Rab Mck Dan Sumur Bor

12
daftar harga bahan No Rincian Satuan BAHAN 1 Atap Seng Lbr 2 Bak Air Biasa Bh 3 Balok Kasau 5/5 Bh 4 Balok Kuda -Kuda 5/7 Bh 5 Batako Bh 6 Batu Belah 7 Batu Gunung/Kali 8 Besi Beton Polos 12 Btg 9 Besi Beton Polos 6 Btg 10 Besi Ø 10 mm Btg 11 Besi Ø 6 mm Btg 12 Betonit Ls 13 Cat Kilap Kg 14 Centrailizer (Pelurus) Bh 15 Dop Socket 3" Bh 16 Elbow Pipa PVC Ø 1" Bh 17 Elbow Pipa PVC Ø 1¼" Bh 18 Elektrik Pump 1,5" (Sanyo) Unit 19 Engsel dan Kunci Bh 20 Fibreglass (Kingkong) Buah 21 Kawat Beton Kg 22 Kawat Harmonika 23 Kerikil Beton 24 Kerikil Ukr. 1" 25 Klosed Jongkok Bh 26 Lem dan Seal Tape Bh 27 Lem Pipa PVC Kg 28 Nok Atap Seng/ Bubungan M1 29 Paku Kg 30 Papan Cor Lbr 31 Papan Lap 2/10 Bh 32 Papan Listplank Ulin Kpng 33 Papan Nama Program Bh 34 Pasir Beton 35 Pasir Pasang 36 Pasir Urug 37 Pintu Panel ( 90 x 180 cm ) Bh 38 Pipa cassing Ø 3" PVC AW M 39 Pipa Conductor Ø 10" PVC D M 40 Pipa jambang Ø 4" PVC AW M 41 Pipa Pisometer Ø 1" PVC AW M 42 Pipa PVC (AW) Ø 1¼" M 43 Pipa PVC Dia. 2 " Btg 44 Pipa PVC Dia. 4 " Btg

Transcript of Rab Mck Dan Sumur Bor

Page 1: Rab Mck Dan Sumur Bor

daftar harga bahan

No Rincian Satuan

BAHAN

1 Atap Seng Lbr2 Bak Air Biasa Bh3 Balok Kasau 5/5 Bh4 Balok Kuda -Kuda 5/7 Bh5 Batako Bh6 Batu Belah M³7 Batu Gunung/Kali M³8 Besi Beton Polos 12 Btg9 Besi Beton Polos 6 Btg

10 Besi Ø 10 mm Btg11 Besi Ø 6 mm Btg12 Betonit Ls13 Cat Kilap Kg14 Centrailizer (Pelurus) Bh15 Dop Socket 3" Bh16 Elbow Pipa PVC Ø 1" Bh17 Elbow Pipa PVC Ø 1¼" Bh18 Elektrik Pump 1,5" (Sanyo) Unit19 Engsel dan Kunci Bh20 Fibreglass (Kingkong) Buah21 Kawat Beton Kg22 Kawat Harmonika M²23 Kerikil Beton M³24 Kerikil Ukr. 1" M³25 Klosed Jongkok Bh26 Lem dan Seal Tape Bh27 Lem Pipa PVC Kg28 Nok Atap Seng/ Bubungan M129 Paku Kg30 Papan Cor Lbr31 Papan Lap 2/10 Bh32 Papan Listplank Ulin Kpng33 Papan Nama Program Bh34 Pasir Beton M³35 Pasir Pasang M³36 Pasir Urug M³37 Pintu Panel ( 90 x 180 cm ) Bh38 Pipa cassing Ø 3" PVC AW M39 Pipa Conductor Ø 10" PVC D M40 Pipa jambang Ø 4" PVC AW M41 Pipa Pisometer Ø 1" PVC AW M42 Pipa PVC (AW) Ø 1¼" M43 Pipa PVC Dia. 2 " Btg44 Pipa PVC Dia. 4 " Btg

Page 2: Rab Mck Dan Sumur Bor

45 Prasasti Bh46 Reduser ND 100 MM x 75 MM Bh47 Saringan (Screen Stainlist Steel Karbon 30) Ø Bh48 Semen PC Zak49 Semen PC (Clay Pack) Zak50 Sepitank Bh51 Sirtu M³52 Socket Pipa PVC Ø 8" Buah53 Stop Kran Ø 1" Bh

