Uke Kurniawan Usman - 2005 1 GSM Fundamental By Uke Kurniawan Usman.
Usman Ali Resume786
Transcript of Usman Ali Resume786
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
USMAN ALI
OBJECTIVE
Set to learn, in a challenging and rewarding environment, which will provide me with an opportunity to nurture my professional growth, enable me to utilize my abilities to maximum so as to become a key player & valuable asset for the organization .
CARRIER SUMMARY
Overall 13+ years of professional experience with a diversified range of applications like Projects, Commissioning, Production/Operations in Oil and Gas, Petrochemical, Gas Reforming and Steel Industries.
Strong team player with proven track record in Plant operations, Plant and Corporate Safety, Environmental and Training activities. Special skill areas include HSE awareness, good organizational and planning abilities and trouble shooting.
Specialties: Water Treatment Plant Installation. Commissioning and Operations. Equipment Selection, Training and Development, Optimization of Plants.
My career synopsis is:
TSML DRI Process Plant ( From March 2007 to Date) TSML is the environmental friendly steel manufacturing project which is based on the worlds most advanced Direct Reduce Iron (DRI) technology of the Midrex Technology (USA) owned by Kobe Steel of Japan with a Design capacity to produce 1.28million tons of high quality DRI per annum.
In-Charge / Deputy Manager RO & Utilities Commissioning Engineer RO & Utilities Operations Project Engineer RO & Utilities
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
Al-Abbas Chemical Industries (From May 2005 to February 2007)
In-Charge Water System
Faiz Enterprise Water Treatment Company. (From March 2001 to March 2005)
Service Engineer Water Treatment System Trainee Engineer
ACADEMIC RECORD
(B.Tech.Hons) Electrical: Mehran University of Engg. & Tech. 2010 1st Div
DAE Electrical: Karachi Technical Board 2001 1st Div
Matriculation: Karachi Board 1996 1st Div
PROFESSIONAL EXPERIENCE & TECHNICAL ATTAINMENT
TUWAIRQI STEEL MILLS LIMITED (From March 2007 to Date):
Utility Complex18-Inch GRP 15.5 km Water Supply Line from KWSB12-Inch HDPE 3.6 km Water Supply Line from PSMLWater Reservoir (16,000 m³) / Pump HouseRO-Plant Tanks (9,000 m³) / Super Structure 1250 sq-mBWRO Plants with MMF/UF Plants (6500 m3/Day)SWRO Plant (500 m³/day) SWRO Modification/Overhauling (600 m³/day) Drinking Water Plant (3450 B/day)Fire Water Pump House & Network 2KMMakeup Water Pump House & Network 1 kmNatural Gas Pipe Lines (24-Inch / 16-Inch – 1.25 km/EA)Nitrogen Gas System (66,000 Nm3) – LINDEY PakistanWater Complex Area – NALCO / GE Based System
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
Achievements: Outstanding performance of SWRO Plant is to produce water having TDS less then 50
ppm from 70000 ppm on scheduled time (Total 1000 m3 supplied to date) for commissioning activities of MCW system (saving heavy cost Rs, 6.0 million on purchase of less then 50 ppm water.
Maintaining SWRO Plant product water quality and quantity up to 7 years with out any change while R.O membrane life about 3 years.
Modification of 500 Cubic meters per day RO plant from Sea water to brackish water RO plant. (Save amount Rs, 4.5 Million )
Current Responsibilities: Overall responsible of Operation of Utilities department including the operation of
SWRO Plant, BWRO Plant, Drinking Water Plant, Makeup Water supply, Potable Water Supply, Pak steel water supply, KWSB water supply, cooling Tower water treatment, Fire Water Pump House, Nitrogen supply & Natural Gas Supply etc.
Lead the team of 35 employees including Engineers, Shift In charge, Supervisor, Operators and contractors M/S Water Regime and GE
Plane, execute, monitor and expedite the daily maintenance activities. Review the plant daily operational report and advice to achieve the optimum value to
increases the production all plants. Follow the standard operating procedure related to plant safety and operation. Prepare the Technical specification & RFQ. Estimation of Capex, Opex, Volume of Work, Electrical Loads and Manpower. Review the Design and Drawing if any modification and new installation required. Carry out monitoring of all equipment, allied piping and storage facilities for
reliability and health condition using different non destructive techniques and acquire services from inspection department if required.
Coordination, Planning, Monitoring and expediting of utility related works. To conduct training of staff for the improvement of safety awareness and technical
skills to perform as team work Responsible for Team building of services / Utility Department.
Responsible for production operation teams competency, development of talent, training requirement s and mentoring.
Working on QMS ISO 9001:2008 Certification as DMR. Prepared different SOP’s, Work Instructions, JD’s and Formats of Water treatment
Plant. Issue all type of work permits for execution the maintenance activities at water
treatment plant.
Responsibilities during Project & Commissioning Phase:
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
SWRO Plant & Bore Wells: Successfully selection, Installation & Commission of PLC Automatic Sea Water RO
Plant (SWRO) having a capacity of 500 cubic meter per day which including ERT. Successfully designing and excavation of 500ft depth and 10” casing diameter Bore
Wells (06 number). Successfully selection, Installation & commission of Bore Well submersible pump. Successfully designing, Laying of SWRO Reject line diameter 6” & length 1km. Successfully designing, Installation & commission of Product water supply pump &
line.
