Consulting | Solutions | Products | Training
Integration of Financial & Project Data
TPG PSLink®
Clear benefits in the areas of
- Management
- Controlling
- Project Management
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
Streamlined project management processes
The Benefits of PM System Integration
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
Streamlined project management processes
Data consistency in all the systems involved
The Benefits of PM System Integration
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
Streamlined project management processes
Data consistency in all the systems involved
Eliminates need for data admin in multiple systems
The Benefits of PM System Integration
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
Streamlined project management processes
Data consistency in all the systems involved
Eliminates need for data admin in multiple systems
Better data quality as a basis for decision making for project
managers, financial controllers and management
The Benefits of PM System Integration
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
Streamlined project management processes
Data consistency in all the systems involved
Eliminates need for data admin in multiple systems
Better data quality as a basis for decision making for project
managers, financial controllers and management
Integration of project planning, financial controlling,
collaboration and document management
The Benefits of PM System Integration
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
What is the quickest and easiest way to do this?
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
With TPG PSLink®
What is the quickest and easiest way to do this?
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
With TPG PSLink®
TPG PSLink is a world-leading middleware product that integrates
What is the quickest and easiest way to do this?
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
With TPG PSLink®
TPG PSLink is a world-leading middleware product that integrates
project and work management data with ERP systems.
What is the quickest and easiest way to do this?
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
Microsoft Project Server
Microsoft Project Client
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
Microsoft Project Server
Microsoft Project Client
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
Microsoft Project Server
Microsoft Project Client
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
… Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft TFS
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
ORACLE
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft TFS
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
ORACLE
PRIMAVERA
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft TFS
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project Server
ORACLE
PRIMAVERA
SQL, XML, http, Other ...
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft TFS
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project ServerTPG PSLink
ORACLE
PRIMAVERA
SQL, XML, http, Other ...
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Microsoft TFS
Microsoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project ServerTPG PSLink
ORACLE
PRIMAVERA
SQL, XML, http, Other ...
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Project Definition
WBS
Forecast
Actual Cost
Budgets
Orders
Risks
Issues
Cost Center
Activity Types
Planned Work
Invoices
Microsoft TFS
CBS
Structures
Actual WorkMicrosoft Dynamics
Microsoft SharePoint
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® : Using it with Microsoft Project Server
SAP Microsoft Project ServerTPG PSLink
ORACLE
PRIMAVERA
SQL, XML, http, Other ...
Microsoft Project Client
HR
PS
PM
CO
SD
CATS
…
Project Definition
WBS
Forecast
Actual Cost
Budgets
Orders
Risks
Issues
Cost Center
Activity Types
Planned Work
Invoices
Microsoft TFS
CBS
Structures
Actual WorkMicrosoft Dynamics
Microsoft SharePoint
TPG PSLink =
- Low implementation costs
- Using predefined templates
- For common use cases
Projects
Tasks
Resources
Assignments
Custom Fields
Timesheets
Lookup Tables
Project
Tasks
Resources
Assignments
Custom Fields
Timephased Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink Use Cases with SAP
Sync project and WBS data from PPM to SAPUse Case 1
Sync work and cost forecasts from PPM to SAPUse Case 2
Sync actual work from PPM to SAPUse Case 3
Sync actual work from SAP CATS to PPMUse Case 4
Sync actual costs from SAP to PPMUse Case 5
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Project Builder
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Project Builder
Yes
No
No
Yes
No
No
Yes
No
No
Yes
No
No
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Create project
Project Builder
PROJECT X TPG-499 01/01 04/30
Yes
No
No
Yes
No
No
Yes
No
No
Yes
No
No
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Project Builder
PROJECT X TPG-499 01/01 04/30
Copy SAP
project definition
TPG-499
TPR-499.1
TPG-499.2
TPG-499.3
TPG-499.4
Yes
No
No
Yes
No
No
Yes
No
No
Yes
No
No
Create project
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
Summary C TPG-499.3 02/01 03/31
Summary D TPG-499.4 03/01 04/30
TPG-499
TPR-499.1
TPG-499.2
TPG-499.3
TPG-499.4
Yes
No
No
Yes
No
No
Yes
No
No
Yes
No
No
Copy SAP
project definition
Create project
Create WBS
from summary
or marked tasks
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1A: Create Project and Sync PSP Structure in SAP
SAPTPG PSLink
NameSAP
WBS
WBS
NoJAN FEB MAR APR
PROJECT X
Summary A
Task 1
Task 2
Summary B
Task 3
Task 4
Summary C
Task 5
Task 6
Summary D
Task 7
Task 8
…
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
Summary C TPG-499.3 02/01 03/31
Summary D TPG-499.4 03/01 04/30
TPG-499
TPR-499.1
TPG-499.2
TPG-499.3
TPG-499.4
Yes
No
No
Yes
No
No
Yes
No
No
Yes
No
No Transfer the project structure from Microsoft PPM to SAP
Copy SAP
project definition
Create project
Create WBS
from summary
or marked tasks
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Create project