ALAT

1 Benang Nilon Bh 2 Cangkul Bh 3 Gergaji Bh 4 Kereta Sorong Bh 5 Meteran Bh 6 Palu Bh 7 Pangki Bh 8 Raskam Bh 9 Sekop Bh

10 Sewa Alat Bor Ls 11 Sewa Alat Pumping Test Ls 12 Timba Bh

UPAH

1 Mandor HOK 2 Tukang HOK 3 Pekerja HOK

Page 3: Rab Mck Dan Sumur Bor

daftar harga bahan

Harga (Rp)

60,000 500,000 20,000 30,000 7,000 250,000 250,000 72,000 25,000 60,000 45,000 300,000 60,000 35,000 30,000 4,000 8,000 2,500,000 200,000 8,000,000 20,000 50,000 200,000 150,000 150,000 20,000 72,000 35,000 18,000 70,000 20,000 60,000 300,000 180,000 150,000 140,000 700,000 42,000 135,000 70,000 10,000 15,000 70,000 180,000

Page 4: Rab Mck Dan Sumur Bor

300,000 1,750,000 260,000 50,000 50,000 5,000,000 140,000 210,000 50,000

13,000 50,000 45,000 350,000 10,000 15,000 15,000 6,000 50,000 40,000,000 500,000 5,000

50,000 70,000 50,000

Page 5: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN SUMUR BORGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

No Rincian Volume Satuan

BAHAN

1 Pipa Conductor Ø 10" PVC D 12.00 M 2 Pipa jambang Ø 4" PVC AW 50.00 M 3 Pipa cassing Ø 3" PVC AW 45.00 M 4 Pipa Pisometer Ø 1" PVC AW 60.00 M 5 Pipa PVC (AW) Ø 1¼" 30.00 M 6 Socket Pipa PVC Ø 8" 1.00 Buah 7 Saringan (Screen Stainlist Steel Karbon 30) Ø 9.00 Bh 8 Dop Socket 3" 1.00 Bh 9 Reduser ND 100 MM x 75 MM 1.00 Bh

10 Centrailizer (Pelurus) 20.00 Bh 11 Elbow Pipa PVC Ø 1" 12.00 Bh 12 Elbow Pipa PVC Ø 1¼" 6.00 Bh 13 Lem Pipa PVC 4.00 Kg 14 Stop Kran Ø 1" 1.00 Bh 15 Kerikil Ukr. 1" 4.00 M³ 16 Semen PC (Clay Pack) 4.00 Zak 17 Elektrik Pump 1,5" (Sanyo) 1.00 Unit 18 Betonit 1.00 Ls 19 Pasir Urug 3.00 M³ 20 Pasir Beton 3.00 M³ 21 Kerikil Beton 3.00 M³ 22 Semen PC 20.00 Zak 23 Papan Nama Program 1.00 Bh 24 Prasasti 1.00 Bh

ALAT

1 Sewa Alat Bor 1.00 Ls 2 Sewa Alat Pumping Test 4.00 Ls

UPAH

1 Mandor 74.00 HOK 2 Pekerja 638.00 HOK

JUMLAH TOTAL

Page 6: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN SUMUR BORGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

135,000 1,620,000 70,000 3,500,000 42,000 1,890,000 10,000 600,000 15,000 450,000 210,000 210,000 260,000 2,340,000 30,000 30,000 1,750,000 1,750,000 35,000 700,000 4,000 48,000 8,000 48,000 72,000 288,000 50,000 50,000 150,000 600,000 50,000 200,000 2,500,000 2,500,000 300,000 300,000 140,000 420,000 180,000 540,000 200,000 600,000 50,000 1,000,000 300,000 300,000 300,000 300,000 Jumlah Bahan 20,284,000

40,000,000 40,000,000 500,000 2,000,000

Jumlah Alat 42,000,000

50,000 3,700,000 50,000 31,900,000

Jumlah Upah 35,600,000 JUMLAH TOTAL 97,884,000

Harga Satuan (Rp )

Jumlah Harga (Rp)

Page 7: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN SARANA MCKGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

No Rincian Volume Satuan

B A H A N

1 Semen PC 32.00 Zak 2 Pasir Beton 6.80 M³ 3 Kerikil Beton 2.00 M³ 4 Kawat Harmonika 5.00 M² 5 Batako 224.00 Bh 6 Besi Ø 10 mm 6.40 Btg 7 Besi Ø 6 mm 12.80 Btg 8 Batu Belah 3.28 M³ 9 Balok Kuda -Kuda 5/7 10.00 Bh

