PROYECTO: "REMODELACION CASA "
PRESUPUESTO DE ACTIVIDADES1 1.1 1.2 1.3 1.4LOCALIZACION Y REPLANTEO CERRAMIENTO PROVISIONAL DEMOLICION DE MUROS RETIRO DE ESCOMBROS SUBTOTAL
PRELIMINARES
UND. M2 ML M2 M3
CANT. 100 80 50 20
VR. UNT. $ 1,100.00 $ 4,500.00 $ 5,000.00 $ 7,991.67
VR. TOTAL $ 110,000 $ 360,000 $ 250,000 $ 159,833
$ 879,833.33UND. M2 M2 M2 M2 M2 M2 CANT. 25 29.5 8 12 10 8 VR. UNT. $ 25,000.00 $ 15,000.00 $ 75,000.00 $ 15,000.00 $ 35,000.00 $ 32,000.00 VR. TOTAL 625,000 442,500 600,000 180,000 350,000 256,000
2 2.1 2.3 2.5 2.6 2.9 2.10FRISOS MUROS
MAMPOSTERIA Y ACABADOSMUROS EN BLOQUE H-10
CIELO RASO EN DRY WALL ESTUCO Y PINTURA INTERIOR PISOS BAOS CERAMICA ANTIDESLIZANTE PARED BAOS EN CERAMICA SUBTOTAL
$ 2,453,500.00
TOTAL COSTO DIRECTO Administracin (15%) Imprevistos (2%) Utilidad (3%) TOTAL A.I.U. (20%) SUBTOTAL A.I.U (20%) + COSTO DIRECTO
3,333,333 500,000 66,667 100,000 666,667 4,000,000
COSTO TOTAL PROYECTO
4,000,000
SUBANALISIS DE MANOS DE OBRA POR FUNCIONES AYUDANTE JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA OFICIAL JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA MAESTRO JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA AUX. RESIDENTE JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA CONTRAMAESTRO %/K 1.000 VALOR 496,900 55,000 551,900 469,115 1,021,015 VR TOTAL 16,563 1,833 18,397 15,637 34,034 1,021,015 551,900 4,254 28,158 1,833 29,991 25,492 55,483 1,664,501 899,730 6,935 VR TOTAL 49,690.000 49,690.000 42,236.500 91,926.500 ### ### 11,490.813 VR TOTAL 41,408.333 41,408.333 35,197.083 76,605.417 ### ### 9,575.677 VR TOTAL
0.850 30.000 30.000 0.125
1.700 496,900.000 55,000.000 0.850 30.000 30.000 0.125 %/K VALOR 3.000 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K VALOR 2.500 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K
VALOR
JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA TOPOGRAFO JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA RESIDENTE JORNAL SUB DE TRANS.
2.000 496,900.000 55,000.000 0.850 30.000 30.000 0.125 %/K VALOR 3.000 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K VALOR 5.000 496,900.000 0.000
33,126.667 1,833.333 34,960.000 29,716.000 64,676.000 ### ### 8,084.500 VR TOTAL 49,690.000 49,690.000 37,267.500 86,957.500 ### ### 10,869.688 VR TOTAL 82,816.667 82,816.667 70,394.167 153,210.833 ### ### 19,151.354 VR TOTAL 19,876.000 0.000 19,876.000 16,894.600 36,770.600 ### 596,280.000 4,596.325 VR TOTAL 26,832.600 1,833.333 28,665.933 24,366.043 53,031.977 ### 859,978.000
PRES. SOCIALES 0.850 SALARIO DIARIO SALARIO MENSUAL 30.000 SALARIO MEN. SIN PRES. 30.000 VR HORA 0.125 CELADOR DIURNO / HERRAMENTERO / K % VALOR JORNAL 1.200 496,900.000 SUB DE TRANS. 0.000 PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA CELADOR NOCTURNO JORNAL (RECARGO NOCTURNO 35%) SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. 0.850 30.000 30.000 0.125 %/K VALOR 1.620 496,900.000 55,000.000 0.850 30.000 30.000
VR HORA
0.125
6,628.997
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
LOCALIZACION Y REPLANTEOMATERIALES UND CANT
1.1VR UNIT
M2DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO 100.00 V/TOTAL 100.00
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM. PRECIO/KM VR TOTAL
TOTAL TRANSPORTE MANO DE OBRA TOPOGRAFO AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 49,690.00 16,563.33 % PREST. 37,267.50 15,637.17 RENDIMIENTO 150.00 150.00 TOTAL MANO OBRA V/UNITARIO 579.72 214.67 V/TOTAL 579.72 429.34 1,009.06
TOTAL COSTO DIRECTO
1,109
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
DESCAPOTEMATERIALES UND CANT
1.2VR UNIT
M2DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO 100.00 V/TOTAL 200.00
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM. PRECIO/KM VR TOTAL
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 16.00 16.00 TOTAL MANO OBRA V/UNITARIO 3,353.13 2,012.53
0.00 V/TOTAL 3,353.13 2,012.53 5,365.66
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
5,566
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS VALLA INFORMATIVA DE 5.00 X 2,8 MTSMATERIALES VALLA INFORMATIVA DE 5.00 X 2,8 MTS UND UND CANT 1.000 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 1,400,000.00
1.3VR UNIT 1,400,000.00
UNDDESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR ANDAMIOS UND DIA RENDIMIENTO 0.25 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 0.65 UNID. KM/TON KM. 154.000 PRECIO/KM 800.00 V/UNITARIO 6,000.00
1,400,000.00 V/TOTAL 2,100.00 24,000.00 26,100.00 VR TOTAL 80,080.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 1.00 1.00 TOTAL MANO OBRA V/UNITARIO 53,650.02 32,200.50
80,080.00 V/TOTAL 25,493.35 15,638.17 41,131.52
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
1,547,312
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CAMPAMENTO E INSTALACIONES PROVISIONALES 40 M2MATERIALES BISAGRA COBRIZADA 3" CONCRETO 2000 PSI AMARRE PARA TEJA PORTACANDADO NEGRO No. 4 PUNTILLA 2" CON CABEZA ACERO TABLA CHAPA .30x.025x3 MTS ORDINARIA LAMINA DE ZINC VARA DE CLAVO 6 METROS. UND UND M3 UND UND LB KG ML M2 ML CANT 12.00 0.40 90.00 4.00 5.00 5.00 70.00 40.000 18.00 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 54,000.00 132,012.83 45,000.00 9,280.00 11,550.00 27,852.22 346,500.00 320,000.00 65,340.00 1,011,535.05
1.4VR UNIT 4,500.00 314,316.25 500.00 2,320.00 2,200.00 5,064.04 4,500.00 8,000.00 3,300.00 TOTAL MATERIALES
GLOBALDESPERDICIO % 0.00 0.05 0.00 0.00 0.05 0.10 0.10 0.00 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 2,500.00 2,500.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 1.20 UNID. KM/TON KM. 154.000 PRECIO/KM 800.00
VR TOTAL 147,840.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 % PREST. 42,236.50 RENDIMIENTO 0.50 0.50 0.50 TOTAL MANO OBRA V/UNITARIO 183,853.00 107,300.03 64,401.00
147,840.00 V/TOTAL 183,853.00 107,300.03 193,203.00 484,356.03
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
1,646,231
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,887.50 2,750.00 5,637.50
CERRAMIENTO PROVISIONALMATERIALES TELA EN FIBRA PARALES , MADERA , PUNTILLA, ALAMBRE Y DEMAS INSUMOS UND M2 GLOBAL CANT 1.000 1.00
1.5VR UNIT 2,750.00 2,500.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 800.00 800.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 0.60 UNID. KM/TON KM. 1.000 PRECIO/KM 800.00
VR TOTAL 480.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL % PREST. RENDIMIENTO 125.00 125.00 TOTAL MANO OBRA V/UNITARIO 429.20 257.60
480.00 V/TOTAL 429.20 515.21 944.41
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
7,862
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE MAMPOSTERIA DE BAOS Y DUCHAS, DEMOLICION MURO CERRAMIENTO EXISTENTEMATERIALES UND CANT ITEMS UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
1.6 - 6.1VR UNIT
M2DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 14.00 14.00 TOTAL MANO OBRA V/UNITARIO 3,832.14 2,300.04 V/TOTAL 3,832.14 2,300.04 6,132.18
