TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

87
Consulting | Solutions | Products | Training Integration of Financial & Project Data TPG PSLink ® Clear benefits in the areas of - Management - Controlling - Project Management

description

The integration of the Enterprise Project and Portfolio Management (PPM) with the ERP system eliminates need for double data entry and data admin in multiple systems. The consequence is better data quality. This is the basis for reliable and speeded decision making by management, financial controllers and project managers. Also project management processes are streamlined. These are clear competitive advantages for each enterprise using an integrated environment. TPG The Project Group is a world-leading provider for the integration of systems like Microsoft Project Server, SharePoint, Oracle Primavera, SAP, Microsoft Dynamics AX and other ERP systems. The integration of these systems allows the bidirectional exchange of structure, resource, financial and other project data. TPG PSLink® is the flagship product of TPG The Project Group. For over 15 years it has been the key for very rapid realizations of many individual customer solutions. The seamless exchange of data between systems for project planning, controlling, collaboration and document management is reliably possible due to this long-time proven integration product.

Transcript of TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Page 1: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | Training

Integration of Financial & Project Data

TPG PSLink®

Clear benefits in the areas of

- Management

- Controlling

- Project Management

Page 2: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

Streamlined project management processes

The Benefits of PM System Integration

Page 3: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

Streamlined project management processes

Data consistency in all the systems involved

The Benefits of PM System Integration

Page 4: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

Streamlined project management processes

Data consistency in all the systems involved

Eliminates need for data admin in multiple systems

The Benefits of PM System Integration

Page 5: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

Streamlined project management processes

Data consistency in all the systems involved

Eliminates need for data admin in multiple systems

Better data quality as a basis for decision making for project

managers, financial controllers and management

The Benefits of PM System Integration

Page 6: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

Streamlined project management processes

Data consistency in all the systems involved

Eliminates need for data admin in multiple systems

Better data quality as a basis for decision making for project

managers, financial controllers and management

Integration of project planning, financial controlling,

collaboration and document management

The Benefits of PM System Integration

Page 7: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

What is the quickest and easiest way to do this?

Page 8: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

With TPG PSLink®

What is the quickest and easiest way to do this?

Page 9: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

With TPG PSLink®

TPG PSLink is a world-leading middleware product that integrates

What is the quickest and easiest way to do this?

Page 10: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

With TPG PSLink®

TPG PSLink is a world-leading middleware product that integrates

project and work management data with ERP systems.

What is the quickest and easiest way to do this?

Page 11: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

Microsoft Project Server

Microsoft Project Client

Page 12: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

Microsoft Project Server

Microsoft Project Client

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Page 13: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

Microsoft Project Server

Microsoft Project Client

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 14: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

… Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 15: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 16: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 17: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft TFS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 18: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

ORACLE

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft TFS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 19: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

ORACLE

PRIMAVERA

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft TFS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 20: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project Server

ORACLE

PRIMAVERA

SQL, XML, http, Other ...

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft TFS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 21: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project ServerTPG PSLink

ORACLE

PRIMAVERA

SQL, XML, http, Other ...

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Microsoft TFS

Microsoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 22: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project ServerTPG PSLink

ORACLE

PRIMAVERA

SQL, XML, http, Other ...

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Project Definition

WBS

Forecast

Actual Cost

Budgets

Orders

Risks

Issues

Cost Center

Activity Types

Planned Work

Invoices

Microsoft TFS

CBS

Structures

Actual WorkMicrosoft Dynamics

Microsoft SharePoint

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 23: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® : Using it with Microsoft Project Server

SAP Microsoft Project ServerTPG PSLink

ORACLE

PRIMAVERA

SQL, XML, http, Other ...

