PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME...

11

Transcript of PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME...

Page 1: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩

AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-1
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
MINIMUM DISTANCE TO
AutoCAD SHX Text
PLUMBING VENT, 4"
AutoCAD SHX Text
ROOF, INDICATE IF
AutoCAD SHX Text
PLUMBING VENT,
AutoCAD SHX Text
SOLAR PANEL, IF
AutoCAD SHX Text
REQUIRED TO OFFSET,
AutoCAD SHX Text
EXISTING OR NEW
AutoCAD SHX Text
OF ALL VENTS, FIELD
AutoCAD SHX Text
VERIFY PRIOR TO ANY
AutoCAD SHX Text
ENLARGED PARTIAL
AutoCAD SHX Text
SOLAR PANELS, SEE
AutoCAD SHX Text
FOR CONNECTION TO
AutoCAD SHX Text
STRUCTURE SEE DETAIL 2
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
STREET NAME (INDICATE WHICH SIDE OF THE PROPERTY)
AutoCAD SHX Text
%%USAMPLE ROOF PLAN / SITE PLAN
AutoCAD SHX Text
SCALE: ?
AutoCAD SHX Text
ROOF PLAN 1 SHEET
AutoCAD SHX Text
SHEET PV-2
AutoCAD SHX Text
PLUMBING PERMIT WILL
AutoCAD SHX Text
BE REQUIRED
AutoCAD SHX Text
GENERAL NOTES SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. DESIGN COMPLYING WITH THE LATEST EDITION OF CALIFORNIA ELECTRICAL CODE, NEC, THE SAN DIEGO AREA ELECTRICAL NEWSLETTERS AND ALL LOCAL ORDINANCES AND POLICIES. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A MINIMUM 85 MPH WIND LOAD. THE HOUSE IS . . . . . STORY(IES) TALL. THE RAFTERS ARE . . . . . x . . . . . AND . . . . . INCHES ON CENTER. THIS SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. WHEN A STORAGE BATTERY IS PROVIDED, THIS SYSTEM SHALL BE AN UTILITY INTERACTIVE SYSTEM WITH LISTED STORAGE BATTERIES PER CEC ARTICLE 706, AND CRC SECTION R327 REQUIREMENTS. STATIONARY STORAGE BATTERY SYSTEMS SHALL COMPLY CFC, AND HAVING CAPACITIES NOT EXCEEDING THE VALUES SHOWN IN TABLE 608.1 2016 CFC. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED ON THE MODULE AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS. PROPER ACCESS AND WORKING CLEARANCE WILL BE PROVIDED AS PER SECTION 110.26 CEC.
AutoCAD SHX Text
PV-2
AutoCAD SHX Text
SIGNATURE &
AutoCAD SHX Text
LICENSE NUMBER
AutoCAD SHX Text
SHOW LOCATION
AutoCAD SHX Text
INSTALLATION
AutoCAD SHX Text
REFLECT ACTUAL PROJECT SPECIFIC DETAILS.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
ALL ITALIC FONTS SHALL BE MODIFIED TO
AutoCAD SHX Text
INDICATE IF
AutoCAD SHX Text
METER,
AutoCAD SHX Text
NEW OR EXISTING
AutoCAD SHX Text
INVERTER
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
HIP
AutoCAD SHX Text
REFER TO PV-4 FOR ROOF FIRE PATHWAY DIMENSION
AutoCAD SHX Text
NOTE: IDENTIFY THE RIDGE, HIP AND VALLEY ON THE PLAN
AutoCAD SHX Text
ROOF ACCESS
AutoCAD SHX Text
ROOF ACCESS
AutoCAD SHX Text
REFER TO: SEE FPB Policy P-16-12, Photovoltaic Roof Access and Pathways for Alternative Ventilation
AutoCAD SHX Text
REFER TO PV-4.1 FOR EMERGENCY ESCAPE OPENING
AutoCAD SHX Text
As the home owner of the subject project, I certify that I am requesting to install the solar photovoltaic system shown on these plans. __________ _______________________ Home Owner Signature _____________________________ Home Owner’s Name (Printed)_______________________ Home Owner Signature _____________________________ Home Owner’s Name (Printed)s Name (Printed)
Page 2: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩
AutoCAD SHX Text
%%UENLARGED PARTIAL ROOF PLAN DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
MODULE RAILING, TYP.
AutoCAD SHX Text
INDICATE DISTANCE
AutoCAD SHX Text
BETWEEN CONNECTIONS
AutoCAD SHX Text
2x FRAMING
AutoCAD SHX Text
SOLAR MODULE,
AutoCAD SHX Text
(INDICATE SIZE & SHOW
AutoCAD SHX Text
IF EXISTING OR NEW)
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
TO STRUCTURE AS PER
AutoCAD SHX Text
CONNECT SOLAR MODULE
AutoCAD SHX Text
DETAIL SHEET PV-2
AutoCAD SHX Text
SIZE & WEIGHT
AutoCAD SHX Text
INDICATE SOLAR MODULE
AutoCAD SHX Text
INDICATE DISTANCE FROM
AutoCAD SHX Text
EDGE OF ROOF
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
NTS
AutoCAD SHX Text
%%USOLAR MODULE MOUNTING DETAIL DETAIL
AutoCAD SHX Text
TRUSS, OR ROOF FRAMING
AutoCAD SHX Text
ROOF DECKING
AutoCAD SHX Text
INDICATE TYPE
AutoCAD SHX Text
ROOF TILE,
AutoCAD SHX Text
POST / TILE HOOK
AutoCAD SHX Text
(SHOW TYPE)
AutoCAD SHX Text
(SHOW TYPE)
AutoCAD SHX Text
BASERAIL
AutoCAD SHX Text
FROM RAIL TO BASERAIL
AutoCAD SHX Text
SHOW TYPE OF CONNECTION
AutoCAD SHX Text
RAIL (SHOW TYPE)
AutoCAD SHX Text
SOLAR MODULE
AutoCAD SHX Text
LAG SCREW
AutoCAD SHX Text
(INDICATE SIZE)
AutoCAD SHX Text
EMBEDMENT INTO
AutoCAD SHX Text
RAFTER (TYP. 2 PER MOUNT)
AutoCAD SHX Text
LICENSE NUMBER
AutoCAD SHX Text
SIGNATURE &
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PV-2
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
MINIMUM 2-1/2" THREAD
AutoCAD SHX Text
TO YOUR PROJECT.
AutoCAD SHX Text
SHOW EXACT MOUNTING DETAIL AS APPLIES
AutoCAD SHX Text
%%UNOTE:
AutoCAD SHX Text
1. THIS IS ONLY A SAMPLE FOR THE MOUNTING.
AutoCAD SHX Text
2. ALL ITALIC FONTS SHALL BE MODIFIED TO
AutoCAD SHX Text
REFLECT ACTUAL PROJECT SPECIFIC DETAILS.
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
FLASHING
AutoCAD SHX Text
SHOW DIMENSION
AutoCAD SHX Text
NTS
AutoCAD SHX Text
%%UELEVATION
Page 3: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩

1. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OFCALIFORNIA ELECTRICAL CODE AND THE SAN DIEGO AREA ELECTRICALNEWSLETTER, WILL BE INSTALLED AS REQUIRED.

2. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC,ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTNG COLOR TOTHE PLAQUE. THIS PLAQUE WILL BE ATTACHED BY POP RIVETS ORSCREWS OR OTHER APPROVED METHOD. IF EXPOSED TO SUNLIGHT, ITSHALL BE UV RESISTANCE.

3. PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BEINSTALLED IN METAL CONDUIT AND THE CONDUIT SHALL BE LABELED,"CAUTION DC CIRCUIT" OR EQUIVALENT EVERY 10 FT."

4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES,EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED INACCORDANCE WITH 250.134 OR 250.136 (A) REGARDLESS OF VOLTAGE.

5. EACH MODULE SHALL BE GROUNDED USING THE SUPPLIED CONNECTIONPOINT IDENTIFIED ON THE MODULE AND THE MANUFACTURER'SINSTRUCTIONS.

6. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIEDOR IS ONLY METALIC WATER PIPING, IT IS THE CONTRACTOR'SRESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE.

7. THE INVERTER SHALL BE LISTED AS A UTILITY INTERACTIVE8. UNIT INSTALLED ON THE SAME BUILDING AS THE MODULES BUT NOT ON

THE ROOF.

9. THE INVERTER OUTPUT CIRCUIT CONDUCTORS SHALL TERMINATE WITHINTHE SERVICE PANEL IN ACCORDANCE WITH CEC 690.64(B)(7).

10. BACKFEED BREAKERS IN THE SERVICE PANEL SHALL BE SUITABLE FORTHAT USE.

11. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THEMANUFACTURER'S APPROVED INSTALLATION INSTRUCTIONS. A COPY OFTHESE INSTRUCTIONS ARE INCLUDED AS PART OF THIS PLAN.

