Pres Michael Mei ETS July2013 - Center for Clean Air...
Transcript of Pres Michael Mei ETS July2013 - Center for Clean Air...
阿尔斯通集团 – 低碳技术领导者
梅报春 – 阿尔斯通中国公共政策总监
2013/7/24
发电设备和服务
Alstom电力
轨道交通设备和服务
Alstom交通
电力传输设备和服务
Alstom电网
Alstom可再生能源
三大业务跨越四个行业
Alstom Group presentation – June 2013 – P 2
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
全球领先 —综合电站
全球领先 —空气质量控制系统
全球领先 —水电
全球领先 —电力设施服务
Alstom的发电设备占全球装机容量的25%以上。
Alstom电力:全球电力设备领域的领导者
业 务 遍 及 全 球 市 场 … 无论是新电厂还是装机总量
Alstom Group presentation – June 2013 – P 3
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom与可再生能源:三大“杠杆”
客户资产& 社会 3 levers of product &
portfolio
development
• Efficiency improvement
• Capital cost reduction
• Capacity Factor increase (Renewable)
• Lead Time reduction
• Competitive O&M
• Social & health impacts
• Renewable portfolio
• Natural resource optimisation
• Pollutants control (Sox, Nox, PM, mercury )
• CO2 emission reduction & CCS
• Land-use, Visual Impact, Noise
• Water intensity reduction & Recyclability
• Balanced Portfolio • Maintainability and outage
time reduction • Operational and Fuel
Flexibility • Life time extension and
power uplift • Designs and service for
improved availability • Climate packages
Alstom Group presentation – June 2013 – P 4
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
H J J
H Head Office
R Regional Offices
J Joint Ventures
W Wholly Owned by Alstom
Corporate
Power
Transport
Grid
J W
Beijing H Alstom (China) Investment Co., Ltd
Tianjin
J Alstom Beizhong Power (Beijing) Co., Ltd
J Alstom Yuli (Beijing) Disconnector
R
Shenyang R Shenyang Regional Office
J
W Alstom Hydro China Co., Ltd
R
R
J Xi’an Alstom Yongji Electric Equipment Co., Ltd
Kunming
Chengdu
R Kunming Regional Office
R Chengdu Regional Office
J J
J R Xi’an
J R Wuhan
R Wuhan Regional Office
J Wuhan Boiler Company Ltd.
J Alstom (Wuhan) Engineering & Technology Co., Ltd
SEC Alstom (Wuhan) Transformers Co., Ltd J
J Alstom (Guangdong) Switchgear Co., Ltd
W J
Qingdao
W Alstom Sizhou Electric Power
J Alstom Qingdao Railway Equipment Co., Ltd
J J J
W W W
Shanghai
J SEC Alstom (Shanghai Baoshan) Transformers
J SEC Alstom (Shanghai Lingang) Transformers
J Alstom Shanghai Instrument Transformers
W Alstom Grid China Technology Center
W Alstom Grid Enterprise Management (Shanghai)
W Alstom Grid (Shanghai) Co., Ltd
J J J
J W
J CASCO Signal Ltd.
J Shanghai Alstom Transport Co., Ltd.
J Alstom Shanghai Aohan Energy Recovery
J Shanghai Alstom Transport Electrical
Equipment Co., Ltd
Systems Co., Ltd W Alstom Technical Services (Shanghai) Co., Ltd
J R
W
W
W W
Guangzhou
R Guangzhou Regional Office Shenzhen
W Alstom Strongwish (Shenzhen) Co., Ltd. Hong Kong
W Alstom Power Service (Hong Kong) Ltd.
W Alstom Power Generation Ltd.
W Alstom Hong Kong Ltd.
R Xi’an Regional Office
R Tianjin Regional Office Tianjin
Alstom Hydro Co., Ltd
Equipment (Qingdao) Co., Ltd W
J J
J
J
Wuxi
Suzhou
Yangzhou
J Wuxi Alumin Casting Co., Ltd
J Alstom (Yangzhou) High-Voltage Bus-Ducts Co., Lt
J Alstom Suzhou High-Voltage Switchgear Co., Ltd
J Alstom Disconnector (Wuxi) Co., Ltd
J
Dalian
J Dalian Pyung-IL Cariboni Power Line Products Co., Ltd
10,000 employees
34 legal entities R
W
Alstom Sizhou Boiler Auxiliary
Machinery (Qingdao) Co., Ltd
阿尔斯通在中国的业务分布 Alstom in China Presence
Alstom China Presentation – 2012
Main References - Power in China
• Pingwei III (Anhui) , 2x1080MW, Mar. 12
• Hami (Xinjiang), 2x660MW, Dec. 11
• Shentou (shanxi), 2 x 600 MW, Mar. 10
/ Pingwei II (Anhui)/Dabieshan (Henan), 4 x 600 MW STG SC
Three Gorges/三峡 Ling Ao/ 岭澳
HYDRO POWER 水电 • Guanyinyan (3 x 600MW), Dec. 10
equipment)
/ / Baoquan/Huizhou/Balianhe PSP (16 x 306 MW)
iaowan (6 x 780 MVA generators, with HEC)
BOILERS & ENVIRONMENT CONTROL 锅炉及环境控制系统
CFB
• Shidongkou No.2 Power Plant in Shanghai, 2x600 MW SC Boiler
/ SWFGD: Huaneng Weihai, Huaneng Dalian…
TURNKEY PLANT 交钥匙工程
• C Shajiao “C” (Guangdong), 3 x 660 MW
2x600MW SC
NUCLEAR POWER 核电 核核电 •
•
•
2 x 1750MW STG for Taishan (EPR)
• 4 x 1000 MW Arabelle STG for Hongyanhe
• 2 x 1000 MW STG for Ling Ao 2
/ EDG: Taishan, Changjiang
/ 4 x 1000 MW STG for Daya Bay and Ling Ao
Why an Emission Trading Scheme?
