Presented By: T.M.S.S. Tennakoon
11/S/D/BSc/09
-
7/31/2019 Presentatio VMW
2/19
Project Objectives
The objectives of the (E311)expansion road construction
listed below:-
Reduced traffic congestion in day time.
Improve time efficiency to reach other
destination very quickly.
Improved access for pedestrians and cyclistswith safety.
-
7/31/2019 Presentatio VMW
3/19
Value Management Workshop Objectives
Identify and clarify the evaluation criteria
Review and clear about project based
parameters
Clearly recommended access Plan
Inspect the development options and suggest.
-
7/31/2019 Presentatio VMW
4/19
Agenda
The two days VMW successfully carried out with relevant formulated
strategic analyzed. Agenda of the workshop shown below
Technically qualified appropriate professionals were participated to the
VMW to made perfect decision. The workshop participants were split
into groups to assist the progress of the workshop
-
7/31/2019 Presentatio VMW
5/19
Strategic Diagnosis Agenda
Introduction of the project by client.
Introduction to participants role
Explain the project scope and objective Workshop
Final report of the value management.
-
7/31/2019 Presentatio VMW
6/19
Limit of the Expansion Road
Geographical Parameters
Topographical Parameters
Financial Parameters
-
7/31/2019 Presentatio VMW
7/19
Evaluation Methodology
Participants were involved during the VMW to
assessment criteria under three categories,
which most important issues for assessing
best option. The summary of the assessment
criteria provided by participants were
categorised under function, Social and
Economic, Cultural and Environment
-
7/31/2019 Presentatio VMW
8/19
-
7/31/2019 Presentatio VMW
9/19
-
7/31/2019 Presentatio VMW
10/19
-
7/31/2019 Presentatio VMW
11/19
There were two options (option A & B) presented by the Participants of the
workshop. Each group assessed by the group qualitatively against weighted criteria.
A result of the options according to qualitative matrix exposed in bellow and rated
Excellent (E), Very Good (VG), Good (G), Fair (F), Poor (P) against each assess criteria.
-
7/31/2019 Presentatio VMW
12/19
The Quantitative and Qualitative information collected by the
VMW team members
-
7/31/2019 Presentatio VMW
13/19
After review the quantitative and qualitative
information finalized they recommended which
option would be preferred.
Group 1:-
Option B was recommended for further
development; Better supported to the community.
More easy to construct.
Better environment available.
High safety.
-
7/31/2019 Presentatio VMW
14/19
Group 2:-
Option B was recommended for furtherdevelopment;
There are not that much change to the previousgroup recommended.
Better curve to construct near Dubai Autodrome.
Good community feedback support.
For 6 lanes construction cost will be less.
Easy to construct.
-
7/31/2019 Presentatio VMW
15/19
Group 3:-
Group No.3 also recommended Option B for
further development;
Better safety ranking.
Cyclist and Pedestrians get proper area for
drive and walk.
Traffic impacts appear to be manageable.
Better value for money solution.
-
7/31/2019 Presentatio VMW
16/19
Group 4:-
This group also recommended Option B only
suitable for further development;
Safety is good
Control noise impact. Visually better due to motor race.
Confirmed as a easy option to construct this
expansion
-
7/31/2019 Presentatio VMW
17/19
When we were analysed all recommendation, the all groups
identified Option B is the best construction way from the value
and quality. Finally identified approximately 25 objectives could
be met in this VMW
Improve Safety.
Minimise disturbance during the construction.
Improve pedestrian friendliness.
Reduce traffic jams.
Reduce noise.
Improve live ability
Facilitate gateway.
Pedestrians and cyclists satisfaction.
Provide Service roads.
Direct path to join sub ways
-
7/31/2019 Presentatio VMW
18/19
Protect heritage.
Good environment for race track. Improve landscaping.
Maximise and extend public transport.
Develop business opportunities.
-
7/31/2019 Presentatio VMW
19/19
Map of Extension Road (E311)