Transcript of Kaizen Presentation 07182013
-
7/27/2019 Kaizen Presentation 07182013
1/35
-
7/27/2019 Kaizen Presentation 07182013
2/35
-
7/27/2019 Kaizen Presentation 07182013
3/35
-
7/27/2019 Kaizen Presentation 07182013
4/35
Improvement proposals by Regular employees
As of June 2013 : 467 proposals
-
7/27/2019 Kaizen Presentation 07182013
5/35
2
91
49
107 108 110
0
20
40
60
80
100
120
JAN FEB MAR APRIL MAY JUNE
Start seminar
about MUDA
108REGULAR
EMPLOYEES
-
7/27/2019 Kaizen Presentation 07182013
6/35
Provide rolling
ladders to reduce
loss time of materialpreparation.
Improve lot
number holder for
traceability.
Sample of
Improvement Proposals
-
7/27/2019 Kaizen Presentation 07182013
7/35
-
7/27/2019 Kaizen Presentation 07182013
8/35
Transportation
Inventory
-
7/27/2019 Kaizen Presentation 07182013
9/35
Over
production
Overprocessing
-
7/27/2019 Kaizen Presentation 07182013
10/35
Waiting
Motion
-
7/27/2019 Kaizen Presentation 07182013
11/35
Defects
-
7/27/2019 Kaizen Presentation 07182013
12/35
-
7/27/2019 Kaizen Presentation 07182013
13/35
-
7/27/2019 Kaizen Presentation 07182013
14/35
Name Section MUDA Focus Topic
Glo Villanueva Production Over process Combine two checksheets
Jhoe Montegrande Production Transportation Relocation of Soldering
process
Carlos Garcia Production Transportation Relocation of EM assembly
Loida Patricio Production Transportation Relocation of Repairing table
Leny Acua Production Over process Holder for stock control
Rona Fortuno Production Over process Reduce size of printed copies
Sam Autida Production Motion Relocation of EM fastening
machine
Cleiford Serenio Production Over process Reduce Excel encoding thru
scanning
Cess Borlongan Production Defect Organize location of packing
process
Lito Legaspi Production Transportation Relocation of danpla
Joseph Pabilando Process Engineering Transportation Relocation of material rack
Lei Sta Rita Process Engineering Waiting Make schedule table for
process review
Kathleen Ito Purchasing Waiting Keyboard application
-
7/27/2019 Kaizen Presentation 07182013
15/35
-
7/27/2019 Kaizen Presentation 07182013
16/35
-
7/27/2019 Kaizen Presentation 07182013
17/35
-
7/27/2019 Kaizen Presentation 07182013
18/35
-
7/27/2019 Kaizen Presentation 07182013
19/35
36 sec38 sec
-
7/27/2019 Kaizen Presentation 07182013
20/35
New Location of
Magnetize Process
and PartsPreparation17 sec
9 sec
-
7/27/2019 Kaizen Presentation 07182013
21/35
-
7/27/2019 Kaizen Presentation 07182013
22/35
FACTORS BEFORE AFTER
LAYOUT 2 LINE SINGLE LINE
DISTANCE 70.0 meters 11.4 meters
STOCKS PER CRATES 2 BASKET
-
7/27/2019 Kaizen Presentation 07182013
23/35
-
7/27/2019 Kaizen Presentation 07182013
24/35
Machine
NumberOperator
ModelDate
Produced
Qty
-
7/27/2019 Kaizen Presentation 07182013
25/35
OperatorModel
Date
Produced
Qty
-
7/27/2019 Kaizen Presentation 07182013
26/35
Repeated
record of data
that needs to
fill-up on both
checksheets.
-
7/27/2019 Kaizen Presentation 07182013
27/35
Machine
Number
OperatorModelDate
Produced
Qty
-
7/27/2019 Kaizen Presentation 07182013
28/35
-
7/27/2019 Kaizen Presentation 07182013
29/35
BEFORE AFTER
PAPER COST/DAY $0.2036 pcs. usage / day
$0.10
18 pcs. usage / day
PRINTING COST/DAY $4.18
36 pcs. usage / day
$2.09
18 pcs. usage / day
TIME CONSUMED 3.79 mins 2.55 mins.
-
7/27/2019 Kaizen Presentation 07182013
30/35
-
7/27/2019 Kaizen Presentation 07182013
31/35
Bushing
insertion
Adjustment
of bushing
Length
checking
Adjustment
of bushing
Length
checking
4 sec.Soldering
process
Fastening
process
-
7/27/2019 Kaizen Presentation 07182013
32/35
Bushing
insertion
Adjustment
of bushing
Length
checking
Soldering
process
Adjustment
of bushing
Length
checking
Fastening
process
Eliminate the
2 process
-
7/27/2019 Kaizen Presentation 07182013
33/35
-
7/27/2019 Kaizen Presentation 07182013
34/35
We learn to make efficient and effective in
our work that helps to make productive.
As a leader we are dedicated and more
determine to disseminate the knowledge to
our subordinates to apply in their workplace.
-
7/27/2019 Kaizen Presentation 07182013
35/35
THANK YOU!