    Improvement proposals by Regular employees

    As of June 2013 : 467 proposals

  • 7/27/2019 Kaizen Presentation 07182013

    5/35

    2

    91

    49

    107 108 110

    0

    20

    40

    60

    80

    100

    120

    JAN FEB MAR APRIL MAY JUNE

    Start seminar

    about MUDA

    108REGULAR

    EMPLOYEES

  • 7/27/2019 Kaizen Presentation 07182013

    6/35

    Provide rolling

    ladders to reduce

    loss time of materialpreparation.

    Improve lot

    number holder for

    traceability.

    Sample of

    Improvement Proposals

  • 7/27/2019 Kaizen Presentation 07182013

    7/35

  • 7/27/2019 Kaizen Presentation 07182013

    8/35

    Transportation

    Inventory

  • 7/27/2019 Kaizen Presentation 07182013

    9/35

    Over

    production

    Overprocessing

  • 7/27/2019 Kaizen Presentation 07182013

    10/35

    Waiting

    Motion

  • 7/27/2019 Kaizen Presentation 07182013

    11/35

    Defects

  • 7/27/2019 Kaizen Presentation 07182013

    12/35

  • 7/27/2019 Kaizen Presentation 07182013

    13/35

  • 7/27/2019 Kaizen Presentation 07182013

    14/35

    Name Section MUDA Focus Topic

    Glo Villanueva Production Over process Combine two checksheets

    Jhoe Montegrande Production Transportation Relocation of Soldering

    process

    Carlos Garcia Production Transportation Relocation of EM assembly

    Loida Patricio Production Transportation Relocation of Repairing table

    Leny Acua Production Over process Holder for stock control

    Rona Fortuno Production Over process Reduce size of printed copies

    Sam Autida Production Motion Relocation of EM fastening

    machine

    Cleiford Serenio Production Over process Reduce Excel encoding thru

    scanning

    Cess Borlongan Production Defect Organize location of packing

    process

    Lito Legaspi Production Transportation Relocation of danpla

    Joseph Pabilando Process Engineering Transportation Relocation of material rack

    Lei Sta Rita Process Engineering Waiting Make schedule table for

    process review

    Kathleen Ito Purchasing Waiting Keyboard application

  • 7/27/2019 Kaizen Presentation 07182013

    15/35

  • 7/27/2019 Kaizen Presentation 07182013

    16/35

  • 7/27/2019 Kaizen Presentation 07182013

    17/35

  • 7/27/2019 Kaizen Presentation 07182013

    18/35

  • 7/27/2019 Kaizen Presentation 07182013

    19/35

    36 sec38 sec

  • 7/27/2019 Kaizen Presentation 07182013

    20/35

    New Location of

    Magnetize Process

    and PartsPreparation17 sec

    9 sec

  • 7/27/2019 Kaizen Presentation 07182013

    21/35

  • 7/27/2019 Kaizen Presentation 07182013

    22/35

    FACTORS BEFORE AFTER

    LAYOUT 2 LINE SINGLE LINE

    DISTANCE 70.0 meters 11.4 meters

    STOCKS PER CRATES 2 BASKET

  • 7/27/2019 Kaizen Presentation 07182013

    23/35

  • 7/27/2019 Kaizen Presentation 07182013

    24/35

    Machine

    NumberOperator

    ModelDate

    Produced

    Qty

  • 7/27/2019 Kaizen Presentation 07182013

    25/35

    OperatorModel

    Date

    Produced

    Qty

  • 7/27/2019 Kaizen Presentation 07182013

    26/35

    Repeated

    record of data

    that needs to

    fill-up on both

    checksheets.

  • 7/27/2019 Kaizen Presentation 07182013

    27/35

    Machine

    Number

    OperatorModelDate

    Produced

    Qty

  • 7/27/2019 Kaizen Presentation 07182013

    28/35

  • 7/27/2019 Kaizen Presentation 07182013

    29/35

    BEFORE AFTER

    PAPER COST/DAY $0.2036 pcs. usage / day

    $0.10

    18 pcs. usage / day

    PRINTING COST/DAY $4.18

    36 pcs. usage / day

    $2.09

    18 pcs. usage / day

    TIME CONSUMED 3.79 mins 2.55 mins.

  • 7/27/2019 Kaizen Presentation 07182013

    30/35

  • 7/27/2019 Kaizen Presentation 07182013

    31/35

    Bushing

    insertion

    Adjustment

    of bushing

    Length

    checking

    Adjustment

    of bushing

    Length

    checking

    4 sec.Soldering

    process

    Fastening

    process

  • 7/27/2019 Kaizen Presentation 07182013

    32/35

    Bushing

    insertion

    Adjustment

    of bushing

    Length

    checking

    Soldering

    process

    Adjustment

    of bushing

    Length

    checking

    Fastening

    process

    Eliminate the

    2 process

  • 7/27/2019 Kaizen Presentation 07182013

    33/35

  • 7/27/2019 Kaizen Presentation 07182013

    34/35

    We learn to make efficient and effective in

    our work that helps to make productive.

    As a leader we are dedicated and more

    determine to disseminate the knowledge to

    our subordinates to apply in their workplace.

  • 7/27/2019 Kaizen Presentation 07182013

    35/35

    THANK YOU!