Scuba slides maxxi
-
Upload
maximus-seneca -
Category
Small Business & Entrepreneurship
-
view
226 -
download
0
Transcript of Scuba slides maxxi
Project Status Report
Presenter Name: Maximus SenecaPresentation Date: October 10th 2015
Mechanics of leashThe clamp mechanism picks the pet waste at once, no adjusting, just a click of a button.
Dog Leash LOGO
Looks good for a logoIt is all about DOGS
The scooper
The Scooper• Easy to use.
The added value scooper
SCOOPING LININGMade of old news papers and selected recycle papers.
OUR CONCEPTSDOG LEASH INFINITE. The ability to combine both leash and scooper and make into portable.
Alternate modelsNice exterior but not so round, needs to shape for outside use
The two parts to assemble
The bottom• Underneath the scooper
The part that goes under
Picture shows Storage and Music. Good for pictures as well
Multi-color USB port This is different colors to pick from
http://www.ebay.com/itm/USB-LCD-Screen16GB-Support-Flash-TF-Player-MP3-Music-FM-Radio-Earphone-/201334145685?var=&hash=item2ee0734295
The camera• Camera system for leash
Camera system for recording memorable moments with the pet
Leash
Project Overview
• What is the project about?
• Define the goal of this project
• Define the scope of this project
Current Status
• What progress has been made since the previous milestone?o Which tasks have been completed?o What issues have been resolved?o What new issues have risen? *
• Is the project currently ahead of schedule, on track, or delayed?o If delayed, what is the mitigation plan?
Issues and Resolutions
• Description of the issue
• How was it resolved?
• What and how did it impact the project?o Timeo Costo Other
Milestone 1• Date 1
Milestone 2• Date 2
Milestone 3• Date 3
Milestone 4• Date 4
Timeline
Date 1 Date 2 Date 3 Date 4
Timeline
Date 1
Date 2
Date 3
Date 4
Timeline
Looking Ahead
• When is the next milestone?
• What are the expected deliverables?
• Known risks and issueso What is the investigation timeline for
these issues?
• What are the immediate next steps?
Dependencies and Resources
Project
Vendors
Manufacturing
SalesEngineering
Remote Teams
Appendix
Appendix
• Budget
• Design documents
• Marketing plan
• Supplemental documents
• Contact information