The most cost effective tool to decarbonize
• Prices pollution
• The pre defined “Cap” (target) gives visibility to investors (utilities, industries)
• Cost effective market based mechanism
• Flexible design: addresses most polluting sectors (power, industry)
• Drive investment in innovation and low carbon technologies
• Generate resources needed to address climate change though the sale of allowances
Differences vs
carbon tax? Alstom Group presentation – June 2013 – P 8
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Towards a global carbon price? Emission Trading Schemes popping up
Alstom Group presentation – June 2013 – P 9
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
World Bank Partnership for Market Readiness (PMR)
• The World Bank Partnership for Market Readiness (PMR) provides grant financing and technical assistance for capacity building and piloting of market-based tools for GHG emissions reduction
Country Participants
Brazil Mexico
Chile Peru
Colombia South Africa
Costa Rica Thailand
India Turkey
Indonesia Ukraine
Jordan Vietnam
CCh
hiinnaa
Alstom Group presentation – June 2013 – P 10
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Morocco
Al © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
tom Group presentation – June 2013 – P 1
Cap-and-trade programs differ in scopes and targets
California’s
GHG cap-and-
trade program
Regional
Greenhouse
Gas Initiative
(RGGI)
EU’s
Emissions
Trading
Scheme
Quebec’s
Carbon Market
Gross Regional
Product
US $1.9 trillion US$2.3 trillion US$16 trillion US$304 billion
GHGs covered All Carbon dioxide Carbon dioxide,
nitrous oxide and
perfluorocarbons
All
Sectors covered Electricity and
Industry (2013),
ground
transportation and
heating fuels (2015)
Fossil fuel-fired
power plants
Electricity, heat,
steam production,
industrial sectors,
petrochemicals and
aluminium
Electricity and
Industry (2013),
ground
transportation and
heating fuels (2015)
Emissions Threshold 25,000 metric tons Fossil fuel-fired
power plants
generating 25MW
or greater
Any combustion
installation over
20MW; sector-
specific threshold for
other sources
25,000 metric tons
Target Approx. 17% below
2013
emissions by 2020
10% below 2009
emissions by 2018
21% below 2005 levels
by 2020
20% below 1990 lvels
by
2020
Maximum
Emissions
Allowance
Availability
394.5 million metric
tons (2015)
171 million metric
tons (2009)
2039 million metric
tons (2013)
63.3 million metric
tons (2015)
Offset limit s
8% 1
3.3% Some type exclusions 8%
Alstom Group presentation – June 2013 – P 12
Focus on China National ETS on its way
• 12th Five Year Plan (2010-2015)
• Pilots in 5 cities and 2 provinces
• Shenzhen (launched 18th June)
• Shanghai
• Beijing
• Guandong Province
• Hubei Province
• Tianjin
• Chongqing
• Covering up to 2.2 billion tons of CO2 over 3 years (2013-15)
=> About 25% China’s CO2
• 13th Five Year Plan (2016-2020)
• Planned launch of national ETS • NDRC currently laying the
groundwork
• National Registry system
• Emission accounting guidelines for:
- Power
- Aviation
- Glass + cement
- Iron + Steel
- Non ferrous metals
- Chemicals
• Offsetting mechanism
- Chinese Certified Emissions Reductions
(CCER)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Group pres ntation – June 2013 – P 13
Overview of China’s ETS pilot schemes
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Beijing Tianjin Shenzhen Guangdon
g
Province
Chongqing Hubei
Provinc
e
Shanghai
Industries/ sectors Electricity,
petrochemical,
automobile,
public buildings
Electricity, Iron
and steel,
petrochemical, oil
and gas
production
26 Industry
sectors including
electricity,
electronics and
manufacturing
Electricity,
petrochemica
l, iron and
steel
Electricity,
heat,
chemical
engineering,
minerals
Iron and steel,
chemical
engineering,
auto and
electricity
Iron and steel,
petrochemical,
building material
and non-industrial
sectors
Inclusion threshold Annual emission
over 10,000 tons
from
2009-2011
Annual emissions
over 20,000 tons
in any year since
2011
Enterprises with
emissions over
10,000 tons
(2009-
11) and buildings
over 5,000 tons
(2009-11)
Annual
emissions over
20,000 tons
from 2011-14
Enterprises
with annual
emissions over
20,000 tons
from 2008-10
Annual energy
consumption of
over 60,000 tons
of standard coal
Industrial sectors
annual emissions
over 20,000tons
(2010-11) and
non- industrial
over 10,000 tons
(2010-
11)
Allowance allocation Free allocation
with small
amount of
auction
Free allocation
with small
amount of
auction
Free allocation
(initial stage),
paid allocation
(later stage)
Free allocation
with auction
where
appropriate.