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
6,332
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE ENCHAPES PAREDMATERIALES UND CANT ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
1.7VR UNIT
M2DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 11.00 10.00 TOTAL MANO OBRA V/UNITARIO 4,877.27 3,220.05
0.00 V/TOTAL 4,877.27 3,220.05 8,097.32
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
8,297
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
DEMOLICION DE PISO INTERIORMATERIALES UND CANT
1.8VR UNIT
M2DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 11.00 9.00 TOTAL MANO OBRA V/UNITARIO 4,877.27 3,577.83 V/TOTAL 4,877.27 3,577.83 8,455.11
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
8,655
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
RETIRO DE ESCOMBROSMATERIALES UND CANT
1.9 - 6.4VR UNIT
M3DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 400.00 400.00 PRECIO/KM 5,000.00 VR TOTAL 12,000.00
TOTAL EQUIPO TRANSPORTE VOLQUETA CANT. 0.20 UNID. KM/TON KM. 12.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL % PREST. RENDIMIENTO 8.00 8.00 TOTAL MANO OBRA V/UNITARIO 6,706.25 4,025.06
12,000.00 V/TOTAL 6,706.25 8,050.13 14,756.38
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
27,156
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS EXCAVACION EN MATERIAL COMUNMATERIALES UND CANT ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
1.10 - 6.2VR UNIT
M3DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 4.00 2.50 TOTAL MANO OBRA V/UNITARIO 13,412.50 12,880.20 V/TOTAL 13,412.50 12,880.20 26,292.70
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
26,493
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
EXCAVACION PARA CAISSONS (2 - 5 METROS DE PROFUNDIDAD)MATERIALES UND CANT
1.11VR UNIT
M3DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 2.00 2.00 V/UNITARIO 14,000.00 12,000.00 V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 PRECIO/KM 800.00 VR TOTAL 36,960.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE ENTIBADO CANT. 0.30 UNID. KM/TON KM. 154.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 % PREST. 42,236.50 RENDIMIENTO 11.00 10.00 1.50 TOTAL MANO OBRA V/UNITARIO 8,356.95 5,365.00 21,467.00
36,960.00 V/TOTAL 8,356.95 5,365.00 21,467.00 35,188.96
28,158 16,563
25,49215,637.17
TOTAL COSTO DIRECTO
85,749
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS ( 5 - 8 METROS DE PROFUNDIDAD)MATERIALES UND CANT ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
1.12VR UNIT
M3DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 2.00 2.00 V/UNITARIO 14,000.00 12,000.00 V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 PRECIO/KM 800.00 VR TOTAL 36,960.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE ENTIBADO CANT. 0.30 UNID. KM/TON KM. 154.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 11.00 10.00 1.00 TOTAL MANO OBRA V/UNITARIO 8,356.95 5,365.00 32,200.50
36,960.00 V/TOTAL 8,356.95 5,365.00 32,200.50 45,922.46
TOTAL COSTO DIRECTO
96,482
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
RELLENO EN MATERIAL COMUNMATERIALES UND CANT
1.13 - 6.3VR UNIT
M3DESPERDICIO %
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 4.00 4.00 TOTAL MANO OBRA V/UNITARIO 13,412.50 8,050.13 V/TOTAL 13,412.50 8,050.13 21,462.63
TOTAL COSTO DIRECTO
22,063
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS RELLENO CON MATERIAL SELECCIONADOMATERIALES RECEBO SELECCIONADO UND M3 CANT 1.200 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 21,600.00
1.14VR UNIT 18,000.00
M3DESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBROCOMPACTADOR A GASOLINA HERRAMIENTA MENOR UND DIA RENDIMIENTO 25.00 V/UNITARIO 90,000.00
21,600.00 V/TOTAL 3,600.00 200.00 3,800.00 PRECIO/KM 3,000.00 VR TOTAL 5,400.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE RECEBO CANT. 0.15 UNID. KM/TON KM. 12.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02
5,400.00 V/TOTAL 2,146.00 1,288.02 3,434.02
TOTAL COSTO DIRECTO
34,234
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CMMATERIALES SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CM UND M3 CANT 1.200 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 66,000.00
1.15VR UNIT 55,000.00
M3DESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 25.00 V/UNITARIO 90,000.00
66,000.00 V/TOTAL 3,600.00 500.00 4,100.00 PRECIO/KM 3,000.00 VR TOTAL 5,400.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE BASE GRANULAR CANT. 0.15 UNID. KM/TON KM. 12.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 25.00 25.00 3.00 TOTAL MANO OBRA V/UNITARIO 3,677.06 2,146.00 10,733.50
5,400.00 V/TOTAL 3,677.06 2,146.00 10,733.50 16,556.56
TOTAL COSTO DIRECTO
92,057
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS SUELO CEMENTO RELLENO CAISSONSMATERIALES SUELO SELECCIONADO CEMENTO PORTLAND TIPO 1 UND M3 KG CANT 1.200 8.00 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,820.00 3,444.00 12,264.00
1.16VR UNIT 7,000.00 410.00 TOTAL MATERIALES
M3DESPERDICIO % 0.05 0.05
EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 15.00
V/UNITARIO 90,000.00
V/TOTAL 6,000.00 150.00 6,150.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE SUELO SELECCIONADO TRANSPORTE CEMENTO CANT. 0.15 0.002 UNID. KM/TON KM/TON KM. 12.000 154.00 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 30.00 30.00 4.00 TOTAL MANO OBRA V/UNITARIO 3,064.22 1,788.33 8,050.13 PRECIO/KM 3,000.00 800.00
VR TOTAL 5,400.00 184.80 5,584.80 V/TOTAL 3,064.22 1,788.33 8,050.13 12,902.68
TOTAL COSTO DIRECTO
36,901
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 12,949.83
SOLADOS, CONCRETO 2000 PSIMATERIALES CONCRETO 2000 PSI UND M3 CANT 0.040
2.1 - 6.8VR UNIT 314,316.25
M2DESPERDICIO % 0.03
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
12,949.83 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 184.80 72.00 256.80 V/UNITARIO 4,470.83 2,683.38 V/TOTAL 4,470.83 2,683.38 7,154.21
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.002 0.002 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 12.00 12.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
20,661
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X O,15 M PSI MURO FRONTALMATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2"
MUNICIPIO DE
3000UND M3 ML ML LB CANT 0.03 0.22 0.170 0.08
ITEM
UNIDAD
FECHA SEPTIEMBRE DE 2010 VR TOTAL 11,125.99 556.60 785.40 246.71 12,714.70
2.2 - 6.11VR UNIT 353,206.00 2,300.00 4,200.00 2,937.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.10 0.10 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 300.00 300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.040 0.020 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 4.00 4.00 TOTAL MANO OBRA V/UNITARIO 13,412.50 8,050.13 PRECIO/KM 800.00 3,000.000