10 Balok Kasau 5/5 10.00 Bh 11 Papan Lap 2/10 6.00 Bh 12 Papan Listplank Ulin 4.00 Kpng 13 Atap Seng 8.00 Lbr 14 Nok Atap Seng/ Bubungan 4.00 M1 15 Cat Kilap 4.00 Kg 16 Klosed Jongkok 1.00 Bh 17 Pipa PVC Dia. 4 " 2.00 Btg 18 Pipa PVC Dia. 2 " 1.00 Btg 19 Lem dan Seal Tape 3.00 Bh 20 Engsel dan Kunci 3.00 Bh 21 Pintu Panel ( 90 x 180 cm ) 1.00 Bh 22 Bak Air Biasa 1.00 Bh 23 Sepitank 1.00 Bh

ALAT - ALAT

UPAH KERJA

1 Mandor 5.0 HOK 2 Tukang 20.0 HOK 3 Pekerja 100.0 HOK

JUMLAH TOTAL

Page 8: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN SARANA MCKGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

50,000 1,600,000.00 180,000 1,224,000.00 200,000 400,000.00 50,000 250,000.00 7,000 1,568,000.00 60,000 384,000.00 45,000 576,000.00 250,000 819,000.00 30,000 300,000.00 20,000 200,000.00 20,000 120,000.00 60,000 240,000.00 60,000 480,000.00 35,000 140,000.00 60,000 240,000.00 150,000 150,000.00 180,000 360,000.00 70,000 70,000.00 20,000 60,000.00 200,000 600,000.00 700,000 700,000.00 500,000 500,000.00 5,000,000 5,000,000.00

Jumlah Bahan 15,981,000.00

Jumlah Alat -

50,000 250,000.00 70,000 1,400,000.00 50,000 5,000,000.00

Jumlah Upah 6,650,000.00 JUMLAH TOTAL 22,631,000.00

Harga Satuan (Rp )

Jumlah Harga (Rp)

Page 9: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN BAK PENAMPUNG AIRGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

No Rincian Volume Satuan

BAHAN

1 Fibreglass (Kingkong) 1.00 Buah 2 Sirtu 2.00 M³ 3 Pasir Beton 1.00 M³ 4 Kerikil Beton 1.00 M³ 5 Semen PC 21.00 Zak 6 Pasir Pasang 1.00 M³ 7 Batu Gunung/Kali 3.00 M³ 8 Besi Beton Polos 12 4.00 Btg 9 Besi Beton Polos 6 2.00 Btg

10 Kawat Beton 1.00 Kg 11 Papan Cor 10.00 Lbr 12 Paku 3.00 Kg

ALAT

1 Benang Nilon 2.00 Bh 2 Cangkul 2.00 Bh 3 Gergaji 2.00 Bh 4 Kereta Sorong 2.00 Bh 5 Meteran 1.00 Bh 6 Palu 3.00 Bh 7 Pangki 3.00 Bh 8 Raskam 3.00 Bh 9 Sekop 3.00 Bh

10 Timba 5.00 Bh

UPAH

1 Mandor 2.00 HOK 2 Tukang 20.00 HOK 3 Pekerja 100.00 HOK

JUMLAH TOTAL

Page 10: Rab Mck Dan Sumur Bor

RENCANA ANGGARAN BIAYA

PEMBUATAN BAK PENAMPUNG AIRGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

8,000,000 8,000,000 140,000 280,000 180,000 180,000 200,000 200,000 50,000 1,050,000 150,000 150,000 250,000 750,000 72,000 288,000 25,000 50,000 20,000 20,000 70,000 700,000 18,000 54,000 Jumlah Bahan 11,722,000

13,000 26,000 50,000 100,000 45,000 90,000 350,000 700,000 10,000 10,000 15,000 45,000 15,000 45,000 6,000 18,000 50,000 150,000 5,000 25,000

Jumlah Alat 1,209,000

50,000 100,000 70,000 1,400,000 50,000 5,000,000

Jumlah Upah 6,500,000 JUMLAH TOTAL 19,431,000

Harga Satuan (Rp )

Jumlah Harga (Rp)

Page 11: Rab Mck Dan Sumur Bor

REKAPITULASI

PEMBUATAN SUMUR BOR, MCK DAN BAK PENAMPUNG AIRGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

No Rincian

1 Pembuatan Sumur Bor2 Pembuatan Sarana MCK3 Pembuatan Bak Penampung Air

JUMLAH TOTAL

Page 12: Rab Mck Dan Sumur Bor

REKAPITULASI

PEMBUATAN SUMUR BOR, MCK DAN BAK PENAMPUNG AIRGAMPONG ARON ASAN KUMBANG KECAMATAN KEMBANG TANJONG KAB. PIDIE

97,884,000 22,631,000 19,431,000

139,946,000

Jumlah Harga (Rp)