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30TPG-499
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Create project
Copy SAP
project definition
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
USA TPG-499.1 01/01 04/30
GER TPG-499.2 02/01 02/28
UK TPG-499.3 03/01 03/31
CH TPG-499.4 03/01 03/31
TPG-499
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Create project
Copy SAP
project definition
Create WBS
based on
task or
resource
criteria
(comp code)
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1B: Create the Project and the Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
USA TPG-499.1 01/01 04/30
GER TPG-499.2 02/01 02/28
UK TPG-499.3 03/01 03/31
CH TPG-499.4 03/01 03/31
TPG-499
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA Map and transfer the project structure based on the comp code
Create project
Copy SAP
project definition
Create WBS
based on
task or
resource
criteria
(comp code)
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
Create project
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
TPG-499
TPG-499.1
TPG-499.2
Create project
Copy SAP
project definition
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
Phase A TPG-499.1 01/01 03/31
USA TPG-499.1.1 01/01 03/31
GER TPG-499.1.2 02/01 02/28
Phase B TPG-499.2 02/01 04/30
USA TPG-499.2.1 03/01 04/30
GER TPG-499.2.2 02/01 02/28
UK TPG-499.2.3 03/01 03/31
CH TPG-499.2.4 03/01 03/31
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
TPG-499
TPG-499.1
TPG-499.2
Create WBS
from summary
or marked
tasks on level 1
&
comp code on
level 2
Create project
Copy SAP
project definition
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 1C: Create Project and Set Up Structure in SAP
SAPTPG PSLink
NameComp
Code
WBS
NoJAN FEB MAR APR
PROJECT X
Phase A
Task 1
Task 2
Task 3
Task 4
Task 5
Phase B
Task 6
Task 7
Task 8
Task 9
Task 10
…
Project Builder
PROJECT X TPG-499 01/01 04/30
Phase A TPG-499.1 01/01 03/31
USA TPG-499.1.1 01/01 03/31
GER TPG-499.1.2 02/01 02/28
Phase B TPG-499.2 02/01 04/30
USA TPG-499.2.1 03/01 04/30
GER TPG-499.2.2 02/01 02/28
UK TPG-499.2.3 03/01 03/31
CH TPG-499.2.4 03/01 03/31
USA
USA
GER
GER
USA
GER
UK
USA
CH
USA
TPG-499
TPG-499.1
TPG-499.2
Combined transfer of the WBS together with the comp code
Create WBS
from summary
or marked
tasks on level 1
&
comp code on
level 2
Create project
Copy SAP
project definition
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SZENARIO 2: Sync Planwerte zu Arbeit und Kosten von PPM zu SAP
SAPTPG PSLink
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink Use Cases with SAP
Sync project and WBS data from PPM to SAPUse Case 1
Sync work and cost forecasts from PPM to SAPUse Case 2
Sync actual work from PPM to SAPUse Case 3
Sync actual work from SAP CATS to PPMUse Case 4
Sync actual costs from SAP to PPMUse Case 5
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Transfer
forecast hours
per team
member and
per period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Transfer
forecast hours
per team
member and
per period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Transfer
forecast hours
per team
member and
per period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary A 50,000
Transfer
forecast hours
per team
member and
per period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary A 50,000
Transfer
forecast hours
per team
member and
per period
Transfer
forecast costs
per cost
element and
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary A 50,000
Primary Cost
WBS Element TPG-499.1
Cost Element 417000
Transfer
forecast hours
per team
member and
per period
Transfer
forecast costs
per cost
element and
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary A 50,000
Primary Cost
TEXT TOTAL PLAN COST
JAN
FEB 50,000
WBS Element TPG-499.1
Cost Element 417000
Transfer
forecast hours
per team
member and
per period
Transfer
forecast costs
per cost
element and
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP
SAPTPG PSLink
Activity Input
TEXT PLAN UNIT TOTAL
JAN 176 HUR 17.600
FEB 160 HUR 16.000
WBS Element TPG-499.1
Sender Cost Ctr TPG01
Sender AType CON
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
Center
Activity
TypeJAN FEB
Jim Work TPG01 CON 176
Task 1 176
Carina Work TPG01 CON 160
Task 2 160
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary A 50,000
Primary Cost
TEXT TOTAL PLAN COST
JAN
FEB 50,000
WBS Element TPG-499.1
Cost Element 417000
Period-related transfer of project elements to SAP elements
Transfer
forecast hours
per team
member and
per period
Transfer
forecast costs
per cost
element and
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink Use Cases with SAP
Sync project and WBS data from PPM to SAPUse Case 1
Sync work and cost forecasts from PPM to SAPUse Case 2
Sync actual work from PPM to SAPUse Case 3
Sync actual work from SAP CATS to PPMUse Case 4
Sync actual costs from SAP to PPMUse Case 5
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Set up project
and
WBS structure
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Carina´s Timesheet
Set up project
and
WBS structure
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Carina´s Timesheet
Set up project
and
WBS structure
Transfer
actual work to
CATS on WBS
elements per
resource
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Carina´s TimesheetCATS
User Name Carina
Employee Number 82502
Set up project
and
WBS structure
Transfer
actual work to
CATS on WBS
elements per
resource
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Carina´s TimesheetCATS
WBS Element 02/07 02/08 02/09 02/10 02/11
TPG-499.1 8 9 6 4
TPG-499.2 2 5 7
User Name Carina
Employee Number 82502
Set up project
and
WBS structure
Transfer
actual work to
CATS on WBS
elements per
resource
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 3: Sync Actual Work from PPM to SAP
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Summary B Yes TPR-499.2
Task 3 No Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Summary B TPG-499.2 02/01 03/31
...