VR TOTAL 4,928.00 720.00 5,648.00 V/TOTAL 13,412.50 8,050.13 21,462.63
TOTAL COSTO DIRECTO
40,125
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X 0,15 M 3000 PSI MURO FRONTALMATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2" UND M3 ML ML LB CANT 0.0150 0.30 0.40 0.19 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,563.78 704.55 1,377.20 585.93 8,231.46
2.3 - 6.11VR UNIT 353,256.00 2,135.00 3,130.00 2,937.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.10 0.10 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.040 0.020 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 4.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 8,050.13 PRECIO/KM 800.00 3,000.000
300.00 VR TOTAL 4,928.00 720.00 5,648.00 V/TOTAL 17,883.34 8,050.13 25,933.46
TOTAL COSTO DIRECTO
40,113
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS ANTEPISO EN CONCRETO 2500 PSI, 8 CMMATERIALES CONCRETO 2500 PSI UND M3 CANT 0.080 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 29,523.17
2.4VR UNIT 351,466.25
M2DESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
29,523.17 V/TOTAL 200.00 100.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,848.00 540.00 2,388.00 V/UNITARIO 5,961.11 3,577.83 V/TOTAL 5,961.11 3,577.83 9,538.95
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.015 0.015 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 9.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
41,550
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSPAVIMENTO RIGIDO EN PAVICRETO MR - 41 , E= 16 CMMATERIALES PAVICRETO MR - 41 UND M3 CANT 0.160 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 63,840.00
2.5VR UNIT 380,000.00
M2DESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.080 0.080 UNID. KM/TON KM/TON KM. 154.00 12.000 PRECIO/KM 800.00 3,000.000 UND RENDIMIENTO V/UNITARIO
63,840.00 V/TOTAL 600.00 600.00 VR TOTAL 9,856.00 2,880.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 25.00 25.00 8.00 TOTAL MANO OBRA V/UNITARIO 3,677.06 2,146.00 4,025.06
12,736.00 V/TOTAL 3,677.06 2,146.00 4,025.06 9,848.12
TOTAL COSTO DIRECTO
87,024
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS COLUMNETAS MURO FRONTAL 15 X 20MATERIALES CONCRETO 3000 PSI UND M3 CANT 0.032 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 11,867.72
2.6VR UNIT 353,206.00
MLDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA FORMALETA HERRAMIENTA MENOR UND DIA RENDIMIENTO 2.00 V/UNITARIO 5,000.00
11,867.72 V/TOTAL 2,500.00 150.00 2,650.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 18,385.30 10,730.00 8,050.13 V/TOTAL 18,385.30 10,730.00 8,050.13 37,165.43
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 4.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
53,275
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CONCRETO CICLOPEO BAJO ZAPATASMATERIALES CONCRETO 2500 PSI PIEDRA MEDIA ZONGA UND M3 M3 CANT 0.550 0.45 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 202,971.62 16,537.50 219,509.12
2.7 - 6.7VR UNIT 351,466.00 35,000.00 TOTAL MATERIALES
M3DESPERDICIO % 0.05 0.05
EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 6.00
V/UNITARIO 45,000.00
V/TOTAL 7,500.00 200.00 7,700.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO Y PIEDRA ZONGA CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 6.00 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 15,321.08 10,730.00 6,440.10 PRECIO/KM 800.00 3,000.000
VR TOTAL 12,320.00 3,600.00 15,920.00 V/TOTAL 15,321.08 10,730.00 12,880.20 38,931.29
TOTAL COSTO DIRECTO
282,060
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 381,992.29
ZAPATAS CONCRETO 3000 PSIMATERIALES CONCRETO 3000 PSI UND M3 CANT 1.030
2.8 - 6.5VR UNIT 353,206.00
M3DESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 8.00 V/UNITARIO 45,000.00
381,992.29 V/TOTAL 5,625.00 200.00 5,825.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 13,132.36 7,664.29 7,000.11 V/TOTAL 13,132.36 7,664.29 14,000.22 34,796.86
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 7.00 7.00 4.60 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
438,534
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS COLUMNAS Y VIGAS CONCRETO 3000 PSIMATERIALES CONCRETO 3000 PSI PUNTILLA 2" CON CABEZA TABLA .30x.025x3 ORDINAR ANDAMIO TUBULAR (SECC.) MORDAZAS EN PLATINA CON CUA ALQUILADAS PARALES UND M3 LB ML DD UN UN ITEMS 2.9 - 6.9 - 6.10 - 6.12 - 6.13 CANT 1.00 1.00 3.00 5.00 4.00 3.00 VR UNIT 351,466.00 2,937.00 13,500.00 1,500.00 1,500.00 1,000.00 UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 369,039.30 3,083.85 44,550.00 7,500.00 6,000.00 3,000.00
M3DESPERDICIO % 0.05 0.05 0.10 0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 8.00 V/UNITARIO 45,000.00
433,173.15 V/TOTAL 5,625.00 200.00 5,825.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 13,132.36 7,664.29 7,000.11 V/TOTAL 13,132.36 7,664.29 14,000.22 34,796.86
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 7.00 7.00 4.60 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
489,715
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CONCRETO CAISSONS CON IMPERMEABILIZANTE ( 2 A 8 MTS DE PROFUNDIDAD)MATERIALES CONCRETO 3000 PSI TABLA .30x.025x3 ORDINAR MORDAZAS EN PLATINA CON CUA ALQUILADAS (24 IMPERMEABILIZANTE UND M3 ML UN UN CANT 1.00 3.00 4.00 3.000 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 369,039.30 44,550.00 6,000.00 60,000.00
2.10VR UNIT 351,466.00 13,500.00 1,500.00 20,000.00
M3DESPERDICIO % 0.05 0.10 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA FORMALETA METALICA CAISSONS VIBRADOR HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 0.60 8.00 V/UNITARIO 25,000.00 45,000.00
479,589.30 V/TOTAL 41,666.67 5,625.00 800.00 48,091.67 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 18,385.30 10,730.00 8,050.13 V/TOTAL 18,385.30 10,730.00 16,100.25 45,215.55
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO Y FORMALETA METALICA TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 4.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
588,817
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 14,058.64 14,000.00 1,468.50 29,527.14
MESONES EN CONCRETO 60 CM X 8 CMMATERIALES CONCRETO 3000 PSI FORMALETA PUNTILLA DE 2" UND M3 GL LB CANT 0.040 1.00 0.50
2.11VR UNIT 351,466.00 14,000.00 2,937.00 TOTAL MATERIALES
MLDESPERDICIO % 0.00 0.00 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 400.00 400.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 10,730.00 6,440.10 PRECIO/KM 800.00 3,000.000
VR TOTAL 1,232.00 360.00 1,592.00 V/TOTAL 10,730.00 12,880.20 23,610.20
TOTAL COSTO DIRECTO
55,129
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 3,420.00 4,428.47 3,663.00 5,698.00 17,209.47
ALFAJIAS EN CONCRETOMATERIALES ALAMBRE NEGRO Cal. 18 CONCRETO 2500 PSI DURMIENTE ORDINARIO 4Mx.04x.04 LISTON EN AMARILLO 8 x.2.2 x3 UND KG M3 ML ML CANT 0.90 0.012 0.37 2.00
