SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator...

16
SWEDE - April 26 th , 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Austin Energy Fusing and Fault Indicator Fault Indicator Applications Applications

Transcript of SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator...

Page 1: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

SWEDE - April 26th, 2011 - BastropTommy Nylec

Austin Energy Fusing and Fault Austin Energy Fusing and Fault Indicator ApplicationsIndicator Applications

Austin Energy Fusing and Fault Austin Energy Fusing and Fault Indicator ApplicationsIndicator Applications

Page 2: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

2 2

OverviewOverviewOverviewOverview

Introduction to Austin Energy Purpose of Coordination Concern

Unique Situations Engineering and Operational Solutions

Future Work and Conclusions

Page 3: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

3 3

Austin Energy StatisticsAustin Energy StatisticsAustin Energy StatisticsAustin Energy Statistics

>400,000 Customers >2,800 MW Generation ># mi Transmission 56 Distribution

Substations > 10,000 miles of

Distribution >1,600 Employees Serve 437 square miles

including Austin city limits and neighboring areas

Started in 1887

Page 4: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

4 4

Austin Energy ReliabilityAustin Energy ReliabilityAustin Energy ReliabilityAustin Energy Reliability

SAIFI = .63 SAIDI = 43.97 CAIDI = 69.86 Challenge ourselves

with high goals for reliability indices

Consistently in the top performance in the country

Page 5: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

5 5

Coordination Scheme RevisitedCoordination Scheme RevisitedCoordination Scheme RevisitedCoordination Scheme Revisited

Need to be simple to interpret for field personnel Must allow for ease of use in design environment Application must hold in > 80% cases Point of coordination determined by maximum

available fault current 20% Separation between Total Clear and

Minimum Melt curves of devices

Page 6: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

6 6

Austin Energy Fault Current LevelsAustin Energy Fault Current LevelsAustin Energy Fault Current LevelsAustin Energy Fault Current Levels

Item of Concern Infinite Bus Calculations for

Larger Transformers= 14.5 kA Short Feeders High density of substations System is primarily 12.5 kV Transmission Impedance on

larger transformers creates approximately 10 kA

Majority of fuses are at > 2kA Typical Unit Installation

results in Fault Current < 8.5 kA at Bus

Page 7: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

7 7

Warehouse InventoryWarehouse InventoryWarehouse InventoryWarehouse Inventory

Limited space in warehouse and trucks Minimize variety of fuses Standardize applications

Reduction of inventory

Page 8: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

8 8

Substation CoordinationSubstation CoordinationSubstation CoordinationSubstation Coordination

Most relays set at 360 A Ground Pickup Eases coordination with downstream devices Provides adequate system protection

Considerations Some substations do not have this setting Conflicts with some fusing scenarios

Page 9: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

9 9

Unique ScenariosUnique ScenariosUnique ScenariosUnique Scenarios

Slugging Required due to

presence of extra fuse

Fault Level Cheat Sheets

Rules of Thumb don’t apply Skip fuse size between

devices

Page 10: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

10 10

SolutionSolutionSolutionSolution

Keep same fuse ampacity ratings

Limit number of fuses with same ampacity but different speeds Allow duplicates in most

common sizes

Austin Energy Rule of Thumb Must skip 2 fuse sizes between

devices

Page 11: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

11 11

Feeder Coordination StudiesFeeder Coordination StudiesFeeder Coordination StudiesFeeder Coordination Studies

Studies performed on 5 year rotational basis Creates opportunity to revisit coordination

scheme Allows adjustment of existing fuses to new

scheme Limited inventory restricts solutions to

encountered problems

Page 12: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

12 12

Fault Indicator ApplicationFault Indicator ApplicationFault Indicator ApplicationFault Indicator Application

Fault must pass through equipment

Placed accordingly Follow Cooper

Application guide

Page 13: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

13 13

Austin Energy StandardAustin Energy StandardAustin Energy StandardAustin Energy Standard

Traditional Placement: Located at

transformer

Austin Energy Additional Requirements: Additional F.I.’s

located at risers and switchgears

Page 14: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

14 14

Installation MethodsInstallation MethodsInstallation MethodsInstallation Methods

Concentric Neutral Identified

misapplication Changes made to

standard to correct In accordance with

industry standards

Page 15: SWEDE - April 26 th, 2011 - Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.

15 15

Fault Indicator ConclusionsFault Indicator ConclusionsFault Indicator ConclusionsFault Indicator Conclusions

Provide additional visual cues of fault locations

Decrease service restoration time Reduce equipment exposure during

restoration practices Economic Impact