Carina´s TimesheetCATS
WBS Element 02/07 02/08 02/09 02/10 02/11
TPG-499.1 8 9 6 4
TPG-499.2 2 5 7
User Name Carina
Employee Number 82502
Aggregate actual work in PPM onto WBS elements, transfer each resource to CATS
Set up project
and
WBS structure
Transfer
actual work to
CATS on WBS
elements per
resource
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink Use Cases with SAP
Sync project and WBS data from PPM to SAPUse Case 1
Sync work and cost forecasts from PPM to SAPUse Case 2
Sync actual work from PPM to SAPUse Case 3
Sync actual work from SAP CATS to PPMUse Case 4
Sync actual costs from SAP to PPMUse Case 5
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
Project Builder
Create project
structure 1:1
with all tasks
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Task 1 TPG-499.1.1 01/01 01/31
Task 2 TPG-499.1.2 02/01 02/28
Summary B TPG-499.2 02/01 03/31
Task 3 TPG-499.2.1 02/01 02/28
Create project
structure 1:1
with all tasks
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Task 1 TPG-499.1.1 01/01 01/31
Task 2 TPG-499.1.2 02/01 02/28
Summary B TPG-499.2 02/01 03/31
Task 3 TPG-499.2.1 02/01 02/28
CATS
WBS Element 02/07 02/08 02/09 02/10 02/10
TPG-499.1.2 8 9 6 4
TPG-499.2.1 2 5 7
User Name Carina
Employee Number 82502
Create project
structure 1:1
with all tasks
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Task 1 TPG-499.1.1 01/01 01/31
Task 2 TPG-499.1.2 02/01 02/28
Summary B TPG-499.2 02/01 03/31
Task 3 TPG-499.2.1 02/01 02/28
CATS
WBS Element 02/07 02/08 02/09 02/10 02/10
TPG-499.1.2 8 9 6 4
TPG-499.2.1 2 5 7
User Name Carina
Employee Number 82502
Create project
structure 1:1
with all tasks
Sync actual
work from CATS
to PPM
timesheet
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Task 1 TPG-499.1.1 01/01 01/31
Task 2 TPG-499.1.2 02/01 02/28
Summary B TPG-499.2 02/01 03/31
Task 3 TPG-499.2.1 02/01 02/28
Carina´s Timesheet CATS
WBS Element 02/07 02/08 02/09 02/10 02/10
TPG-499.1.2 8 9 6 4
TPG-499.2.1 2 5 7
User Name Carina
Employee Number 82502
Create project
structure 1:1
with all tasks
Sync actual
work from CATS
to PPM
timesheet
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 4: Sync Actual Work from CATS to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPR-499.1 Licenses
Task 1 Yes TPR-499.1.1 Jim
Task 2 Yes TPR-499.1.2 Carina
Summary B Yes TPR-499.2
Task 3 Yes TPR-499.2.1 Carina
NameMon
02/07
Tue
02/08
Wed
02/09
Thu
02/10
Fri
02/11
Summary A 8 9 6 4
Task 2 8 9 6 4
Summary B 2 5 7
Task 3 2 5 7
Project Builder
PROJECT X TPG-499 01/01 04/30
Summary A TPG-499.1 01/01 02/28
Task 1 TPG-499.1.1 01/01 01/31
Task 2 TPG-499.1.2 02/01 02/28
Summary B TPG-499.2 02/01 03/31
Task 3 TPG-499.2.1 02/01 02/28
Carina´s Timesheet CATS
WBS Element 02/07 02/08 02/09 02/10 02/10
TPG-499.1.2 8 9 6 4
TPG-499.2.1 2 5 7
User Name Carina
Employee Number 82502
Record actual work in CATS and transfer it 1:1 to PPM
Create project
structure 1:1
with all tasks
Sync actual
work from CATS
to PPM
timesheet
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink Use Cases with SAP
Sync project and WBS data from PPM to SAPUse Case 1
Sync work and cost forecasts from PPM to SAPUse Case 2
Sync actual work from PPM to SAPUse Case 3
Sync actual work from SAP CATS to PPMUse Case 4
Sync actual costs from SAP to PPMUse Case 5
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
INVOICEDate 02/18/2014
Licenses Server
20,000
Licenses Clients
25,000
Total 45,000
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
INVOICEDate 02/18/2014
Licenses Server
20,000
Licenses Clients
25,000
Total 45,000
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
CO Document
FIELD VALUE
WBS Element TPG-499.1
