Public Meeting
Dufferin Wind Power Inc. Farm Owned Power (Melancthon) Ltd. Wind Farm First Nations Letters Sent March 12, 2012
Chief Liz Cloud Chippewas of Kettle and Stony Point 6247 Indian Lane Kettle & Stony Point, ON N0N 1J0
Mr. Joel Abram Oneida Nation of the Thames RR 2 Southwold, ON L9M 0A9
Chief Donna Big Canoe Chippewas of Georgina Island First Nation P.O. Box N-13, RR 2 Sutton West, ON L0E 1R0
Chief Sharon Stinson Henry Chippewas of Mnjikaning First Nation 5884 Rama Road, Suite 200 Rama, ON L0K 1T0
Chief Scott Lee Chippewas of Nawash Unceded First Nation 135 Lakeshore Blvd. RR 5 Wiarton, ON N0H 2T0
Chief Richard “Joe” Miskokomon Chippewas of the Thames 320 Chippewa Road, RR 1 Muncey, ON N0L 1Y0
Chief Kris Nahrgang Kawartha Nishnawbe First Nation P.O. Box 1432 Lakefield, ON K0L 2H0
Grand Chief Randall Phillips Association of Iroquois and Allied Indians 387 Princess Avenue London, ON N6B 2A7
Ms. Sarah Sandy Beausoleil Chippewas of Christian Island 11 Ogemaa Miikaan Chimnissing, ON L9M 0A9
Chief Patrick Waddilove Munsee-Delaware Nation RR 1 Muncey, ON N0L 1Y0
Aboriginal Name and Address
March 12, 2012
���� �������������������������������������������������� ���������������������� ���� ������������� ��������������� ����������������������������������������
Dear XXXX:
This letter provides a Notice of Public Information Centre #1 under Ontario Regulation 359/09 – Renewable Energy Approvals (REA) under Section V.0.1 of the Ontario Environmental Protection Act.
In September 2011, Dufferin Wind Power Inc. (DWP) held its’ first round of Public Information Centres for the Dufferin Wind Power Project. At that time a 69kV power line option (within road rights-of-way) was presented to the public. Based on feedback provided by the public and stakeholders DWP is currently examining asecond power line option. DWP is looking to permit both power line options but only one option would be constructed.
The proposed 230kV power line would commence at the project substation located on west ½ of Lot 26, Concession 2, Township of Melancthon and head west through a private easement to an abandoned rail corridor, owned by the County of Dufferin. The proposed power line would then end at part Lot 2, Concession 2, Township of Amaranth, adjacent to the existing Orangeville Transformer Station to connect the power line to the Provincial grid system.
DWP and its’ environmental consultant, Dillon Consulting Limited (Dillon) intends to hold three Public Information Centres to present the 230kV power line option, in each of the affected municipalities, the Townships of Melancthon and Amaranth and the Town of Shelburne. Please see the attached notice for dates, times and locations.
As per REA requirements, a copy of the Project Description Report (PDR) will be made available at the PIC for public and stakeholder review.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Dufferin Wind Power Inc. Farm Owned Power (Melancthon) Ltd. Wind Farm First Nations Letters Sent May 24, 2012
Chief Liz Cloud Chippewas of Kettle and Stony Point 6247 Indian Lane Kettle & Stony Point, ON N0N 1J0
Mr. Joel Abram Oneida Nation of the Thames RR 2 Southwold, ON L9M 0A9
Chief Donna Big Canoe Chippewas of Georgina Island First Nation P.O. Box N-13, RR 2 Sutton West, ON L0E 1R0
Chief Sharon Stinson Henry Chippewas of Mnjikaning First Nation 5884 Rama Road, Suite 200 Rama, ON L0K 1T0
Chief Scott Lee Chippewas of Nawash Unceded First Nation 135 Lakeshore Blvd. RR 5 Wiarton, ON N0H 2T0
Chief Richard “Joe” Miskokomon Chippewas of the Thames 320 Chippewa Road, RR 1 Muncey, ON N0L 1Y0
Chief Kris Nahrgang Kawartha Nishnawbe First Nation P.O. Box 1432 Lakefield, ON K0L 2H0
Grand Chief Randall Phillips Association of Iroquois and Allied Indians 387 Princess Avenue London, ON N6B 2A7
Ms. Sarah Sandy Beausoleil Chippewas of Christian Island 11 Ogemaa Miikaan Chimnissing, ON L9M 0A9
Chief Patrick Waddilove Munsee-Delaware Nation RR 1 Muncey, ON N0L 1Y0
…continued
May 24, 2012
ADDRESS
Attention: NAME
����������������������������������������� ������������������������������������������������ ���������������
Dear NAME:
This letter provides a Notice of Public Information Centre #2 and Notice of Draft REA Public Release under Ontario Regulation 359/09 – Renewable Energy Approvals (REA) under Section V.0.1 of the Ontario Environmental Protection Act.