2.12VR UNIT 3,800.00 351,466.00 9,000.00 2,590.00 TOTAL MATERIALES
MLDESPERDICIO % 0.00 0.05 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 200.00 200.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.007 0.007 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 8.00 8.00 TOTAL MANO OBRA V/UNITARIO 6,706.25 4,025.06 PRECIO/KM 800.00 3,000.000
VR TOTAL 862.40 252.00 1,114.40 V/TOTAL 6,706.25 4,025.06 10,731.31
TOTAL COSTO DIRECTO
29,255
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS DINTELES EN CONCRETO H= 10 CMMATERIALES CONCRETO 3000 PSI TABLA PUNTILLA DE 2" UND M3 GLOBAL GL CANT 0.01 0.80 0.08 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,649.90 9,240.00 246.71 14,136.60
2.13VR UNIT 351,466.00 11,000.00 2,937.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.10 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 200.00 200.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO TORNILLO PTA BROCA EXTRAPL. EST 8 x 1/2" ( 13mm ) MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 CANT. 0.006 0.006 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE RENDIMIENTO 10.00 10.00 TOTAL MANO OBRA V/UNITARIO 5,365.00 3,220.05 PRECIO/KM 800.00 3,000.000
VR TOTAL 739.20 216.00 955.20 V/TOTAL 5,365.00 3,220.05 8,585.05
TOTAL COSTO DIRECTO
23,877
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS ACERO DE REFUERZO 60000 PSIMATERIALES ACERO SEGUETA ALAMBRE NEGRO No 18 UND KG UND KG CANT 1.00 0.50 0.03 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 3,300.00 302.50 125.40 3,727.90
2.14 - 6.6VR UNIT 3,000.00 550.00 3,800.00 TOTAL MATERIALES
KGDESPERDICIO % 0.10 0.00 0.00
EQUIPO/HERRAMIENTA
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL
TOTAL EQUIPO TRANSPORTE TRANSPORTE ACERO CANT. 0.006 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 VR TOTAL 739.20
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 200.00 200.00 TOTAL MANO OBRA V/UNITARIO 268.25 161.00
739.20 V/TOTAL 268.25 161.00 429.25
TOTAL COSTO DIRECTO
4,896
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS VIGAS AEREAS ESTRUCTURA SOPORTE CUBIERTA 0,25 X 0,30MATERIALES CONCRETO 3000 PSI TABLA 3 MTS PUNTILLA DE 2" UND M3 GL GL ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 370,866.30 52,800.00 4,725.00 428,391.30
2.15 - 612 - 6.13CANT 1.00 3.00 1.00 VR UNIT 353,206.00 16,000.00 4,500.00 TOTAL MATERIALES
M3DESPERDICIO % 0.05 0.10 0.05
EQUIPO/HERRAMIENTA FORMALETA
UND DIA
RENDIMIENTO 2.00 TOTAL EQUIPO
V/UNITARIO 5,000.00
V/TOTAL 2,500.00 2,500.00
TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000 TOTAL TRANSPORTE
PRECIO/KM 800.00 3,000.000
VR TOTAL 12,320.00 3,600.00 15,920.00
MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND JORNAL JORNAL JORNAL
CANT 1.00 1.00 2.00
JORNAL 49,690.00 28,158 16,563
% PREST. 42,236.50 25,492 15,637.17
RENDIMIENTO 3.00 3.00 2.00 TOTAL MANO OBRA
V/UNITARIO 30,642.17 17,883.34 16,100.25
V/TOTAL 30,642.17 17,883.34 32,200.50 80,726.01
TOTAL COSTO DIRECTO
527,537
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 31,500.00 525.00 32,025.00 V/UNITARIO V/TOTAL 300.00
ANDEN EN ADOQUINMATERIALES ADOQUINES ARENA UND M2 M3 CANT 1.000 0.02
2.16VR UNIT 30,000.00 25,000.00 TOTAL MATERIALES
M2DESPERDICIO % 0.05 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ADOQUIN TRANSPORTE ARENA CANT. 0.050 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02 PRECIO/KM 800.00 3,000.000 VR TOTAL 6,160.00 3,600.00 9,760.00 V/TOTAL 2,146.00 1,288.02 3,434.02
TOTAL COSTO DIRECTO
45,219
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,600.00
MALLA M - 262 ( 7 mm/ 0,15)MATERIALES MALLA M - 262 ( 7 mm/ 0,15) UND M2 CANT 1.000
2.17VR UNIT 6,000.00
M2DESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
6,600.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 1,232.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MALLA ACERO CANT. 0.010 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 120.00 120.00 TOTAL MANO OBRA V/UNITARIO 447.08 268.34
1,232.00 V/TOTAL 447.08 268.34 715.42
TOTAL COSTO DIRECTO
8,647
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 14,162.50 8,250.00 22,412.50
MUROS EN BLOQUE H - 10MATERIALES LADRILLO BLOQUE H - 10 MORTERO UND UND M3 CANT 12.500 0.03
3.1VR UNIT 1,030.00 250,000.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 300.00 300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO H - 10 CANT. 0.010 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 1,232.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 24.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,235.42 1,341.69
1,232.00 V/TOTAL 2,235.42 1,341.69 3,577.10
TOTAL COSTO DIRECTO
27,522
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS MUROS EN LADRILLO A LA VISTA MURO FRONTAL TIPO HOLLMANMATERIALES LADRILLO A LA VISTA MORTERO UND UND M3 CANT 58.000 0.05 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 47,850.00 12,500.00 60,350.00
3.2 - 6.14VR UNIT 750.00 250,000.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 300.00 300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO HOLLMAN CANT. 0.020 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 2,464.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 20.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,682.50 1,341.69
2,464.00 V/TOTAL 2,682.50 1,341.69 4,024.19
TOTAL COSTO DIRECTO
67,138
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,400.00
FRISOS MUROSMATERIALES MORTERO UND M3 CANT 0.02
3.3 - 6.15VR UNIT 250,000.00
M2DESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR UND UND RENDIMIENTO 500.00 V/UNITARIO 90,000.00
4,400.00 V/TOTAL 180.00 100.00 280.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 5,961.11 3,220.05 V/TOTAL 5,961.11 3,220.05 9,181.16
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 10.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
15,453
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS FRISOS IMPERMEABILIZADOS BAOS ( INCLUYE DILATACIONES)MATERIALES MORTERO 1:3 SIKA-1 UND M3 KG CANT 0.015 0.16 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,070.00 1,936.00 6,006.00
3.4VR UNIT 250,000.00 11,000.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR
UND UND
RENDIMIENTO 500.00
V/UNITARIO 90,000.00
V/TOTAL 180.00 100.00 280.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 10.00 TOTAL MANO OBRA V/UNITARIO 5,961.11 3,220.05 PRECIO/KM 800.00 3,000.000
VR TOTAL 1,232.00 360.00 1,592.00 V/TOTAL 5,961.11 3,220.05 9,181.16
TOTAL COSTO DIRECTO
17,059
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL
CIELO RASO EN DRY WALLMATERIALES CINTA PAPEL ( 76.2 ) Mt VINILTEX BASE AGUA MASILLA SUPERMASTIC USG PERFIL CANAL CAL.26 ( 90 mm ) PERFIL OMEGA Cal 26 2.44 Mt. PLACA PANEL REY 12. 7mm RH ( 2.44 x 1.22 ) TORNILLO AUTOPERFORANTE EST. 7/16 " TORNILLO AUTOPERFORANTE YESO 6 x1 TORNILLO PTA BROCA EXTRAPL. EST 8 x 1/2" ( 13mm ) UND CANT
3.5VR UNIT
M2DESPERDICIO %
GLOBAL
