SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

96
SeeGate2 & SeeTrain Technical Training – October 2009 Version 2

Transcript of SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Page 1: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 & SeeTrain

Technical Training – October 2009

Version 2

Page 2: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Contents

1. Company overview……………….…22. Sample installations………………..213. SeeGate2 architecture……………..284. SeeGate2 Gantry……........………..315. SeeGate2 Hardware…….………….366. Middleware…………………………..507. SeeGate2 GUI....……………………568. Utilities………………………………. 649. SeeTrain…………………………… 79

1

Page 3: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

1.Company Overview

Hi-Tech Solutions

2

Page 4: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Hi-Tech Solutions

Established 1992

Leading developer and supplier of Optical Character Recognition (OCR)

LPR and CCR applications in security, automation and management for ports and traffic markets.

Successful deployment in over 30 countries

Established partnerships with top-tier global companies

3

Page 5: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Proven Supplier of OCR Solutions Worldwide

4

Page 6: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Comprehensive Implementation Capabilities

Prime contractor experience MTC, USA Rotterdam, Netherlands

Large scale project experienceVendor supply integrationDatabase management capabilityBack office capabilities in

real time monitoring of

cameras

5

Page 7: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Technology Offerings

CCR

Container Code Recognition

LPR

License Plate Recognition

OCROCR Systems Capture Images, Identify Container and Plate Numbers

6

Page 8: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Proven State of the Art LPR Solutions

Low and High-Speed LPR Up to 200 km/hour Flexible & adaptable Surveillance, access control,

security, traffic management,

toll roads, parking applications

7

Page 9: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Broad LPR Deployment Base

Sample Installations:

Electronic Toll Highways (South Bay Hwy, CA) Athens Summer Olympic Games (SAIC) Airports (Security, Parking) Government Facilities Border Crossing Systems Traffic Monitoring

8

Page 10: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

LPR Proven Performance Excellence

98% Accuracy GuaranteeDay/night to 160 km/hourHardware reliabilityColor and B&W

9

Page 11: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

CCR Solutions

Truck Gate OCR (plate, container, chassis, DI, IMO labels) Pedestal LPR units, matched with Portals (hundreds of lanes) Ship-to-Shore Crane OCR (Over 70 systems installed) Rail OCR (9 systems installed) Other systems under development

BENT TerminalPort of Oakland

STS TerminalPort of Seattle

Trapac TerminalsPort of L.A.

10

Page 12: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Key Customers

US DHS, TSA - ACTA (Alameda Corridor Transportation Authority)

US DoE (Department of Energy) – LPR/CCR in RPM Systems Oak Ridge National Labs (CA, USA) Ben Gurion Airport (Tel-Aviv, Israel) IBM S3 (NY, USA) MTC (Marine Terminal Corp) - US West Coast Maersk/APM Terminals (CA, USA) ECT, EuroMAX (Port of Rotterdam, Netherlands) Port of Southampton, UK MGM (Ports of Marseille & Foss, France) Busan New Port (Korea) South Bay Highway SR125 (San Diego, CA USA)

11

Page 13: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Project Examples

LPR Security Traffic Management

Container Solutions Border Crossings Intermodal, SeeRail,

12

Page 14: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

IBM S3 Smart Surveillance System

IBM Comprehensive Site

Security Surveillance System Tracks & monitors continuously

from point of entry

through exit Integrated HTS’ LPR,

biometrics/facial

recognition, behavior

analysis, badge reading,

people tracking, etc.

NYC, NY13

Page 15: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Security Solutions

14

Page 16: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Security Solutions

15

Page 17: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Airport Perimeter Gate Security Ben Gurion Airport

Screens all entering vehicles

Real-time cross-check with security database

Reduces checkpoint

cycle time

Ben Gurion Airport, Israel16

Page 18: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

High-Speed Open-Road Tolling

SR125 San Diego CA17

Page 19: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeWay Multiple Lanes

 

Nancy, France 18

Page 20: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Port Automation

MTC Gate System, USA

19

Page 21: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

North American Presence

HTS has a strong US Presence with a team of experienced professionals in:

Marketing Project management Maintenance/support

HTS has offices located on both the East and West coasts of the US

20

Page 22: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

2. SeeGate2 –

Sample Installations

21

Page 23: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Second Line for Defense for US Department of Energy

Busan Korea – 4 lanes22

Page 24: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Second Line for Defense for US Department of Energy

Southampton, UK – 3 lanes23

Page 25: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Kramer, Rotterdam

2 phases – 6+8 lanes24

Page 26: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Second Line for Defense for US Department of Energy

Algeciras, Spain – 2 lanes25

Page 27: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Euromax, Rotterdam

Euromax– 4 lanes26

Page 28: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Rotterdam projects film

Video Clip

27

Page 29: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

3. SeeGate2 Architecture

28

Page 30: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 Basic LPR & CCR

Main window

SeeGate2Viewer

LPR

CCR

29

Page 31: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 Configurations

CCRLPRRLPRChassisDamageIMOComments

1v

2vv

3vvv

4vv

5vvv

6vvvv

7vv

8vvv

9vvvv

10vvv

11vvvv

12vvvvv

13vvvAdditional Rear LPR

14vvvvAdditional Rear LPR

15vvvvvAdditional Rear LPR

30

Page 32: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

4. SeeGate2 Gantry

31

Page 33: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 Gantry elements

Side Illum

IR sensor

Side camera

LPR cameras

Top/Rear illumination (s) Top cameraRear camera (not seen)