Microsoft Project Client

HR

PS

PM

CO

SD

CATS

Project Definition

WBS

Forecast

Actual Cost

Budgets

Orders

Risks

Issues

Cost Center

Activity Types

Planned Work

Invoices

Microsoft TFS

CBS

Structures

Actual WorkMicrosoft Dynamics

Microsoft SharePoint

TPG PSLink =

- Low implementation costs

- Using predefined templates

- For common use cases

Projects

Tasks

Resources

Assignments

Custom Fields

Timesheets

Lookup Tables

Project

Tasks

Resources

Assignments

Custom Fields

Timephased Data

Page 24: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink Use Cases with SAP

Sync project and WBS data from PPM to SAPUse Case 1

Sync work and cost forecasts from PPM to SAPUse Case 2

Sync actual work from PPM to SAPUse Case 3

Sync actual work from SAP CATS to PPMUse Case 4

Sync actual costs from SAP to PPMUse Case 5

Page 25: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

Page 26: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Project Builder

Page 27: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Project Builder

Yes

No

No

Yes

No

No

Yes

No

No

Yes

No

No

Page 28: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Create project

Project Builder

PROJECT X TPG-499 01/01 04/30

Yes

No

No

Yes

No

No

Yes

No

No

Yes

No

No

Page 29: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Project Builder

PROJECT X TPG-499 01/01 04/30

Copy SAP

project definition

TPG-499

TPR-499.1

TPG-499.2

TPG-499.3

TPG-499.4

Yes

No

No

Yes

No

No

Yes

No

No

Yes

No

No

Create project

Page 30: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

Summary C TPG-499.3 02/01 03/31

Summary D TPG-499.4 03/01 04/30

TPG-499

TPR-499.1

TPG-499.2

TPG-499.3

TPG-499.4

Yes

No

No

Yes

No

No

Yes

No

No

Yes

No

No

Copy SAP

project definition

Create project

Create WBS

from summary

or marked tasks

Page 31: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1A: Create Project and Sync PSP Structure in SAP

SAPTPG PSLink

NameSAP

WBS

WBS

NoJAN FEB MAR APR

PROJECT X

Summary A

Task 1

Task 2

Summary B

Task 3

Task 4

Summary C

Task 5

Task 6

Summary D

Task 7

Task 8

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

Summary C TPG-499.3 02/01 03/31

Summary D TPG-499.4 03/01 04/30

TPG-499

TPR-499.1

TPG-499.2

TPG-499.3

TPG-499.4

Yes

No

No

Yes

No

No

Yes

No

No

Yes

No

No Transfer the project structure from Microsoft PPM to SAP

Copy SAP

project definition

Create project

Create WBS

from summary

or marked tasks

Page 32: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

Page 33: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

Page 34: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Page 35: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Create project

Page 36: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30TPG-499

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Create project

Copy SAP

project definition

Page 37: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

USA TPG-499.1 01/01 04/30

GER TPG-499.2 02/01 02/28

UK TPG-499.3 03/01 03/31

CH TPG-499.4 03/01 03/31

TPG-499

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Create project

Copy SAP

project definition

Create WBS

based on

task or

resource

criteria

(comp code)

Page 38: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1B: Create the Project and the Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

USA TPG-499.1 01/01 04/30

GER TPG-499.2 02/01 02/28

UK TPG-499.3 03/01 03/31

CH TPG-499.4 03/01 03/31

TPG-499

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA Map and transfer the project structure based on the comp code

Create project

Copy SAP

project definition

Create WBS

based on

task or

resource

criteria

(comp code)

Page 39: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

Page 40: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

Page 41: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Page 42: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

Create project

Page 43: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

TPG-499

TPG-499.1

TPG-499.2

Create project

Copy SAP

project definition

Page 44: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

Phase A TPG-499.1 01/01 03/31

USA TPG-499.1.1 01/01 03/31

GER TPG-499.1.2 02/01 02/28

Phase B TPG-499.2 02/01 04/30

USA TPG-499.2.1 03/01 04/30

GER TPG-499.2.2 02/01 02/28

UK TPG-499.2.3 03/01 03/31

CH TPG-499.2.4 03/01 03/31

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

TPG-499

TPG-499.1

TPG-499.2

Create WBS

from summary

or marked

tasks on level 1

&

comp code on

level 2

Create project

Copy SAP

project definition

Page 45: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 1C: Create Project and Set Up Structure in SAP

