CONTINENTAL BRIDGE & WEST DALLAS GATEWAY trinity river corridor project committee 01.09.12dallas citydesign studio 1
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
3/44
purpose
Provide an overview of all of the projects affiliated with the Continental Bridge conversion
Review anticipated schedule and budget
Outline additional next steps
dallas citydesign studio 2
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
4/44
2006 Bond Program included $1.9 million for Continental Bridge and $1.8 million for the WestDallas Gateway
$8 million in additional funds donated for the Continental Bridge Project
Planning efforts with the community by the dallas citydesign studio defined the program for theWest Dallas Gateway project to connect West Dallas to the Continental Bridge
backgrounddallas citydesign studio 3
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
5/44
ContinentalBridge
dallas citydesign studio 4
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
6/44dallas citydesign studio 5
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
7/44dallas citydesign studio 6
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
8/44
FLOWER
GATEWAYTrefoil shadestructures with vines& seatingVending areas
150.
dallas citydesign studio 7
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
9/44dallas citydesign studio 8
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
10/44dallas citydesign studio 9
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
11/44
PLAY AREA
Shade TreesSeatingBocce CourtChess PanelClimbing BlocksSidewalk Games
150 300
dallas citydesign studio 10
WRT
(POTENTIALINTERIM,USE)
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
12/44dallas citydesign studio 11
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
13/44dallas citydesign studio 12
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
14/44
dallas citydesign studio 13
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
15/44
FOUNTAIN/ MISTPLAZAProgrammable Mistand Water JetsSeating AreaCooling Fog Poles
150150 300
dallas citydesign studio 14
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
16/44
ISLAND GARDENS
Shade treesPlantersHanging vinesSeating
150 300 180150
dallas citydesign studio 15
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
17/44
dallas citydesign studio 16
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
18/44
dallas citydesign studio 17
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
19/44
MEDITATION PLAZA
Labyrinth
150 300 180 230150
dallas citydesign studio 18
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
20/44
dallas citydesign studio 19
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
21/44
EVENT PLAZAShade treesPlantersSeatingElectrical supply
150 300 180 230 640150
dallas citydesign studio 20
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
22/44
dallas citydesign studio 21
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
23/44
dallas citydesign studio 22
WRT
example style of light fixture
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
24/44
dallas citydesign studio 23
WRT
limits of constructionlandscaping to include 9 staircase
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
25/44
PEDESTRIANPEDESTRIAN
ZONEZONE
SPECIALSPECIAL
EVENTEVENTCONTROLCONTROL
POINTPOINT
NORMALNORMALCONTROLCONTROLPOINTPOINT
removable bollards
dallas citydesign studio 24
WRT
limits of construction
on eastern end of projectlandscaping to include 9
trees and shrubs
no change proposed
to street configuration
area for parallel parking
RIVE
RFRONTBLVD
RIVE
RFRONTBLVD
CONTINENTALST
CONTINENTALST
staircase
landscaping to include 9 staircase
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
26/44
dallas citydesign studio 25
WRT
landscaping to include 9
trees and shrubs
area available for special
event parkingremovable bollards
Section through the eastern end of Continental looking toward Riverfront Blvd
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
27/44
WesternGateway
dallas citydesign studio 26
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
28/44
TxDOT reconfigured intersection
levee top canada drivecontinental
pedestrian bridge singleton avenue margaret hunt hill bridge
dallas citydesign studio 27
id t bi l & id f i l
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
29/44
early community planning to define the projects program
provide neighborhood
access to the park and
Continental Bridge
provide much-needed
vehicular parkingcreate a
plaza/gathering
space
provide a strong bicycle &
pedestrian connection from the
bridge/plaza to adjacent
development opportunities
provide for occasional
vehicular access to the
Continental Bridge for
emergency and service vehicles
utility station/additional median
enhancements as a future design
opportunity for the gateway
utility station/additional median
enhancements as a future design
opportunity for the gateway
dallas citydesign studio 28
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
30/44
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 29
WRT
FUTURE
IMPROVEMENTS
current proposed design
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
31/44
dallas citydesign studio 30
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
32/44
dallas citydesign studio 31
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
33/44
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 32
pedestrian connectivity
WRT
SEAT WALL(SPECIALFEATURE)
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
34/44
dallas citydesign studio 33
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
35/44
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 34
bike connectivity
WRT
Potential futureDART bus stop
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
36/44
Sin
gleton
Blv
d.
N.Beckle
dallas citydesign studio 35
WRT
vehicular connectivity
GuldenSt.
EMERGENCYACCESS
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
37/44
FUTURECONCESSIONS& RESTROOM
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 36
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
38/44
PICNIC AREA
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 37
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
39/44
POTENTAILAREA FORFUTURE STREET
FAIR/ MARKETTENTS
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
dallas citydesign studio 38
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
40/44
GuldenSt. S
ingle
ton
Blv
d.
N.Beckle
POTENTIALAREA FORFUTURESTAGE /
FESTIVALTENT
dallas citydesign studio 39
WRT
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
41/44
Project Budget:Continental Bridge: $9.9 million Inclusive of design/ engineering and construction
West Dallas Gateway: $1.8 million Inclusive of design/ engineering andconstructionTotal Budget: $11.7 millionAvailable Funding: $11.7 million
Project Schedule:Bid Documents Design underway
Bid Advertisement March 2012Thoroughfare Plan Amendments March 2012Bid Award April 2012Construction Duration 16 monthsProject Opening August 2013
Project Awards for Continental Bridge:
2011 Dream Award from the Greater Dallas Planning Council
dallas citydesign studio 40
anticipated schedule and budget
Delete Continental
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
42/44
Sin
gleton
Blv
d.
N.Beckle
dallas citydesign studio 41
WRT
thoroughfare plan amendments
Delete Continental
Avenue from Singleton
to Riverfront from the
Thoroughfare Plan
GuldenSt.
Delete Canada Drive
from Singleton to
Gulden from the
Thoroughfare Plan, ifnecessary
Change Beckley-
Canada Connection to
North Beckley Avenue
-
7/31/2019 TRC_ContinentalBridgeWestDallasGateway_010912
43/44
next steps: thoroughfare plan amendment process
1| CPCTransportationCommittee February2,20122| CityPlanCommission February16,20123| CityCouncil March28,2012