Mostafa-Rohaem

3
Mostafa Mohamed Ali Raheem El Feel Personal Information Date of birth: 11/1/1992 Address: 99-Hafez Wahbe st.,-Tanta -Egypt Mobile: +201289885905 E-mail: [email protected] Objectives: Working in a progressive organization which can expand all my knowledge and provided me opportunities to utilize my skills and qualification to be effective in productive development environment. Education: University: Tanta University Faculty: Civil Engineering Graduation year: 2014 Grade : Good (72.5%) Graduation Project: Excellent Role: Leader Graduation project team Project Field: Design of Concrete Structure. Duration: 5 months. Description: 1- First Module is designing all elements for compound consist of 11 typical stories and ground story and basement Under Earthquake loads . 2-Second Module is designing a Long span covering five Halls with (Arch slap, Arch girder,Hollow block slap,Frames,Skew panelled Beams). 3-Third Module is designing Circular Elevated Tank. Evaluation: Excellent with grade 96.66 %. Success Story: We are asked to make a Skew panelled Beams to Cover 750 m2 which Contradicts with Skew panelled Beams Limit (450 - 500) m2 so we in overcome this limit by Modify Panelled beams system to adapt the situation.

Transcript of Mostafa-Rohaem

Mostafa Mohamed Ali Raheem El Feel

Personal Information Date of birth: 11/1/1992 Address: 99-Hafez Wahbe st.,-Tanta -Egypt

Mobile: +201289885905

E-mail: [email protected]

Objectives:

Working in a progressive organization which can expand all my knowledge and provided me opportunities to utilize my skills and qualification to be effective in productive development environment. Education: University: Tanta University

Faculty: Civil Engineering

Graduation year: 2014

Grade : Good (72.5%)

Graduation Project: Excellent

Role: Leader Graduation project team

Project Field: Design of Concrete Structure.

Duration: 5 months.

Description:

1- First Module is designing all elements for compound consist of 11 typical

stories and ground story and basement Under Earthquake loads .

2-Second Module is designing a Long span covering five Halls with (Arch slap, Arch girder,Hollow block slap,Frames,Skew panelled Beams).

3-Third Module is designing Circular Elevated Tank.

Evaluation: Excellent with grade 96.66 %. Success Story: We are asked to make a Skew panelled Beams to Cover 750 m2

which Contradicts with Skew panelled Beams Limit (450 - 500) m2 so we in overcome this limit by Modify Panelled beams system to adapt the situation.

High school: El Ahmadeya Secondary School,Tanta,Egypt

High school grade: 97.5% Technical Knowledge: Microsoft Excel , Autocad ,Sap ,Word ,Shop Drawing. Soft Skills:

Team work

Work under pressure

Creative thinking

Ability to learn quickly

Languages:

Arabic (native language).

English (very good).

Training: Company: Kasaab company Company: Arab contractors

Start date: July/2011 Start date: July/2012 End date: August/2011 End date: October/2012

Role: Site Engineer Role: Site Engineer

Job description: Checking and approving Job description: Checking and

All Civil Items According To Specification approving all civil items according to specification.

Company: Cairo Oil Refining. Role: Site Engineer Start date: July/2013 End date: August/2013 Job description: The main task is preliminary design for concrete dimension, creating and analyzing the Structural model on Sap for design vertical elements (Columns, cores and shear walls…..,etc.) SAFE for design of slabs & foundation (Flat slab, solid slab, , shallow Foundation), Technology used: (AutoCAD – SAP – PCA Column). Experience: Civil engineer at Al-Qema construction company. Start date: August/2014 Role: Civil Engineer

Job description:

-Site managing and execution for civil works, which includes structural and finishing

works. -Responsible for all technical office in site works. That include: quantity surveying and project scheduling. -New sub-contractors agreements and credence of materials and shop drawings submitted by me. -Responsible for all contracts and sub-contractors invoices.

-Work with the electrical and plumbing installation in building according to the drawings. Projects:

Project Name: Tower of Al hoda

Project Idea: Construction tower of hoda which consist of 6 typical with basement.

Project Date: September 2014 to february 2014.

Project Name: Towers of Al-Qema.

Project Idea: Construction towers of Al-Qema on area 1500 m2 which consist of basement

and ground and 9 typical stories and 25% services.

Project Date: March 2015 to present.

Any documents are available upon request.