SAPTPG PSLink

NameComp

Code

WBS

NoJAN FEB MAR APR

PROJECT X

Phase A

Task 1

Task 2

Task 3

Task 4

Task 5

Phase B

Task 6

Task 7

Task 8

Task 9

Task 10

Project Builder

PROJECT X TPG-499 01/01 04/30

Phase A TPG-499.1 01/01 03/31

USA TPG-499.1.1 01/01 03/31

GER TPG-499.1.2 02/01 02/28

Phase B TPG-499.2 02/01 04/30

USA TPG-499.2.1 03/01 04/30

GER TPG-499.2.2 02/01 02/28

UK TPG-499.2.3 03/01 03/31

CH TPG-499.2.4 03/01 03/31

USA

USA

GER

GER

USA

GER

UK

USA

CH

USA

TPG-499

TPG-499.1

TPG-499.2

Combined transfer of the WBS together with the comp code

Create WBS

from summary

or marked

tasks on level 1

&

comp code on

level 2

Create project

Copy SAP

project definition

Page 46: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SZENARIO 2: Sync Planwerte zu Arbeit und Kosten von PPM zu SAP

SAPTPG PSLink

Page 47: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink Use Cases with SAP

Sync project and WBS data from PPM to SAPUse Case 1

Sync work and cost forecasts from PPM to SAPUse Case 2

Sync actual work from PPM to SAPUse Case 3

Sync actual work from SAP CATS to PPMUse Case 4

Sync actual costs from SAP to PPMUse Case 5

Page 48: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Page 49: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Transfer

forecast hours

per team

member and

per period

Page 50: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Transfer

forecast hours

per team

member and

per period

Page 51: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Transfer

forecast hours

per team

member and

per period

Page 52: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary A 50,000

Transfer

forecast hours

per team

member and

per period

Page 53: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary A 50,000

Transfer

forecast hours

per team

member and

per period

Transfer

forecast costs

per cost

element and

period

Page 54: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary A 50,000

Primary Cost

WBS Element TPG-499.1

Cost Element 417000

Transfer

forecast hours

per team

member and

per period

Transfer

forecast costs

per cost

element and

period

Page 55: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary A 50,000

Primary Cost

TEXT TOTAL PLAN COST

JAN

FEB 50,000

WBS Element TPG-499.1

Cost Element 417000

Transfer

forecast hours

per team

member and

per period

Transfer

forecast costs

per cost

element and

period

Page 56: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 2: Sync Work and Cost Forecasts from PPM to SAP

SAPTPG PSLink

Activity Input

TEXT PLAN UNIT TOTAL

JAN 176 HUR 17.600

FEB 160 HUR 16.000

WBS Element TPG-499.1

Sender Cost Ctr TPG01

Sender AType CON

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

Center

Activity

TypeJAN FEB

Jim Work TPG01 CON 176

Task 1 176

Carina Work TPG01 CON 160

Task 2 160

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary A 50,000

Primary Cost

TEXT TOTAL PLAN COST

JAN

FEB 50,000

WBS Element TPG-499.1

Cost Element 417000

Period-related transfer of project elements to SAP elements

Transfer

forecast hours

per team

member and

per period

Transfer

forecast costs

per cost

element and

period

Page 57: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink Use Cases with SAP

Sync project and WBS data from PPM to SAPUse Case 1

Sync work and cost forecasts from PPM to SAPUse Case 2

Sync actual work from PPM to SAPUse Case 3

Sync actual work from SAP CATS to PPMUse Case 4

Sync actual costs from SAP to PPMUse Case 5

Page 58: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

Page 59: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Set up project

and

WBS structure

Page 60: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Carina´s Timesheet

Set up project

and

WBS structure

Page 61: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Carina´s Timesheet

Set up project

and

WBS structure

Transfer

actual work to

CATS on WBS

elements per

resource

Page 62: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Carina´s TimesheetCATS

User Name Carina

Employee Number 82502

Set up project

and

WBS structure

Transfer

actual work to

CATS on WBS

elements per

resource

Page 63: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Carina´s TimesheetCATS

WBS Element 02/07 02/08 02/09 02/10 02/11

TPG-499.1 8 9 6 4

TPG-499.2 2 5 7

User Name Carina

Employee Number 82502

Set up project

and

WBS structure

Transfer

actual work to

CATS on WBS

elements per

resource

Page 64: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 3: Sync Actual Work from PPM to SAP

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Summary B Yes TPR-499.2

Task 3 No Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Summary B TPG-499.2 02/01 03/31

...

