    Virginia Natural Gas is beginning construction o the 11-mile Lanexato West Point transmission pipeline. Throughout the coming months,

    contractors will be working in your area digging, drilling and installing

    the pipeline. This line will enable us to bring aordable, abundant and

    domestic natural gas to New Kent County and the surrounding areas.

    Saety is our top priority, as is the case with all o our construction

    projects. Virginia Natural Gas takes great care in all phases o the

    project rom beginning to end. We will make every eort to minimize

    inconveniences to property owners along the route. Virginia Natural

    Gas will provide ongoing updates to local community groups

    and elected ofcials throughout construction. I you have any

    questions during construction, please do not hesitate to contact

    the Construction Supervisor, Je Duer, at 757.438.7990 or

    [email protected].

    Route Description:

    8 miles o 12-inch pipe to Route 30/33 within the existing

    Dominion Virginia Power right-o-way.

    Transitions to 8-inch pipe or an estimated 1 miles within the

    Dominion Virginia Power right-o-way.

    Travels through private easement or about o a mile beore

    returning to Route 30/33, where the line crosses the Pamunkey

    River and proceeds into West Point.

    Benefts o Natural Gas:

    Abundant

    Domestic

    Environmentally Friendly

    Aordable with record low prices

    Thank you in advance or your patience and understanding

    as we construct this transmission pipelines.

    Lanexa to West PointTransmission Pipeline Project

    HISTORY OF VIRGINIA NATURAL GA

    We operate: More than 5,500 miles o

    pipeline each day.

    Weve maintained: A transmission

    pipeline system in New Kent County

    since 1992.

    Weve built: 19 miles o pipeline in

    New Kent County since 2006.

    We serve: More than 300 customers inNew Kent County.

    NATURAL GAS PIPELINE SAFETY

    180,000 miles o gas transmission

    pipelines operate in the United States

    Virginia Natural Gas pipelines are

    monitored 24 hours a day, 7 days

    per week

    Emergency response hotline

    1.877.572.3342

    Multiple, remotely operated, control

    valves

    Virginia Natural Gas conducts monthly

    aerial patrols, and multiple internal an

    external pipeline inspections

    2012 AGL Resources Inc. All rights reserved. VNG-9947

  • 7/31/2019 VNG Lanexa Handout

    2/2

    0 2,500 5,000 7,500 10,0001,250

    Feet

    Legend

    Lanexa to West Point Pipeline Alignment

    Virginia Power Easement

    Project Parcels

    DIASCUND CREEK RESEVOIR

    ROUTE 60

    I-64

    HOMESTEAD

    RD

    STAGERD.

    NEWKENTHW

    Y

    POLISHTOW

    NRD

    ELTH

    AMRDSR

    30/3

    3

    PAMUNKEYRIVER

    Scale:

    KHA #: 116440014

    Date: 5/3/2012

    I-64

    Start of Project

    End of Project