12. ALL EQUIPMENT AND WIRING SHALL BE LISTED BY NATIONAL RECOGNIZEDTESTING AGENCY

13. USE MINIMUM 8 AWG EQUIPMENT GROUNDING CONDUCTOR (EGC) WHENIT IS SUBJECT TO PHYSICAL DAMAGE, OR INSTALL THE EGC IN ANAPPROVED RACEWAY.

14. ALL WIRING SHALL BE OF COPPER MATERIAL, AND KEPT OUTSIDE OF THEBUILDING.

15. ALL ELECTRICAL EQUIPMENT INCLUDING THE SERVICE SHALL HAVE ALEGIBLE, VISIBLE, AND DURABLE MARKING INDICATING THEMANUFACTURER NAME, CURRENT, VOLTAGE, FREQUENCY, AND NUMBEROF PHASES.

16. EACH INSTALLED EQUIPMENT, WIRING AND OVERCURRENT PROTECTIVEDEVICE (OCPD) SHALL HAVE A SHORT CIRCUIT RATING NOT LESS THANTHE AVAILABLE SHORT CIRCUIT CURRENT AT THEIR INPUT TERMINALS.

17. THE INVERTER SHALL COMPLY ACCORDANCE WITH CEC 690.11.

AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-3A
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
%%USAMPLE STRING INVERTER SINGLE LINE DIAGRAM
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
General Notes
AutoCAD SHX Text
SIGNATURE & LICENSE NUMBER & CLASSIFICATION C-10 OR C-46
Page 4: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩

1. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OFCALIFORNIA ELECTRICAL CODE AND THE SAN DIEGO AREA ELECTRICALNEWSLETTER, WILL BE INSTALLED AS REQUIRED.

2. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC,ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTNG COLOR TOTHE PLAQUE. THIS PLAQUE WILL BE ATTACHED BY POP RIVETS ORSCREWS OR OTHER APPROVED METHOD. IF EXPOSED TO SUNLIGHT, ITSHALL BE UV RESISTANCE.

3. PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BEINSTALLED IN METAL CONDUIT AND THE CONDUIT SHALL BE LABELED,"CAUTION DC CIRCUIT" OR EQUIVALENT EVERY 10 FT."

4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES,EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED INACCORDANCE WITH 250.134 OR 250.136 (A) REGARDLESS OF VOLTAGE.

5. EACH MODULE SHALL BE GROUNDED USING THE SUPPLIED CONNECTIONPOINT IDENTIFIED ON THE MODULE AND THE MANUFACTURER'SINSTRUCTIONS.

6. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIEDOR IS ONLY METALIC WATER PIPING, IT IS THE CONTRACTOR'SRESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE.

7. THE INVERTER SHALL BE LISTED AS A UTILITY INTERACTIVE8. UNIT INSTALLED ON THE SAME BUILDING AS THE MODULES BUT NOT ON

THE ROOF.

9. THE INVERTER OUTPUT CIRCUIT CONDUCTORS SHALL TERMINATE WITHINTHE SERVICE PANEL IN ACCORDANCE WITH CEC 690.64(B)(7).

10. BACKFEED BREAKERS IN THE SERVICE PANEL SHALL BE SUITABLE FORTHAT USE.

11. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THEMANUFACTURER'S APPROVED INSTALLATION INSTRUCTIONS. A COPY OFTHESE INSTRUCTIONS ARE INCLUDED AS PART OF THIS PLAN.

12. ALL EQUIPMENT AND WIRING SHALL BE LISTED BY NATIONAL RECOGNIZEDTESTING AGENCY

13. USE MINIMUM 8 AWG EQUIPMENT GROUNDING CONDUCTOR (EGC) WHENIT IS SUBJECT TO PHYSICAL DAMAGE, OR INSTALL THE EGC IN ANAPPROVED RACEWAY.

14. ALL WIRING SHALL BE OF COPPER MATERIAL, AND KEPT OUTSIDE OF THEBUILDING.

15. ALL ELECTRICAL EQUIPMENT INCLUDING THE SERVICE SHALL HAVE ALEGIBLE, VISIBLE, AND DURABLE MARKING INDICATING THEMANUFACTURER NAME, CURRENT, VOLTAGE, FREQUENCY, AND NUMBEROF PHASES.