Carina´s TimesheetCATS

WBS Element 02/07 02/08 02/09 02/10 02/11

TPG-499.1 8 9 6 4

TPG-499.2 2 5 7

User Name Carina

Employee Number 82502

Aggregate actual work in PPM onto WBS elements, transfer each resource to CATS

Set up project

and

WBS structure

Transfer

actual work to

CATS on WBS

elements per

resource

Page 65: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink Use Cases with SAP

Sync project and WBS data from PPM to SAPUse Case 1

Sync work and cost forecasts from PPM to SAPUse Case 2

Sync actual work from PPM to SAPUse Case 3

Sync actual work from SAP CATS to PPMUse Case 4

Sync actual costs from SAP to PPMUse Case 5

Page 66: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

Page 67: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

Project Builder

Create project

structure 1:1

with all tasks

Page 68: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Task 1 TPG-499.1.1 01/01 01/31

Task 2 TPG-499.1.2 02/01 02/28

Summary B TPG-499.2 02/01 03/31

Task 3 TPG-499.2.1 02/01 02/28

Create project

structure 1:1

with all tasks

Page 69: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Task 1 TPG-499.1.1 01/01 01/31

Task 2 TPG-499.1.2 02/01 02/28

Summary B TPG-499.2 02/01 03/31

Task 3 TPG-499.2.1 02/01 02/28

CATS

WBS Element 02/07 02/08 02/09 02/10 02/10

TPG-499.1.2 8 9 6 4

TPG-499.2.1 2 5 7

User Name Carina

Employee Number 82502

Create project

structure 1:1

with all tasks

Page 70: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Task 1 TPG-499.1.1 01/01 01/31

Task 2 TPG-499.1.2 02/01 02/28

Summary B TPG-499.2 02/01 03/31

Task 3 TPG-499.2.1 02/01 02/28

CATS

WBS Element 02/07 02/08 02/09 02/10 02/10

TPG-499.1.2 8 9 6 4

TPG-499.2.1 2 5 7

User Name Carina

Employee Number 82502

Create project

structure 1:1

with all tasks

Sync actual

work from CATS

to PPM

timesheet

Page 71: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Task 1 TPG-499.1.1 01/01 01/31

Task 2 TPG-499.1.2 02/01 02/28

Summary B TPG-499.2 02/01 03/31

Task 3 TPG-499.2.1 02/01 02/28

Carina´s Timesheet CATS

WBS Element 02/07 02/08 02/09 02/10 02/10

TPG-499.1.2 8 9 6 4

TPG-499.2.1 2 5 7

User Name Carina

Employee Number 82502

Create project

structure 1:1

with all tasks

Sync actual

work from CATS

to PPM

timesheet

Page 72: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 4: Sync Actual Work from CATS to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPR-499.1 Licenses

Task 1 Yes TPR-499.1.1 Jim

Task 2 Yes TPR-499.1.2 Carina

Summary B Yes TPR-499.2

Task 3 Yes TPR-499.2.1 Carina

NameMon

02/07

Tue

02/08

Wed

02/09

Thu

02/10

Fri

02/11

Summary A 8 9 6 4

Task 2 8 9 6 4

Summary B 2 5 7

Task 3 2 5 7

Project Builder

PROJECT X TPG-499 01/01 04/30

Summary A TPG-499.1 01/01 02/28

Task 1 TPG-499.1.1 01/01 01/31

Task 2 TPG-499.1.2 02/01 02/28

Summary B TPG-499.2 02/01 03/31

Task 3 TPG-499.2.1 02/01 02/28

Carina´s Timesheet CATS

WBS Element 02/07 02/08 02/09 02/10 02/10

TPG-499.1.2 8 9 6 4

TPG-499.2.1 2 5 7

User Name Carina

Employee Number 82502

Record actual work in CATS and transfer it 1:1 to PPM

Create project

structure 1:1

with all tasks

Sync actual

work from CATS

to PPM

timesheet

Page 73: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink Use Cases with SAP

Sync project and WBS data from PPM to SAPUse Case 1

Sync work and cost forecasts from PPM to SAPUse Case 2

Sync actual work from PPM to SAPUse Case 3

Sync actual work from SAP CATS to PPMUse Case 4

Sync actual costs from SAP to PPMUse Case 5

Page 74: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

Page 75: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Page 76: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