BWRO Plant & Makeup Water Supply Pumps: Successfully for selection, designing, Installation & commission of fully Automatic
(PLC/SCADA) having capacity of 6500 cubic meter per day brackish water RO plant and same capacity Ultra Filtration which is one of the biggest RO plant so for deployed in Pakistan.
04 numbers of RO Trains, 2 numbers of UF Train, 12 numbers of Multimedia system, Successfully selection, installation & commission of Treated water supply pump and
line. Successfully laying & jointing of Reject water line. Involved in designing of settling ponds
Cooling Tower Responsible for procurement and application of different chemicals for dosing of
cooling towers, RO and boiler. Responsible for testing and quality of water required for cooling towers.
Fire Water Pump House & Network Successfully selection, Installation and commission of Fire water pump house &
network Laying & jointing of network line diameter 10” & length 1.5 km Installation of Fire water Tank capacity 1200 cubic mete
Drinking Water Plant Successfully selection, designing, installation & commission of Fully Automatic (PLC)
having capacity of 150 bottles (19litter) per hour Drinking water plant.
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
Al- Abbas chemical Industry As In Charge Water System (From 2005 To 2007):
Achievements:
Successfully achieve SDI less then 3 from 25 with settling pond without Ultra filtration.
Responsibility of During Project Phase: Successfully installed and commission of fully automatic 120 cubic meter per day
brackish water RO plant. Successfully installed and commission of 120 cubic meter per day DI plant for boilers
of 14MW steam turbine. Successfully installed & commission of 600 cubic meters per day brackish water RO
plant.
Responsibility After Project Phase: Responsible for all water treatment plant operation & maintenance. Responsible for all treated water requirement and its distribution inside and outside
plant battery limits. Responsible for procurement and application of different chemicals for dosing of
cooling towers and boiler. Responsible for testing and quality of water required for cooling towers and 60 ton
boiler. Inspection of equipment. Training of operators
Faiz Enterprises As Service Engineer (From 2000 To 2005): Worked as a service Engineer and was responsible for installed numerous RO plants and responsible for Installation, commissioning, Maintenance, Operation and backup support of total water treatment plant with Mechanical, Electro-mechanical, Microprocessor and PLC based control system.
Filters Softener, single ,Duplex with PLC control Deionizer (Ion Exchanger, Electro De-ionizer) Reverse Osmosis Ultra Filtration RO cleaning Ultra violet
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
Metering Pump Chemical Dosing and control equipment PH conductivity regulator Water testing and quality Calibration of Instruments PVC plumbing Operator training
Major projects with Faiz Enterprises
REVERSE OSMOSES PLANT
Client Location Capacity
Pakistan petroleum Larkana 7 cubic meter/hourFARAN CLUB Karachi 5 GPMPOF somiani Balochistan 10,000 GPMSUPARCO Balochistan 10,000 GPMNestle Karachi 6cubic meter/hourDEWAN sugar mill Badin 30 cubic meter/hourWYETH Pakistan Karachi 3 cubic meter/hourNATIONAL FOODS Karachi 10 cubic meter/hour
DE-IONIZATION PLANT
Client Location Capacity Pakistan petroleum Larkana 7 cubic meter/hour WYETH Pakistan Karachi 12 cubic meter/hour PFIZER Pakistan Karachi 10cubic meter/hour GLAXO WELCOME Pakistan Karachi 2x14 cubic meter/hour P&G Pakistan Hub 8 cubic meter/hour BOLAN CASTING HUB Hub 0.7 cubic meter/hour
WATER FILTER & SOFTENING PLANT
Client Location Capacity ENAR PETROTECH Karachi 3 cubic meter/hour KARACHI GRAINS Karachi 10 Cubic meter per hour YOUNIS TEXTILE Karachi 2x 17 cubic meter/hour BMS Pakistan Karachi 2x6 cubic meter/hour
Permanent Address: H.no A-1157 Gulshan-e-hadeed Phase-2 Bin Qasim town Karachi-75010.
+923342310584 Home- +922134710926 [email protected] ,
ROCHE PHARMA Karachi 2x6 cubic meter/hour GELCAP Hub 2x19 cubic meter/hour GATRON Hub 2x8 cubic meter/hour GLAXO WELCOME Pakistan Karachi 2x14 cubic meter/hour NATIONAL FOODS Karachi 10 cubic meter/hour
IN HOUSE TRAINING
Fire Fighting System (Four Days) Conducted by HSE Department TSML In 2008. Permit To Work System (PTW) (Six Days) Conducted by HSE Department TSML in
2014.
OTHER STRENGTHS
Proficient in using Microsoft Word, Excel, Power point and AutoCAD. Well Organized, Excellent Troubleshooting and Analytical Skills. Excellent Interpersonal and Team Skills. Fluent oral and written English/Urdu, Intermediate Punjabi. And Sindhi
HOBBIES & EXTRACURRICULAR ACTIVITIES
Playing cricket Cycling Stamps and Coins Collection Amateur Cooking Traveling Performing arts
PERSONAL INFORMATION
Father’s name Muhammad Rafi
Date of birth
Marital Status:
5st May 1979
Married.
Place of Birth Karachi
Nationality Pakistani
Religion Islam
N.I.C no.
Skype ID:
42501-1431256-3usmanalitbs