1.00
65,000.00
0.10
71,500.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA EQUIPO ELECTRICO PERFORACION UND UND RENDIMIENTO 5.00 V/UNITARIO 5,000.00
71,500.00 V/TOTAL 1,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CIELO RASO DRY WALL CANT. 0.005 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
1,000.00 VR TOTAL 616.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 30.00 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 3,064.22 1,788.33 1,073.35
616.00 V/TOTAL 3,064.22 1,788.33 2,146.70 6,999.25
TOTAL COSTO DIRECTO
80,115
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 9,975.00
ESTUCO Y PINTURA INTERIORMATERIALES ESTUCO , PINTURA Y LIJA UND GLOBAL CANT 1.000
3.6VR UNIT 9,500.00
M2DESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
9,975.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 VR TOTAL 616.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESTUCO Y PINTURA CANT. 0.005 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 23.00 23.00 TOTAL MANO OBRA V/UNITARIO 2,332.61 1,400.02
616.00 V/TOTAL 2,332.61 2,800.04 5,132.65
TOTAL COSTO DIRECTO
16,024
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PINTURA EXTERIOR VINILO KORAZA SOBRE PAETEMATERIALES PINTURA PARA EXTERIORES UND GAL CANT 0.080 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,160.00
3.7VR UNIT 70,000.00
M2DESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
6,160.00 V/TOTAL 500.00 500.00 PRECIO/KM 800.00 VR TOTAL 616.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE PINTURA CANT. 0.005 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 24.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,235.42 1,341.69
616.00 V/TOTAL 2,235.42 2,683.38 4,918.79
TOTAL COSTO DIRECTO
12,195
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 13,750.00
MORTERO DE NIVELACION 4 CMMATERIALES MORTERO DE NIVELACION 4 CM UND M3 CANT 0.050
3.8VR UNIT 250,000.00
M2DESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
13,750.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 3,576.67 2,146.70 V/TOTAL 3,576.67 4,293.40 7,870.07
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
23,512
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00 V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 2,464.00
PISOS BAOS CERAMICA ANTIDESLIZANTEMATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00
3.9VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.020 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70
2,464.00 V/TOTAL 3,576.67 4,293.40 7,870.07
TOTAL COSTO DIRECTO
40,634
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00
PARED BAOS EN CERAMICAMATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00
3.10VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 600.00 600.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.015 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 1,848.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02
1,848.00 V/TOTAL 2,146.00 2,576.04 4,722.04
TOTAL COSTO DIRECTO
36,870
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,280.00
ESQUINEROS EN ALUMINIOMATERIALES ESQUINERA , CEMENTO BLANCO UND GL CANT 1.000
3.11VR UNIT 4,800.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
5,280.00 V/TOTAL 100.00 100.00 PRECIO/KM VR TOTAL
TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 1,788.33 1,073.35 V/TOTAL 1,788.33 2,146.70 3,935.03
TOTAL COSTO DIRECTO
9,315
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSPISOS INTERIOR ( CERAMICA 30.5 X 30.5 INCLUYE BOQUILLA COLOR) DURO PISO O SIMILAR TRAFICO PESADOMATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00
3.12VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.015 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 1,848.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70
1,848.00 V/TOTAL 3,576.67 4,293.40 7,870.07
TOTAL COSTO DIRECTO
39,518
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS GUARDAESCOBAS EN CERAMICA H = 10 CMSMATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 1.00 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,800.00 2,750.00 11,550.00
3.13VR UNIT 8,000.00 2,500.00 TOTAL MATERIALES
MLDESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.006 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 739.20
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01
739.20 V/TOTAL 1,341.25 1,610.03 2,951.28
TOTAL COSTO DIRECTO
15,340
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 70,000.00 440.00 1,942.50 72,382.50
PUERTAS METALICASMATERIALES PUERTA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO Sobre lamina llena THINER UND m2 GAL GAL CANT 1.00 0.01 0.10
3.14VR UNIT 70,000.00 40,000.00 18,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.00 0.10 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 600.00 600.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE PUERTA CANT. 0.070 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 8,624.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 10,730.00 6,440.10
8,624.00 V/TOTAL 10,730.00 12,880.20 23,610.20
TOTAL COSTO DIRECTO
105,217
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PORTON METALICO ENTRADA PRINCIPALMATERIALES PORTON METALICO UND UND CANT 1.000 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,120,000.00
3.15VR UNIT 2,120,000.00
UNDDESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
2,120,000.00 V/TOTAL 400.00 400.00 PRECIO/KM 800.00 VR TOTAL 73,920.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE PORTON METALICO CANT. 0.600 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 0.30 0.30 0.30 TOTAL MANO OBRA V/UNITARIO 306,421.67 178,833.39 107,335.00
73,920.00 V/TOTAL 306,421.67 178,833.39 107,335.00 592,590.06
TOTAL COSTO DIRECTO
2,786,910
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 55,000.00 4,400.00 8,140.00 67,540.00
VENTANAS METALICASMATERIALES VENTANA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO Sobre lamina llena THINER UND m2 GL GAL CANT 1.00 0.10 0.40
3.16VR UNIT 55,000.00 40000 18,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.00 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 500.00 500.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE VENTANA METALICA CANT. 0.070 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 8,624.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70
8,624.00 V/TOTAL 3,576.67 2,146.70 5,723.37
TOTAL COSTO DIRECTO
82,387
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VIDRIOS VENTANAS Y PUERTAS 4 MMMATERIALES VIDRIO 4 m.m. , INSUMOS, ELEMENTOS DE FIJACION, SILICONA, TORNILLOS UND M2 CANT 1.000 ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 23,430.00
3.17VR UNIT 21,300.00
M2DESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
23,430.00 V/TOTAL 500.00 500.00 PRECIO/KM 800.00 VR TOTAL 4,928.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE VIDRIOS CANT. 0.040 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 6.00 6.00 TOTAL MANO OBRA V/UNITARIO 8,941.67 5,366.75