Page 77: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

INVOICEDate 02/18/2014

Licenses Server

20,000

Licenses Clients

25,000

Total 45,000

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

Page 78: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

INVOICEDate 02/18/2014

Licenses Server

20,000

Licenses Clients

25,000

Total 45,000

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

CO Document

FIELD VALUE

WBS Element TPG-499.1

Cost Element 417000

CO Value 45,000

Document Number TPG-499.1

Posting Date 02/22/2014

Document Date 02/18/2014

Page 79: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

INVOICEDate 02/18/2014

Licenses Server

20,000

Licenses Clients

25,000

Total 45,000

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

CO Document

FIELD VALUE

WBS Element TPG-499.1

Cost Element 417000

CO Value 45,000

Document Number TPG-499.1

Posting Date 02/22/2014

Document Date 02/18/2014

Sync cost

elements per

period

Page 80: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

INVOICEDate 02/18/2014

Licenses Server

20,000

Licenses Clients

25,000

Total 45,000

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

CO Document

FIELD VALUE

WBS Element TPG-499.1

Cost Element 417000

CO Value 45,000

Document Number TPG-499.1

Posting Date 02/22/2014

Document Date 02/18/2014

Actual 45,000

Sync cost

elements per

period

Page 81: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

SCENARIO 5: Sync Actual Costs from SAP to PPM

SAPTPG PSLink

INVOICEDate 02/18/2014

Licenses Server

20,000

Licenses Clients

25,000

Total 45,000

NameSAP

WBSWBS Nr Resources JAN FEB

PROJECT X TPG-499

Summary A Yes TPG-499.1 Licenses

Task 1 No Jim

Task 2 No Carina

Name TypeCost

ElementJAN FEB

Licenses Cost 417000 50,000

Summary APlanned 50,000

CO Document

FIELD VALUE

WBS Element TPG-499.1

Cost Element 417000

CO Value 45,000

Document Number TPG-499.1

Posting Date 02/22/2014

Document Date 02/18/2014

Actual 45,000

Allocate billing figures from SAP as actual costs to cost and PSP element in PPM

Sync cost

elements per

period

Page 82: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® – Overview of Benefits

Integrate your PPM system with your ERP system to achieve better

data quality along with simpler PM processes.1

Page 83: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® – Overview of Benefits

Integrate your PPM system with your ERP system to achieve better

data quality along with simpler PM processes.

Ensure data consistency across different systems and eliminate the

need to duplicate data administration.

1

2

Page 84: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® – Overview of Benefits

Integrate your PPM system with your ERP system to achieve better

data quality along with simpler PM processes.

Ensure data consistency across different systems and eliminate the

need to duplicate data administration.

Benefit from rapid and cost-effective integration of your systems

with the assurance that you can extend it whenever and however

you require.

1

2

3

Page 85: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG PSLink® – The security of certification

SAP certifiedsince 2009

Page 86: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

More on TPG PSLink® – Integration of Financial & Project Data

Page 87: TPG PSLink - Integration of Financial and Project Data (Integration of Microsoft with SAP)

Consulting | Solutions | Products | TrainingConsulting | Solutions | Products | Training

TPG The Project Group – International Subsidiaries

TPG Germany

Destouchesstr. 68

D-80796 Munich

Tel: +49 (89) 615593-30

[email protected]

TPG United Kingdom

3rd Floor, 14 Hanover Street,

Hanover Square, London, W1S 1YH

Great Britain

Tel: +44 8443350368

[email protected]

TPG Africa

Route 21, Corporate Park

c/o Nellmapius & Goedehoop Drive

Irene | South Africa

Tel: +27 12 345 3518

[email protected]

TPG Austria, CEE

Mooslackengasse 17

A-1190 Vienna

Tel: +43 (1) 23060 3145

[email protected]

TPG Switzerland

Christoph Merian-Ring 11

4153 Reinach BL

Tel.: +41 (61) 711 33 11

[email protected]

TPG America – Westcoast

1 Sansome Street, 35th Floor

PMB# 115, San Francisco, CA 94104

USA

Tel: +1 800 804 0646

[email protected]

TPG America – Canada

1200 McGill College Ave.,

Suite 1100, Montreal, QB H3B 4G7

Canada

Tel: +1 514 418 2537

[email protected]

Subsidiary America

2500 York Road, Suite 115

Jamison, PA 18929

USA

Tel: +1 800 804 0646

[email protected]

Subsidiary Spain

c/ Santa Maria, 26, baixos

17820 Banyoles, Girona,

Spain

Tel.: +34 872 208 003

[email protected]