Cost Element 417000
CO Value 45,000
Document Number TPG-499.1
Posting Date 02/22/2014
Document Date 02/18/2014
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
INVOICEDate 02/18/2014
Licenses Server
20,000
Licenses Clients
25,000
Total 45,000
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
CO Document
FIELD VALUE
WBS Element TPG-499.1
Cost Element 417000
CO Value 45,000
Document Number TPG-499.1
Posting Date 02/22/2014
Document Date 02/18/2014
Sync cost
elements per
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
INVOICEDate 02/18/2014
Licenses Server
20,000
Licenses Clients
25,000
Total 45,000
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
CO Document
FIELD VALUE
WBS Element TPG-499.1
Cost Element 417000
CO Value 45,000
Document Number TPG-499.1
Posting Date 02/22/2014
Document Date 02/18/2014
Actual 45,000
Sync cost
elements per
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
SCENARIO 5: Sync Actual Costs from SAP to PPM
SAPTPG PSLink
INVOICEDate 02/18/2014
Licenses Server
20,000
Licenses Clients
25,000
Total 45,000
NameSAP
WBSWBS Nr Resources JAN FEB
PROJECT X TPG-499
Summary A Yes TPG-499.1 Licenses
Task 1 No Jim
Task 2 No Carina
Name TypeCost
ElementJAN FEB
Licenses Cost 417000 50,000
Summary APlanned 50,000
CO Document
FIELD VALUE
WBS Element TPG-499.1
Cost Element 417000
CO Value 45,000
Document Number TPG-499.1
Posting Date 02/22/2014
Document Date 02/18/2014
Actual 45,000
Allocate billing figures from SAP as actual costs to cost and PSP element in PPM
Sync cost
elements per
period
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® – Overview of Benefits
Integrate your PPM system with your ERP system to achieve better
data quality along with simpler PM processes.1
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® – Overview of Benefits
Integrate your PPM system with your ERP system to achieve better
data quality along with simpler PM processes.
Ensure data consistency across different systems and eliminate the
need to duplicate data administration.
1
2
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® – Overview of Benefits
Integrate your PPM system with your ERP system to achieve better
data quality along with simpler PM processes.
Ensure data consistency across different systems and eliminate the
need to duplicate data administration.
Benefit from rapid and cost-effective integration of your systems
with the assurance that you can extend it whenever and however
you require.
1
2
3
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG PSLink® – The security of certification
SAP certifiedsince 2009
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
More on TPG PSLink® – Integration of Financial & Project Data
Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training
TPG The Project Group – International Subsidiaries
TPG Germany
Destouchesstr. 68
D-80796 Munich
Tel: +49 (89) 615593-30
TPG United Kingdom
3rd Floor, 14 Hanover Street,
Hanover Square, London, W1S 1YH
Great Britain
Tel: +44 8443350368
TPG Africa
Route 21, Corporate Park
c/o Nellmapius & Goedehoop Drive
Irene | South Africa
Tel: +27 12 345 3518
TPG Austria, CEE
Mooslackengasse 17
A-1190 Vienna
Tel: +43 (1) 23060 3145
TPG Switzerland
Christoph Merian-Ring 11
4153 Reinach BL
Tel.: +41 (61) 711 33 11
TPG America – Westcoast
1 Sansome Street, 35th Floor
PMB# 115, San Francisco, CA 94104
USA
Tel: +1 800 804 0646
TPG America – Canada
1200 McGill College Ave.,
Suite 1100, Montreal, QB H3B 4G7
Canada
Tel: +1 514 418 2537
Subsidiary America
2500 York Road, Suite 115
Jamison, PA 18929
USA
Tel: +1 800 804 0646
Subsidiary Spain
c/ Santa Maria, 26, baixos
17820 Banyoles, Girona,
Spain
Tel.: +34 872 208 003