4,928.00 V/TOTAL 8,941.67 5,366.75 14,308.42
TOTAL COSTO DIRECTO
43,166
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,445.00 4,070.00 9,515.00 V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 369.60
PINTURA EXTERIOR GRADERIASMATERIALES ESMALTE THINER UND GL GALON CANT 0.11 0.20
3.18VR UNIT 45,000.00 18,500.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01
369.60 V/TOTAL 1,341.25 805.01 2,146.26
TOTAL COSTO DIRECTO
12,631
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS ESPEJOS PARA BAOS PUBLICOS 3 MMMATERIALES ESPEJOS CRISTAL DE 4 m.m.INCOLORO MATERIALES, INSUMOS UND M2 GLOBAL CANT 1.00 1.00 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 57,200.00 11,000.00 68,200.00
3.19VR UNIT 52,000.00 10,000.00 TOTAL MATERIALES
M2DESPERDICIO % 0.10 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 600.00 600.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESPEJOS CANT. 0.018 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 2,217.60
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 12.00 12.00 TOTAL MANO OBRA V/UNITARIO 4,470.83 2,683.38
2,217.60 V/TOTAL 4,470.83 2,683.38 7,154.21
TOTAL COSTO DIRECTO
78,172
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PINTURA EN ESMALTE CARPINT. METALICA PUERTAS, VENTANAS, REJAS CERRAMIENTO.MATERIALES LIJA, ANTICORROSIVO, ESMALTE, THINER UND GLOBAL CANT 1.05 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 23,100.00
3.20VR UNIT 22,000.00
M2DESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
23,100.00 V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 32.00 32.00 TOTAL MANO OBRA V/UNITARIO 1,676.56 1,006.27
369.60 V/TOTAL 1,676.56 1,006.27 2,682.83
TOTAL COSTO DIRECTO
26,752
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 28,350.00
PUNTO HIDRAULICO PVC DE 1/2" PRESIONMATERIALES tubo, limpiador, soldadura, accesorios, regata UND GL CANT 1.00
4.1VR UNIT 27,000.00
UNDDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
28,350.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 123.20
TOTAL EQUIPO TRANSPORTE TRANSPORTE CANT. 0.001 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70
123.20 V/TOTAL 3,576.67 2,146.70 5,723.37
TOTAL COSTO DIRECTO
34,297
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 30,450.00
PUNTO HIDRAULICO DE PVC 1" PRESIONMATERIALES tubo, limpiador, soldadura, accesorios, regata UND GL CANT 1.00
4.2VR UNIT 29,000.00
UNDDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
30,450.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 123.20
TOTAL EQUIPO TRANSPORTE TRANSPORTE CANT. 0.001 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70
123.20 V/TOTAL 3,576.67 2,146.70 5,723.37
TOTAL COSTO DIRECTO
36,397
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,193.00
TUBERIA PVC DE 1/2" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.3VR UNIT 5,630.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
6,193.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 60.00 60.00 TOTAL MANO OBRA V/UNITARIO 894.17 536.68
369.60 V/TOTAL 894.17 536.68 1,430.84
TOTAL COSTO DIRECTO
8,093
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 7,480.00
TUBERIA PVC DE 3/4" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.4VR UNIT 6,800.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
7,480.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01
369.60 V/TOTAL 1,341.25 805.01 2,146.26
TOTAL COSTO DIRECTO
10,096
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 10,230.00
TUBERIA PVC DE 1" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.5VR UNIT 9,300.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
10,230.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01
369.60 V/TOTAL 1,341.25 805.01 2,146.26
TOTAL COSTO DIRECTO
12,846
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 12,650.00
TUBERIA PVC DE 1 Y 1/4" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.6VR UNIT 11,500.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
12,650.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 55.00 55.00 TOTAL MANO OBRA V/UNITARIO 975.45 585.46
369.60 V/TOTAL 975.45 585.46 1,560.92
TOTAL COSTO DIRECTO
14,681
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 15,400.00
TUBERIA PVC DE 1 Y 1/2" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.7VR UNIT 14,000.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
15,400.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01
369.60 V/TOTAL 1,532.86 920.01 2,452.87
TOTAL COSTO DIRECTO
18,322
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 16,720.00
TUBERIA PVC DE 2" PRESIONMATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00
4.8VR UNIT 15,200.00
MLDESPERDICIO % 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
16,720.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01
369.60 V/TOTAL 1,532.86 920.01 2,452.87
TOTAL COSTO DIRECTO
19,642
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 48,000.00 65,000.00 65,000.00 178,000.00
MEDIDOR ROSCADO DE 1/2" CON CAJA CONCRETO Y TAPA METALICAMATERIALES MEDIDOR ROSCADO DE 1/2" BAR METERS ACCESORIOS, VALVULA DE CORTE 1/2" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00
4.9VR UNIT 48,000.00 65,000.00 65,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 3,080.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
209,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 55,000.00 65,000.00 65,000.00 185,000.00
MEDIDOR ROSCADO DE 3/4" CON CAJA CONCRETO Y TAPA METALICAMATERIALES MEDIDOR ROSCADO DE 3/4" BAR METERS ACCESORIOS, VALVULA DE CORTE 3/4" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00
4.10VR UNIT 55,000.00 65,000.00 65,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 3,080.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
216,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 85,000.00 72,000.00 65,000.00 222,000.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 3,080.00
MEDIDOR ROSCADO DE 1" CON CAJA CONCRETO Y TAPA METALICAMATERIALES MEDIDOR ROSCADO DE 1" BAR METERS ACCESORIOS, VALVULA DE CORTE 1" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00
4.11VR UNIT 85,000.00 72,000.00 65,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
253,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA
MEDIDOR ROSCADO DE (1 Y 1/2)" CON CAJA CONCRETO Y TAPA METALICAMATERIALES MEDIDOR ROSCADO DE (1 Y 1/2)" BAR METERS ACCESORIOS, VALVULA DE CORTE (1 Y 1/2)" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00
4.12VR UNIT 92,000.00 89,000.00 65,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
SEPTIEMBRE DE 2010 VR TOTAL 92,000.00 89,000.00 65,000.00 246,000.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 3,080.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