In September 2011, Dufferin Wind Power Inc. (DWP) held its first round of Public Information Centres (PIC) for the Dufferin Wind Power Project. At that time, a 69kV power line option (within road rights-of-way) was presented to the public. Based on feedback provided by the public and stakeholders, DWP examined a second power line option. Another series of PIC’s #1 were held in April 2012 to present the alternative 230kV power line option.
This notice is to announce the final PIC which is being held to present information on the entire project and will serve as PIC #2 for both power line options. DWP is looking to permit both power line options but only one option will be constructed.
DWP and its environmental consultant, Dillon Consulting Limited (Dillon) intends to hold a series of PIC’s in the Township of Melancthon (July 23), the Town of Mono (July 24), the Township of Mulmur (July 25), the Town of Shelburne (July 26) and the Township of Amaranth (July 27). Please see the attached notice for details regarding dates, times and locations. The same information will be presented at each of the meetings.
Kawartha Nishnawbe First Nation Page 2 May 24, 2012
Further to this notice, the Draft REA documents (with the exception of the Consultation Report, in accordance with O.Reg 359/09) are available for public and stakeholder review as of May 24, 2012, on the project website (http://www.dufferinwindpower.ca) and at the following Municipal Offices: Townships of Melancthon, Mulmur, Amaranth and the Towns of Mono and Shelburne.
On February 24, 2012, DWP released a set of draft REA reports to your community. Minor changes have been made to the site layout based on comments received from the Ministry of Natural Resources.
If you would like a revised set of REA reports, either in print, on a CD or would like to set up a meeting to discuss the project, please contact me at 1-888-345-5668 ext 1341 or by email at [email protected].
Yours very truly,
��������������������������
Rebecca Crump, M.Sc.Pl REA Project Coordinator
RLC:sm
Encl: Notice of Public Information Centre #2 and Notice of Draft REA Public Release
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. Notice of Public Information Centre.
Welch, Michelle <[email protected]>
Fwd: Dufferin Wind Power Project - Request for Information1 message
Crump, Rebecca <[email protected]> Fri, Nov 2, 2012 at 3:56 PMTo: Michelle Welch <[email protected]>
please include changes appendix for First NationsRebecca Crump, MSc.Pl.AssociateDillon Consulting Limited130 Dufferin A venue Suite 1400London, O ntario, N6A 5R2 T - 519 .438 .1288 ext. 1341F - 519-672-8209M - 519-200-7203RC [email protected]
� Please cons ider the environment before printing this email
---------- Forwarded message ----------From: Crump, Rebecca <[email protected]>Date: Fri, Nov 2, 2012 at 3:56 PMSubject: Dufferin Wind Power Project - Request for InformationTo: [email protected]
Hello Mr. Trimble,
I am following up with your request for more information on the Dufferin Wind Power Project. I understand that theBeausoleil Chippewas of Christian Island have a definite interest in the Project.
You indicated on the telephone today that you don't believe you have received anything regarding the DufferinWind Power Project. For your reference, we have been sending notifications to Ms. Sarah Sandy, ResourceManagement Officer.
Please see the download link below for the Final Project Description Report that was submitted on August 13,2012 to the Ministry of the Environment.
Download Link:https://dl.dropbox.com/u/18620686/DWP_Final%20Project%20Description%20Report_August%202012.pdf
We would be happy to discuss the project with you either over the phone or in person. Please let me know what would work best.
Best Regards,
Rebecca
Rebecca Crump, MSc.Pl.
AssociateDillon Consulting Limited130 Dufferin A venue Suite 1400London, O ntario, N6A 5R2 T - 519 .438 .1288 ext. 1341F - 519-672-8209M - 519-200-7203RC [email protected]
� Please cons ider the environment before printing this email
September 20, 2012
Beausoleil Chippewas of Christian Island Christian Island 30, General Delivery Chimnissing, ON L9M 0A9
Attention: Sarah Sandy, Resource Management Officer
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Ms Sandy:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Georgian Bay Metis Council 355 Cranston Crecent, P.O. Box 4 Midland, ON L4R 4K6
Attention Mr. Alden Barty
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Mr. Barty:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project.
We have not received further input from the MNO since our last meeting with the Georgian Bay Metis Council on November 7, 2011. Again, we would like to offer the opportunity to have discussions and or meet with representatives of your community for us to present the proposed project and receive your comments.
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex
200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Chippewas of Georgina Island First Nation RR 2, P.O. Box 13 Sutton West, ON L0E 1R0
Attention: Chief Donna Big Canoe
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Donna Big Canoe:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Great Lakes Metis Council 380, 9th Street East Owen Sound, ON N4K 1P1
Attention Mr. Ray Racicot
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Mr. Racicot:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible.
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Haudenosaunee Development Institute 16 Sunrise Court, Suite 407 P.O. Box 714 Ohsweken, ON N0A 1M0
Attention Ms. Hazel Hill
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Ms. Hill:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project.
