Total 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 Year 

47,711 4,800 6,000 4,800 3,600 4,100 2,050 3,950 8,067 3,145 1,719 5,480 MW

2014-2024 ADD-ON POWER CAPACITY

182014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

110,000

Annual 4,260 MW add-on power in average

MW Generation Projects Plan

Power Generation Projects up to 2024

Page 3: Power Generation Projects up to 2024

3

TYPICAL SCOPE OF WORK

Power Generation Projects up to 2024

A- Simple Cycle UnitsIt is only Gas Turbine Generator (GTG) units with all related Balance

of Plant (BOP). Generally, the simple cycle plants we use “E” class GTG.

B- New CC Power Plants:It is green field projects and the typical Gas Turbine class is “F” as

minimum. The HRSG is open type for plants operating on NG (Natural Gas) and Vertical type for plants operating on oil with two or three pressure levels as general.

The typical scope of work for SEC projects as following:

Page 4: Power Generation Projects up to 2024

4

TYPICAL SCOPE OF WORK

Power Generation Projects up to 2024

C- Conversion Projects : Converting the existing simple cycle plant to a combined cycle

plant. The conversion is done by adding the Heat Recovery Steam Generator (HRSG), Steam Turbine (STG) and related equipment for example Air Cooled Condenser (ACC) to the existing Gas Turbine (GTG).

The conversion configuration is variable from plant to other, and typically 3+3+1 or 4+4+1.

The conversion projects all are brown field projects.

D- Steam Power PlantsCurrently SEC changed the design of the power boilers from Sub-

critical to Super-Critical boilers (>220 Bar & 540 Co), the typical configuration is 4 boilers with 4 STG.

Moreover, the ESP and the FGD becomes must as the used fuel is Heavy Fuel Oil (HFO) with high Sulfur SOx content.

Page 5: Power Generation Projects up to 2024

5

TYPICAL SCOPE OF WORK

Power Generation Projects up to 2024

Examples of main Services needed for future projects:

• Engineering, Procurement and Construction (EPC) work (Consortiums and JV are acceptable)

• Engineering work (Consultants)• Construction / Erection work• Electric work• I&C work• Mechanical work• None Destructive Testing (NDT) work

Page 6: Power Generation Projects up to 2024

6

TYPICAL SCOPE OF WORK

Power Generation Projects up to 2024

Examples of main Equipment / Systems needed for future projects:

• Gas Turbines Generator (GTG)• Heat Recovery Steam Generators (HRSG)• Steam Turbines Generator (STG)• Synchronous Generators• Transformers (GSU, SST and UAT)• Condensers (Air and Wet)• Switchgears (including all related components)• Distribution Control System (DCS)• Pumps (Water, Fuel and additives)• Motors• Compressors (Air and Gas)

Page 7: Power Generation Projects up to 2024

7

Power Generation Projects up to 2024 A- SIMPLE CYCLE UNITS [In Isolated Power Plants]

Project 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 20241. Arar Ext 154 2. Sharorah Ext 128 60 60 3. Qurayat Ext 154 4. Rafha Ext 77

Total 633 MW

• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014

Projects Status Under construction Under bidding Planned Sub-Total 513 0 120

Total 633 MW

Page 8: Power Generation Projects up to 2024

8

B- COMBINED CYCLE PROJECTSProject 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

1. Qurayyah PP (ST) 500 2. PP 12 1310 682 3. Deba PP 600 4. PP 13 1165 582 5. Shuaiba PP 488 6. PP 14 1755 7. North Qassim PP 1800 8. South Madinah PP 3600 1800 9. Wad Al Shamal PP 1050

10. PP 15 1800 1800 1800 11. PP 16 1200 600 120012. Al Hotah (Al Kharj) PP 500 13. Al Rays PP 1800 180014. Ras Abu Qumais PP 1800 1800 15. Ras Al Khair PP 1800 1800 1800

Total 35,032 MW

Power Generation Projects up to 2024

• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014

Projects Status Under construction Under bidding Planned Sub-Total 6,482 1,650 28,700

Total 36,832 MW

Page 9: Power Generation Projects up to 2024

9

B- COMBINED CYCLE PROJECTS

Power Generation Projects up to 2024

17%

5%

78%

Under construction Under bidding Planned

Page 10: Power Generation Projects up to 2024

10

C- CONVERSION PROJECTSProject 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

1. PP 10 (ST) 345 806 2. Qassim PP Conversion 360 3. Hail PP Conversion 120 4. PP 9 & Faras PP Conversion 240 250 5. Tehama PP Conversion 200 6. Wadi Al Dawassir PP Conversion 90

Total 2,411 MW

• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014

Power Generation Projects up to 2024

Projects Status Under construction Under bidding Planned Sub-Total 1,631 240 540

Total 2,411 MW

68%

10%

22%

Under construction Under bidding Planned

Page 11: Power Generation Projects up to 2024

11

D- STEAM POWER PLANT PROJECTS

14

Project 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

1. Rabigh 6 PP 2555

2. South Jeddeh PP 1980 660

3. Shugaig PP 2640

Total 7,835 MW

Power Generation Projects up to 2024

• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014

Projects Status Under construction Under bidding Planned Sub-Total 7,835 0 0

Total 7,835 MW

Page 12: Power Generation Projects up to 2024

12

GENERATION PROJECTS SUMMARY UP TO 2024

Total (MW)

Planned (MW)Under

Bidding (MW)

Under Construction

(MW)Owner

Conversion CC GT

47,711540 28,700 120 1,890 16,461 SEC

29,360(60 %)

1,890(4%)

16,461(36%) Total

17

Power Generation Projects up to 2024

36%

4%

60%

Under construction Under bidding Planned

Page 13: Power Generation Projects up to 2024

13

SEC Planned Projects totaling 47,711 MW comprising of:A- Simple Cycle Units: 633 MW C- Conversion Projects:

2,411 MW B- New CC Power Plants: 36,832 MW D- Steam Power Plants:

7,835 MW

Power Generation Projects up to 2024

5%

77%

17%

1%

Conversion Projects New CC Power Plants Steam Power Plants Simple Cycle Units

Page 14: Power Generation Projects up to 2024

14

16

1. PP92. PP10 CC

(ST)3. PP124. PP135. PP146. PP157. PP168. AlHotah

PP

Hail PP Conversion

Arar Ext.

Qurayat Ext.

Rafha Ext.

Faras PP Conversion

Sharorah Ext

Shugaig PP

Tehama PPConversion

Wadi AlDawassir PP Conversion

Deba PP

Shuaiba PP

Rabigh 6

Jeddah South

Madinah South

Waad Alshamal 1. Qassim CC

Conversion2. Qassim North

Qurayah CCPP (ST)

AlRays PP

Ras Abu Qumais PP

Ras Alkhair PP