Benchmarking
for mature
industries
Free allocation
of annual
allowances
between 2013-
15
Free allocation
(initial stage),
paid allocation
(later stage)
Shift to
benchmarking
when data is
available
Free allocation
(initial stage) with
auction where
appropriate. Free
allocation 2013-
15.
Trading parties Liable enterprises,
legal/ natural
person
Liable
enterprises,
market players
Liable
enterprises,
developers of
emissions
reduction
projects
Liable
enterprises,
GHG VER
project owners,
investors
Liable
enterprises,
organisations
and groups
Liable
enterprises,
participator fit for
CCER
management
measures
Liable
enterprises,
other eligible
enterprises,
organisations or
individuals
Trading products Spot
allowances,
CCER, Credits
of Beijing
offset
mechanism
Spot
allowances,
CCER
Spot
allowances,
CCER, Credits
of Shenzen
offset
mechanism
Spot
allowances,
CCER, Credits
of Guangdong
offset
mechanism
Spot
allowances,
CCER, Credits
of Chongqing
offset
mechanism
Spot
allowances,
CCER
Spot
allowances,
CCER
Trading platform Beijing
Environment
al Exchange e
Tianjin
Climate
Exchange
Shenzen
Emission Rights
Exchange
Guangzhou
Carbon
Emissions
Rights Trading
Exchange
Chongqing
United Assets
and Equity
Exchange
Exchanges
authorized
and
established
by provincial
governments
Shanghai
Environment
Energy Exchange
How does carbon pricing through ETS affect
investment decision and Alstom offering
development?
1 27
80 62
60
84
104
120 131
152
166
189
207
0
20
40
100
120
140
160
180
200
220
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Mill
ion
to
ns
CO
2/y
ea
r
ALSTOM RENEWABLE POWER
ALSTOM THERMAL POWER
~25% p.a.
CAGR
Alstom Power: concrete results - CO2 reductions (cumulated for 2011, based on first year of operation values)
Alstom Group presentation – June 2013 – P 15
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
1,445 projects accounted covering 2002-2011
How does carbon pricing affect investment decisions?
Alstom Group presentation – June 2013 – P 16
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
• Drive investment in no and low carbon technologies for new build and trigger investment in retrofit :
• towards supply-side efficiency • towards mature technologies (ex: on shore wind) • towards R&D in tomorrow’s technologies (non yet mature), thanks to
expectation of high carbon price (ex: CCS, ocean energy)
• Low carbon technologies compete more effectively: technology choices
• May influence geography of investments
• Free allocation and carbon leakage prevention • Stronger carbon price
Carbon pricing and investment decisions Exemple of the EU ETS / EUA price
0
5
10
15
20
25
30
35
janv.-05 janv.-06 janv.-07 janv.-08 janv.-09 janv.-10 janv.-11 janv.-12 janv.-13
ECX EUA Dec Ahead
ECX CER Dec Ahead
Phase 1 Phase 2
Increased interest in
renewables and gas Increased interest in
CCS
Fuel switching from
gas to coal
Energy efficiency 1
2 3 4 Alstom Group presentation – June 2013 – P 17
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon pricing and investment decisions New technology improves efficiency and reduces emissions 1
Alstom Group presentation – June 2013 – P 18
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon pricing and investment decisions Supply-side energy efficiency
60% of the 2030 installed base still to be built
60% of Carbon emitted in 2030 will come from today’s installed base
Gas: +20 p.p in efficiency saves
33% CO2 emissions
Coal: +20 p.p in efficiency saves
40% CO2 emissions
Plant Optimisation: -5%
CO2
Turbine retrofit: -5%
CO2
Boiler retrofit: -3%
CO2
New plants
Retrofit
1
Alstom Group presentation – June 2013 – P 19
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Source: CDC Climat, Rôle du signal prix du carbone sur les décisions d’investissements des entreprises , Thesis of M. Herve
Mignucci, 2012 www.cdcclimat.com/IMG//pdf/12-01-25_these_morgan_herve-mignucci_version_finale-2.pdf Alstom Group presentation – June 2013 – P 20