277,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 217,000.00 12,000.00 55,000.00 284,000.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 3,080.00
VALVULA DE CORTE RED WHITE DE 2"MATERIALES VALVULA RED WHITE DE 2" ACCESORIOS CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT
4.13VR UNIT 1.00 1.00 1.00 217,000.00 12,000.00 55,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
315,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 48,825.00
PUNTO DE PVC 2" SANITARIOMATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 2" UND GL CANT 1.00
5.1VR UNIT 46,500.00
UNDDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
48,825.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07
985.60 V/TOTAL 7,664.29 4,600.07 12,264.36
TOTAL COSTO DIRECTO
62,175
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 60,900.00
PUNTO DE PVC 3" SANITARIOMATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 3" UND GL CANT 1.00
5.2VR UNIT 58,000.00
UNDDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
60,900.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07
985.60 V/TOTAL 7,664.29 4,600.07 12,264.36
TOTAL COSTO DIRECTO
74,250
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 87,150.00
PUNTO DE PVC 4" SANITARIOMATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 4" UND GL CANT 1.00
5.3VR UNIT 83,000.00
UNDDESPERDICIO % 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
87,150.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07
985.60 V/TOTAL 7,664.29 4,600.07 12,264.36
TOTAL COSTO DIRECTO
100,500
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 12,650.00 1,840.00 15,550.50
TUBERIA DE PVC 2" SANITARIAMATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 2`` Pavco UNIN SANITARIA 2`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16
5.4VR UNIT 500.00 50,000.00 11,500.00 11,500.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.05 0.10 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 50.00 50.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.009 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 1,108.80
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02
1,108.80 V/TOTAL 2,146.00 1,288.02 3,434.02
TOTAL COSTO DIRECTO
20,143
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 19,800.00 2,080.00 22,930.00
TUBERIA DE PVC 3" SANITARIAMATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 3`` Pavco UNIN SANITARIA 3`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16
5.5VR UNIT 500.00 50,000.00 18,000.00 13,000.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.05 0.10 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 50.00 50.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.009 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 1,108.80
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 28.00 28.00 TOTAL MANO OBRA V/UNITARIO 1,916.07 1,150.02
1,108.80 V/TOTAL 1,916.07 1,150.02 3,066.09
TOTAL COSTO DIRECTO
27,155
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 28,930.00 2,400.00 32,380.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 5,544.00
TUBERIA DE PVC 4" SANITARIAMATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 4`` Pavco UNIN SANITARIA 4`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16
5.6VR UNIT 500.00 50,000.00 26,300.00 15,000.00 TOTAL MATERIALES
MLDESPERDICIO % 0.05 0.05 0.10 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.045 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 2,682.50 1,610.03
5,544.00 V/TOTAL 2,682.50 1,610.03 4,292.53
TOTAL COSTO DIRECTO
42,317
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 26,402.54 66,792.00 13,125.00 304.00 2,646.00 18,216.00 127,485.54
CAJA DE INSPECCION DE 80 X 80 CMSMATERIALES CONCRETO 2,000 PSI LADRILLO PRECOCIDO COMUN 12x24x6 Dep. MORTERO ALAMBRE NEGRO Cal. 18 CEMENTO GRIS ACERO DE REFUERZO UND M3 UN M3 KG KG KG CANT 0.08 75.90 0.05 0.08 6.00 4.14
5.7VR UNIT 314,316.00 800.00 250,000.00 3,800.00 420.00 4,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.05 0.10 0.05 0.00 0.05 0.10
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 500.00 500.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.100 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 12,320.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 1.00 1.00 TOTAL MANO OBRA V/UNITARIO 53,650.02 32,200.50
12,320.00 V/TOTAL 53,650.02 64,401.00 118,051.02
TOTAL COSTO DIRECTO
258,357
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA
SANITARIO CONVENCIONAL ACUACER CON GRIFERIAMATERIALES PEGACOR BLANCO SANITARIO ACUACER Blanco. Ref. 30038 UND kg un CANT 1.00 1.00
5.8VR UNIT 2,500.00 237,000.00
UNDDESPERDICIO % 0.05 0.00
SEPTIEMBRE DE 2010 VR TOTAL 2,500.00 248,850.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
251,350.00 V/TOTAL 200.00 200.00 PRECIO/KM 800.00 VR TOTAL 3,080.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
283,247
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA
SANITARIO DE FLUXOMETROMATERIALES SANITARIO (TAZA) ACCESORIOS MENORES, REGATA FLUXOMETRO GRIVAL DE PALANCA UND GL GL GL CANT 1.00 1.00 1.00
5.9VR UNIT 220,000.00 15,000.00 550,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.00 0.00 0.00
SEPTIEMBRE DE 2010
VR TOTAL 220,000.00 15,000.00 550,000.00 785,000.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 500.00 500.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 3,080.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 2.00 2.00 TOTAL MANO OBRA V/UNITARIO 26,825.01 16,100.25
3,080.00 V/TOTAL 26,825.01 16,100.25 42,925.26
TOTAL COSTO DIRECTO
831,505
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,625.00 95,000.00
LAVAMANOS DE COLGAR ACUACER CON GRIFERIAMATERIALES PEGACOR BLANCO LAVAMANOS CON GRIFERA UNA LLAVE GRIVAL UND kg un CANT 1.00 1.00
5.10VR UNIT 2,500.00 95,000.00
UNDDESPERDICIO % 0.05 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
97,625.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 VR TOTAL 2,587.20
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.021 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50
2,587.20 V/TOTAL 17,883.34 10,733.50 28,616.84
TOTAL COSTO DIRECTO
129,129
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 1,837.50 41,000.00 5,250.00 35,000.00 81,250.00
DUCHAS, INCLUYE GRIFERA GRIVALMATERIALES PEGACOR BLANCO DUCHA PRISMA SENCILLA GRIVAL OTROS INSUMOS, REGATA, MORTERO INCLUYE GRIFERIA GRIVAL UNA LLAVE UND kg un GL UN CANT 0.70 1.00 1.00 1.00
5.11VR UNIT 2,500.00 41,000.00 5,000.00 35,000.00 TOTAL MATERIALES
UNDDESPERDICIO % 0.05 0.00 0.05 0.00
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO
V/TOTAL 100.00 100.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.004 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00
VR TOTAL 492.80
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07
492.80 V/TOTAL 7,664.29 4,600.07 12,264.36
TOTAL COSTO DIRECTO
94,107
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,500.00