3 loop detectors

32

Page 34: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Gantry – back view

33

Page 35: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Multiple lanes

34

Page 36: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 Loops

35Above diagram is typical; site specific diagrams will be delivered

Page 37: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

5. Hardware

36

Page 38: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

CCR Camera

Elbex color ½” autoiris

Number of cameras @ lane: Side: 2-4 Top: 1 Rear: 1

Various enclosures

37

Page 39: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Video distributor

Distributes video sync from camera to Illumination units

38

Page 40: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Video distributor

39

Page 41: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Sync Generator

Special sync unit –between pairs of cameras

3 units per std system

40

Page 42: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Sync Generator

41

Page 43: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

IO control (USB, TBL)Pin

#WirePin

#Wire

1Loop 1 (input)13Truck LPR Left Top Illum. LSB

2Loop 2 (input)14Truck LPR Left Top Illum. MSB

3Loop 3 (input)15Truck LPR Right Top Illum. LSB

4IR sensor 1 (input)16Truck LPR Right Top Illum. MSB

5IR sensor 2 (input)17Container Left Illuminators LSB

6-18Container Left Illuminators MSB

7-19Container Right Illuminators LSB

8-20Container Right Illuminators MSB

9Truck LPR Left Bottom Illum. LSB21Container Top Illum. (2 units) LSB

10Truck LPR Left Bottom Illum. MSB22Container Top Illum. (2 units) MSB

11Truck LPR Right Bottom Illum. LSB23-

12Truck LPR Right Bottom Illum. MSB24Busy signal

42

Page 44: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Frame Grabber

43

•Inputs: 4 VIDEO inputs

•One or more boards per PC

•Compatible with standard PAL or NTSC cameras

•Board is PCI bus mastering agents that directly store the acquired images into the

PC physical memory without CPU involvement

Page 45: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

IR sensors

44

Page 46: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Loop detectors

45

Page 47: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Schematics: I/O

46

Page 48: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Schematics: PC

47

Page 49: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

LPR Camera

48

The SeeCarHead unit is an optimized and compact camera illumination unit integrated into the LPRsystem. This unit is fully supported by the application and utilizes its additional features to maximizethe results. The application controls the level of illumination (4 levels). The image capture issynchronized with the illumination to achieve higher signal to noise ratios.

Page 50: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Schematics: LPR

49

Page 51: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

6. Middleware

50

Page 52: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Hierarchy of computers

51

Page 53: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeTerminal GUI

52

Page 54: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Station status

53

Page 55: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Video clips

Left Right Top

54

Page 56: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Viewer – Movie clips

55

Page 57: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

7. SeeGate2 GUI

56

Page 58: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Main Window

57

Page 59: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGate2 Live View

58

Page 60: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Options – General settings

59

Page 61: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Options - Cont settings

60

Page 62: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Options – Image settings

61

Page 63: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Options - AVI settings

62

Page 64: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Options – Communication settings

63

Page 65: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

8. Utilities

64

Page 66: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGateViewer – Results

65

Page 67: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGateViewer – Results

66

Page 68: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeGateViewer – Query

67

Page 69: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeCleaner

68

Page 70: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeService

69

Page 71: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeMonitor – status lights

70

Page 72: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeMonitor – Graphs

71

Page 73: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeMonitor

72

Page 74: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Mail notification

73

Page 75: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeCal – Calibration tool

Video Panel : Contains live video pictures, with zoom option

Control Panel : Allows the control of illumination pins, switching camera and rotating

the displayed video.

Diagram Panel : Graphically displays image statistical information

74

Page 76: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

 Displays live video image.

 Zoom in:  Click anywhere in the video image, drag the mouse and release it to form a rectangle.  The image in the marked rectangle will then zoom in, and be displayed across the whole video panel.  You can repeat this process to zoom in the resulting image.

Zoom out: Use shortcut key Ctrl+space, or right click the image, in the menu that opens select Zoom…, and in the submenu select Zoom Out.  If you zoomed in several times, each zoom out

will undo one zoom in operation, until you reach the original image .

Fit To Window: Cancels any zoom operation, and displays the original image.  To select this option, right click the image, in the menu that opens select Zoom…, and in the submenu select Fit to Window.

 

Image Rotation is done through Control Panel.

Video Panel

75

Page 77: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Control Panel

•Frame Grabbers select camera to display . Select the camera board number and channel number, then click Apply. 

•Illumination Pins toggle buttons that turn illumination pins on and off. 

•Image Rotation rotate the video image

76

Page 78: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Diagram PanelAverage brightness is average of image pixels. Low brightness value represents a dark image,

while high brightness value represents a light image.  STD Deviation chart represents image contrast, thus reflects image focus. A higher value of STD deviation means a better focus.

 

77

Page 79: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Control Panel

RGB graph shows RGB components of incoming video signal

Note that if you want to measure the brightness or contrast of a region in the image (for example, the plate zone), then first zoom into that region, and the values will reflect the measurements within that small area.

Note : To start SeeCal , open SeeService , disable SeeGate , exit from SeeGate,start SeeCal. To enable SeeGate back , exit from SeeCal, open SeeService , enable SeeGate

78

Page 80: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

9. SeeTrain Architecture

79

Page 81: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

System configuration

80

Page 82: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Camera configuration

There are 4 cameras on each level, located at 4 corners. The side cameras take images of the side markings, while the back container

cameras take images on the back/front.

82

Page 83: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

SeeTrain - System Cables

92

Page 84: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

83

Page 85: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Gantry

84

Page 86: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Installation Dimensions

85

Page 87: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Camera &Illumination Units

86

Page 88: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Video Connection

87

Page 89: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

I/O Control

88

Page 90: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

GUI Main Display

89

Page 91: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Camera Settings

90

Page 92: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Capture Set Settings

91

Page 93: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

I/O Settings

92

Page 94: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

General Settings

93

Page 95: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Image Settings

94

Page 96: SeeGate2 & SeeTrain Technical Training – October 2009 Version 2.

Last Slide…

Thank you

84