While we have had some initial contact with your community, we have not received further input regarding your confirmed level of interest in the project. Again, we would like to offer the opportunity to have discussions and or meet with representatives of your community for us to present the proposed project and receive your comments
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012
TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Association of Iroquois and Allied Indians 387 Princess Avenue London, ON N6B 2A7
Attention Grand Chief Randall Phillips
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Phillips:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Kawartha Nishnawbe First Nation P.O. Box 1432 Lakefield, ON K0L 2H0
Attention Chief Kris Nahrgang
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Kris Nahrgang:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Chippewas of Stoney and Kettle Point 6247 Indian Lane Kettle and Stoney Point, ON N0N 1J1
Attention Chief Liz Cloud
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Liz Cloud:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including theSaugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Metis Nation of Ontario Consultation Unit 500 Old St. Patrick St., Unit 3 Ottawa, ON K1N 9G4
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received further input from the MNO since our last meeting with Georgian Bay Metis Council on November 7, 2011. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible.
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Chippewas of Mnjikaning First Nation Chippewas of Rama 5884 Rama Road, Suite 200 Rama, ON L0K 1T0
Attention: Ms. Karry Sandy-McKenzie
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Ms. Sandy-McKenzie:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm
PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Munsee-Delaware Nation RR 1 Muncey, ON N0L 1Y0
Attention Chief Pattrick Waddilove
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Pattrick Waddilove:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Oneida Nation of the Thames RR 2 Southwold, ON N0L 2G0
Attention Chief Joel Abram
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Joel Abram:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Chippewas of Nawash Chippewas of Saugeen Saugeen Ojibway Nation RR 1 South Hampton, ON N0H 2L0
Attention Ms. Joselyn Keeshig
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Ms. Keeshig:
This letter is to inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Six Nations of the Grand River 1965 Chiefswood Road, P.O. Box 5000 Ohsweken, ON N6B 2A7
Attention: Chief William Montour
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief William Montour:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project.
Since our last meeting with your community representatives on June 13, 2012, we have not received further input regarding your confirmed level of interest in the project. Again, we would like to offer the opportunity to have discussions and or meet with representatives of your community for us to present the proposed project and receive your comments.
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������
DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Chippewas of the Thames First Nation 320 Chippewas Road, RR 1 Muncey, ON N0L 1Y0
Attention Chief Richard Miskokomon
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dear Chief Richard Miskokomon:
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receive your comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall
374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre
September 20, 2012
Union of Ontario Indians 1 Miigizi Mikan North Bay, ON P1B 8J8
����� ����������������������������������������������� ������� ��������������� ���� ������������� ��������������� ��������������
Dufferin Wind Power Inc. (DWP) is proposing to develop a 100 MW wind farm located within the Township of Melanchthon, Ontario (north of the community of Shelburne, Ontario). As part of our ongoing consultation process and the Renewable Energy Approval (REA) program, we have sent previous notices and documentation to the attention of your community about the Dufferin Wind Project. We have also had the opportunity to engage with several aboriginal communities including the Saugeen Ojibwa Nation (SON), Six Nations of the Grand River, and the Georgian Bay Metis Council.
We have not received any response from your community on previous correspondence that has been sent. We would like to again offer the opportunity to meet with representatives of your community to present the proposed project, receiveyour comments and determine if your community will have an interest in the project. The REA application was submitted to the Ministry of Environment in August for the completeness review. As such, it is important that should your community have potential interest in the project, that we be advised of this as soon as possible.
This letter is to also inform you of the upcoming additional public information meetings (PIC) for the Farm Owned Power (Melancthon) Ltd. /Dufferin Wind Farm (DWP), to be located in Melancthon Township. Public Information Centres (PIC) for the Project under the Renewable Energy Approvals were held in September 2011 and in April and July 2012. Additionally PICs are being held in Amaranth, Shelburne and Melancthon to present additional details and changes to the wind farm layout design and the 230 kV transmission line since last presented to the public. Wind turbine locations have remained the same since the last Public Information Centres in July 2012.
The dates and locations of the additional PIC meetings that are being held to present further details on the 230kV power line option are as follows:
���������������������� ���������������������������DATE: Monday October 22, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Amaranth Township Banquet Hall 374028 6th Line, Amaranth
������������������� ���������������������������DATE: Tuesday October 23, 2012
TIME: 6:00 pm to 8:00 pm PLACE: Centre Dufferin Recreation Complex 200 Fiddlepark Lane, Shelburne
��������������������� ���������������������������DATE: Thursday October 24, 2012 TIME: 6:00 pm to 8:00 pm PLACE: Horning’s Mills Community Hall14 Mill Street, Horning’s Mill
The project will require approval under Ontario Regulation 359/09 – Renewable Energy Approval under Section V.0.1 of the Ontario Environmental Protection Act.An application was submitted to the Ministry of the Environment for assessment of completeness in August, 2012. Changes to the project resulting from this additional consultation will be documented in an addendum and submitted for review to the Ministry of the Environment.
If you have questions, comments, or concerns about the project or would like to meet the project proponents on an individual basis please do not hesitate to contact me at 416-229-4647 ext 2355 or by email at [email protected].
Yours very truly, ����������������������� �
Don P. McKinnon, MES, MCIP REA Project Manager
Encl. -Notice of Additional Public Information Centre