REJILLAS DE 3X2 PARA SIFONES DE PISOMATERIALES REJILLAS 3X2 EN ALUMINIO UND UN CANT 1.00
5.12VR UNIT 4,500.00
UNDDESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
4,500.00 V/TOTAL 50.00 50.00 PRECIO/KM 800.00 VR TOTAL 492.80
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.004 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 1,788.33 1,073.35
492.80 V/TOTAL 1,788.33 1,073.35 2,861.68
TOTAL COSTO DIRECTO
7,904
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOSITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,000.00
REJILLAS DE 4X3 PARA SIFONES DE PISOMATERIALES REJILLAS 4X3 EN ALUMINIO UND UN CANT 1.00
5.13VR UNIT 8,000.00
UNDDESPERDICIO % 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO
8,000.00 V/TOTAL 50.00 50.00 PRECIO/KM 800.00 VR TOTAL 246.40
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.002 UNID. KM/TON KM. 154.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01
246.40 V/TOTAL 1,532.86 920.01 2,452.87
TOTAL COSTO DIRECTO
10,749
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CERCHAS PRINCIPALES ( EN ELEMENTOS RECTANGULARES)MATERIALES CERCHAS PRINCIPALES SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD
MUNICIPIO DE
FECHA
8.1VR UNIT 780,000.00 12,000.00 40,000.00 15,000.00 2,000.00
MLDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
SEPTIEMBRE DE 2010 VR TOTAL 780,000.00 3,960.00 1,680.00 315.00 420.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.200 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
786,375.00 V/TOTAL 500.00 2,500.00 433.33 3,433.33 VR TOTAL 24,640.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 3.00 3.00 3.00 V/UNITARIO 30,642.17 17,883.34 10,733.50
24,640.00 V/TOTAL 30,642.17 17,883.34 32,200.50
TOTAL MANO OBRA
80,726.01
TOTAL COSTO DIRECTO
895,174
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CERCHA - RIOSTRAMATERIALES CERCHAS RIOSTRA SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 240,000.00 3,960.00 1,680.00 315.00 420.00 246,375.00
8.2VR UNIT 240,000.00 12,000.00 40,000.00 15,000.00 2,000.00 TOTAL MATERIALES
MLDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO
V/UNITARIO 5,000.00 50,000.00 1,300.00
V/TOTAL 500.00 2,500.00 433.33 3,433.33
TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.160
UNID. KM/TON
KM. 154.00
PRECIO/KM 800.00
VR TOTAL 19,712.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 2.00 2.00 2.00 TOTAL MANO OBRA V/UNITARIO 45,963.25 26,825.01 16,100.25
19,712.00 V/TOTAL 45,963.25 26,825.01 48,300.75 121,089.01
TOTAL COSTO DIRECTO
390,609
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CORREA TIPO (EN PERFIL 100 X 50 X 2 MM)MATERIALES CORREA TIPO (EN PERFIL 100 X 50 X 2 MM) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 61,000.00 3,960.00 1,680.00 315.00 420.00
8.3VR UNIT 61,000.00 12,000.00 40,000.00 15,000.00 2,000.00
MLDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.160 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
67,375.00 V/TOTAL 500.00 2,500.00 433.33 3,433.33 VR TOTAL 19,712.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 10,730.00 6,440.10
19,712.00 V/TOTAL 18,385.30 10,730.00 6,440.10 35,555.40
TOTAL COSTO DIRECTO
126,076
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS TIRANTES ( PLATINA 2" E= 1/8" )MATERIALES TIRANTES ( PLATINA 2" E= 1/8" ) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.05 0.01 0.01 0.20 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 18,000.00 660.00 420.00 157.50 420.00
8.4VR UNIT 18,000.00 12,000.00 40,000.00 15,000.00 2,000.00
MLDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 50.00 50.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.044 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
19,657.50 V/TOTAL 100.00 1,000.00 433.33 1,533.33 VR TOTAL 5,420.80
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 20.00 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 4,596.33 2,682.50 1,610.03
5,420.80 V/TOTAL 4,596.33 2,682.50 1,610.03 8,888.85
TOTAL COSTO DIRECTO
35,500
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2MATERIALES CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.05 0.01 0.01 0.20 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 16,000.00 660.00 420.00 157.50 420.00
8.5VR UNIT 16,000.00 12,000.00 40,000.00 15,000.00 2,000.00
MLDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 50.00 50.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
17,657.50 V/TOTAL 100.00 1,000.00 433.33 1,533.33 VR TOTAL 6,776.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 20.00 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 4,596.33 2,682.50 1,610.03
6,776.00 V/TOTAL 4,596.33 2,682.50 1,610.03 8,888.85
TOTAL COSTO DIRECTO
34,856
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2MATERIALES PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.01 0.01 0.60 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 220,000.00 3,960.00 420.00 157.50 1,260.00
8.6VR UNIT 220,000.00 12,000.00 40,000.00 15,000.00 2,000.00
UNDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.100 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
225,797.50 V/TOTAL 500.00 2,500.00 650.00 3,650.00 VR TOTAL 12,320.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 3.00 3.00 2.00 TOTAL MANO OBRA V/UNITARIO 30,642.17 17,883.34 16,100.25
12,320.00 V/TOTAL 30,642.17 17,883.34 32,200.50 80,726.01
TOTAL COSTO DIRECTO
322,494
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2MATERIALES PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.20 0.01 0.01 0.40 ITEM UNIDAD
MUNICIPIO DE
FECHA
8.7VR UNIT 90,000.00 12,000.00 40,000.00 15,000.00 2,000.00
UNDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
SEPTIEMBRE DE 2010 VR TOTAL 90,000.00 2,640.00 420.00 157.50 840.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
94,057.50 V/TOTAL 500.00 2,500.00 650.00 3,650.00 VR TOTAL 6,776.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 17,883.34 10,733.50
6,776.00 V/TOTAL 18,385.30 17,883.34 10,733.50 47,002.14
TOTAL COSTO DIRECTO
151,486
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2MATERIALES PLATINA PARA FIJACION DE CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.20 0.01 0.01 0.40 ITEM UNIDAD
MUNICIPIO DE
FECHA SEPTIEMBRE DE 2010 VR TOTAL 95,000.00 2,640.00 420.00 157.50 840.00
8.8VR UNIT 95,000.00 12,000.00 40,000.00 15,000.00 2,000.00
UNDESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 20.00 35.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
99,057.50 V/TOTAL 250.00 1,428.57 650.00 2,328.57 VR TOTAL 6,776.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 4.00 4.00 4.00 V/UNITARIO 22,981.63 13,412.50 8,050.13
6,776.00 V/TOTAL 22,981.63 13,412.50 8,050.13
TOTAL MANO OBRA
44,444.25
TOTAL COSTO DIRECTO
152,606
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( EXTREMO CERCHA ) E= 3/8" A= 390 CM2MATERIALES PLATINA PARA FIJACION DE CONTRAVI