Changes in attributable capacity over 2004- 2009 in EU+EEA
(additions, removals, net effect) in GW
Carbon pricing and investment decisions Fuel switching
2
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Group presentation – June 2013 – P 21
Carbon pricing and investment decisions Alstom products development roadmap in Renewable Power
Geothermal
Offshore Wind
Haliade™ 150 - 6MW ECO 100
Solar Plants
Ocean Wave Energy
2015
Variable speed
Pumped Storage
ECO 110
Biomass
ECO 122
A CONTINUOUS NEW OFFERING PIPELINE
Legs:
Hydro, Geothermal
Biomass
2008 2009 2010 2011 Future
Hydro
Ocean Tidal Energy
2014
2
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon pricing and investment decisions Alstom offshore wind factory in France
2
• Carbon pricing schemes can be complemented by other climate policies
(ex Renewable target in the EU in 2020)
• We take these policy instruments as a signal for market development
• We determine our plans for capital investment and employment
• French offshore tender
• 4 factories to be built
• 4000 thousand jobs (direct and indirect)
Alstom Group presentation – June 2013 – P 22
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon price and implications for tomorrow’s technologies CCS development 3
Alstom Group presentation – June 2013 – P 23
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom development of Carbon Capture & Storage (CCS)
Pre-combustion
Alstom is developing several CO2 capture technologies to address new plants and existing installed base
Post-combustion
Integrated solutions
Oxy-combustion
• Advanced Amine
• Chilled Ammonia • New plants
• Retrofit
• CCS ready plants (storage covered with
partners)
AL
ST
OM
FO
CU
S
• Oxy combustion
• Chemical Looping
Combustion
3
Alstom Group presentation – June 2013 – P 24
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
测试完成
AEP Mountaineer 美国 - 58 MWth 冷却氨, 煤
EoN Karlshamn 瑞典 - 5 MWth 冷却氨, 煤
WE - Energie 美国 WI - 5 MWth 冷却氨, 煤
DOW Chemical Co. 美国, WV 高级胺 – 煤
Vattenfall Schwarze Pumpe 德国 - 30 MWth, 氧 – 褐煤
Total Lacq 法国 - 30 MWth 氧 – 气
Alstom BSF Windsor 美国 - 15 MWth 氧 - 煤
2nd Gen
DOE/ Alstom Windsor 美国 - 3 MWth 化学链 - 煤
Alstom Labs Växjö 瑞典 – 0.25 MWth Post C.-multi purpose
2nd Gen
RFCS EU - Darmstadt 德国 - 1 MWth 化学链, - 煤
TCM Mongstad
挪威 40 MWth,
冷却氨, 热点联合&炼油废气(RCC)
Alstom GPU Pilot (Mobile) 0.3 MWth
试运行
EDF Le Havre 法国 - 5 MWth 高级胺 – 煤
大型项目 (正在开发)
White Rose CCS Project 英国 - 426 MWe 氧 无烟煤
示范项目
正在运行
CCM Mongstad (Gas Turbine based CHP) 挪威 – 280 MWe + 350 M Wth 冷却氨
Getica - CET Turceni 罗马尼亚 - >250 MWe 冷却氨 – 褐煤
Alstom碳捕获与碳封存技术的发展 (CCS) 3
Alstom Group presentation – June 2013 – P 25
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon pricing and investment decisions From gas to coal 4
Underuse or mothball of gas plants in
Europe
Investments outside Europe or in EU
Member States where carbon tax (UK)
Ex: Latin America
Increase of coal fired plant production
and consequence on climate change
mitigation
Alstom Group presentation – June 2013 – P 26
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
0
2013 2015 2017 2019 2021 2023 Source: IHS CERA
High gas efficiency: 51.4%; Low gas efficiency: 46.8%. High coal efficiency: 38.1%; Low coal efficiency: 34.3%
10
20
30
40
50
60
2025 2027
Real 2011
euros per
metric ton of
CO2
Reference case (20% 2020 target with phase 4)
No supply intervention
UK effective carbon price (2011Eur/tCO2)
Price to enable fuel switching - High gas / Low coal efficency
Price to enable fuel switching - Low gas / High coal efficency
Alstom Group presentation – June 2013 – P 27 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or cPorrreect sorewnill taapptlyitoo nanytpiatrtliceula-r p0roj1ect/. T0hi1s w/il2l d0ep0en7d on-thPe tec2hn7ical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Carbon price outlook and implications for fuel switching EU ETS
Today EUA price c. €4
www.alstom.com
With Alstom, preserve the environment.
Is printing this presentation really necessary?