16. EACH INSTALLED EQUIPMENT, WIRING AND OVERCURRENT PROTECTIVEDEVICE (OCPD) SHALL HAVE A SHORT CIRCUIT RATING NOT LESS THANTHE AVAILABLE SHORT CIRCUIT CURRENT AT THEIR INPUT TERMINALS.

17. THE INVERTER SHALL COMPLY ACCORDANCE WITH CEC 690.11.

AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-3B
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
%%USAMPLE MICRO INVERTER SINGLE LINE DIAGRAM
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
General Notes
AutoCAD SHX Text
SIGNATURE & LICENSE NUMBER & CLASSIFICATION C-10 OR C-46
Page 5: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩

1. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OFCALIFORNIA ELECTRICAL CODE AND THE SAN DIEGO AREA ELECTRICALNEWSLETTER, WILL BE INSTALLED AS REQUIRED.

2. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC,ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTNG COLOR TOTHE PLAQUE. THIS PLAQUE WILL BE ATTACHED BY POP RIVETS ORSCREWS OR OTHER APPROVED METHOD. IF EXPOSED TO SUNLIGHT, ITSHALL BE UV RESISTANCE.

3. PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BEINSTALLED IN METAL CONDUIT AND THE CONDUIT SHALL BE LABELED,"CAUTION DC CIRCUIT" OR EQUIVALENT EVERY 10 FT."

4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES,EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED INACCORDANCE WITH 250.134 OR 250.136 (A) REGARDLESS OF VOLTAGE.

5. EACH MODULE SHALL BE GROUNDED USING THE SUPPLIED CONNECTIONPOINT IDENTIFIED ON THE MODULE AND THE MANUFACTURER'SINSTRUCTIONS.

6. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIEDOR IS ONLY METALIC WATER PIPING, IT IS THE CONTRACTOR'SRESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE.

7. THE INVERTER SHALL BE LISTED AS A UTILITY INTERACTIVE8. UNIT INSTALLED ON THE SAME BUILDING AS THE MODULES BUT NOT ON

THE ROOF.

9. THE INVERTER OUTPUT CIRCUIT CONDUCTORS SHALL TERMINATE WITHINTHE SERVICE PANEL IN ACCORDANCE WITH CEC 690.64(B)(7).

10. BACKFEED BREAKERS IN THE SERVICE PANEL SHALL BE SUITABLE FORTHAT USE.

11. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THEMANUFACTURER'S APPROVED INSTALLATION INSTRUCTIONS. A COPY OFTHESE INSTRUCTIONS ARE INCLUDED AS PART OF THIS PLAN.

12. ALL EQUIPMENT AND WIRING SHALL BE LISTED BY NATIONAL RECOGNIZEDTESTING AGENCY

13. USE MINIMUM 8 AWG EQUIPMENT GROUNDING CONDUCTOR (EGC) WHENIT IS SUBJECT TO PHYSICAL DAMAGE, OR INSTALL THE EGC IN ANAPPROVED RACEWAY.

14. ALL WIRING SHALL BE OF COPPER MATERIAL, AND KEPT OUTSIDE OF THEBUILDING.

15. ALL ELECTRICAL EQUIPMENT INCLUDING THE SERVICE SHALL HAVE ALEGIBLE, VISIBLE, AND DURABLE MARKING INDICATING THEMANUFACTURER NAME, CURRENT, VOLTAGE, FREQUENCY, AND NUMBEROF PHASES.

16. EACH INSTALLED EQUIPMENT, WIRING AND OVERCURRENT PROTECTIVEDEVICE (OCPD) SHALL HAVE A SHORT CIRCUIT RATING NOT LESS THANTHE AVAILABLE SHORT CIRCUIT CURRENT AT THEIR INPUT TERMINALS.

17. THE INVERTER SHALL COMPLY ACCORDANCE WITH CEC 690.11.

AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-3.1A
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
%%USAMPLE SINGLE LINE DIAGRAM
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
General Notes
AutoCAD SHX Text
SIGNATURE & LICENSE NUMBER & CLASSIFICATION C-10 OR C-46
Page 6: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩

1. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OFCALIFORNIA ELECTRICAL CODE AND THE SAN DIEGO AREA ELECTRICALNEWSLETTER, WILL BE INSTALLED AS REQUIRED.

2. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC,ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTNG COLOR TOTHE PLAQUE. THIS PLAQUE WILL BE ATTACHED BY POP RIVETS ORSCREWS OR OTHER APPROVED METHOD. IF EXPOSED TO SUNLIGHT, ITSHALL BE UV RESISTANCE.

3. PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BEINSTALLED IN METAL CONDUIT AND THE CONDUIT SHALL BE LABELED,"CAUTION DC CIRCUIT" OR EQUIVALENT EVERY 10 FT."

4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES,EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED INACCORDANCE WITH 250.134 OR 250.136 (A) REGARDLESS OF VOLTAGE.

5. EACH MODULE SHALL BE GROUNDED USING THE SUPPLIED CONNECTIONPOINT IDENTIFIED ON THE MODULE AND THE MANUFACTURER'SINSTRUCTIONS.

6. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIEDOR IS ONLY METALIC WATER PIPING, IT IS THE CONTRACTOR'SRESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE.

7. THE INVERTER SHALL BE LISTED AS A UTILITY INTERACTIVE8. UNIT INSTALLED ON THE SAME BUILDING AS THE MODULES BUT NOT ON

THE ROOF.

9. THE INVERTER OUTPUT CIRCUIT CONDUCTORS SHALL TERMINATE WITHINTHE SERVICE PANEL IN ACCORDANCE WITH CEC 690.64(B)(7).

10. BACKFEED BREAKERS IN THE SERVICE PANEL SHALL BE SUITABLEAS SUCH.

11. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE

MANUFACTURER'S APPROVED INSTALLATION INSTRUCTIONS. A COPY OFTHESE INSTRUCTIONS ARE INCLUDED AS PART OF THIS PLAN.

12. ALL EQUIPMENT AND WIRING SHALL BE LISTED BY NATIONAL RECOGNIZEDTESTING AGENCY

13. USE MINIMUM 8 AWG EQUIPMENT GROUNDING CONDUCTOR (EGC) WHENIT IS SUBJECT TO PHYSICAL DAMAGE, OR INSTALL THE EGC IN ANAPPROVED RACEWAY.

14. ALL WIRING SHALL BE OF COPPER MATERIAL, AND KEPT OUTSIDE OF THEBUILDING.

15. ALL ELECTRICAL EQUIPMENT INCLUDING THE SERVICE SHALL HAVE ALEGIBLE, VISIBLE, AND DURABLE MARKING INDICATING THEMANUFACTURER NAME, CURRENT, VOLTAGE, FREQUENCY, AND NUMBEROF PHASES.

16. EACH INSTALLED EQUIPMENT, WIRING AND OVERCURRENT PROTECTIVEDEVICE (OCPD) SHALL HAVE A SHORT CIRCUIT RATING NOT LESS THANTHE AVAILABLE SHORT CIRCUIT CURRENT AT THEIR INPUT TERMINALS.

17. THE INVERTER SHALL COMPLY ACCORDANCE WITH CEC 690.11.

AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-3.2A
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
%%USAMPLE SINGLE LINE DIAGRAM
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
General Notes
AutoCAD SHX Text
SIGNATURE & LICENSE NUMBER & CLASSIFICATION C-10 OR C-46
Page 7: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-4.1
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
SIGNATURE &
AutoCAD SHX Text
LICENSE NUMBER
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
%%UEMERGENCY ESCAPE & RESCUE OPENING
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Matt Paiss Fire Captain - San Jose, CA www.energyresponsesolutions.com
Page 8: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-4.1
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
SIGNATURE &
AutoCAD SHX Text
LICENSE NUMBER
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
Matt Paiss Fire Captain - San Jose, CA www.energyresponsesolutions.com
Page 9: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
PV-4
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT ADRESS
AutoCAD SHX Text
REVISION DATE
AutoCAD SHX Text
COMPANY LOGO
AutoCAD SHX Text
SIGNATURE &
AutoCAD SHX Text
LICENSE NUMBER
AutoCAD SHX Text
LEGAL DESCRIPTION / ASSESSOR'S PARCEL NUMBER
AutoCAD SHX Text
KW RATING OF
AutoCAD SHX Text
THE SYSTEM
AutoCAD SHX Text
%%UCROSS GABLE WITH HIP & VALLEY ROOF
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Matt Paiss Fire Captain - San Jose, CA www.energyresponsesolutions.com
Page 10: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩
Page 11: PROJECT NAME PROJECT NO. PV-1 DRAWN BY: SHEET … · property line STREET NAME \⠀䤀一䐀䤀䌀䄀吀䔀 圀䠀䤀䌀䠀 匀䤀䐀䔀 伀䘀 吀䠀䔀 倀刀伀倀䔀刀吀夀尩