    EXCURSION REPORT

    ON

    LPG BOTTLING PLANT

    IOCL, BALIDIH,

    BOKARO

    JHARKHAND

    Submitted byASHISH PANDEY

    2010JE0868PETROLEUM ENGG

    SERIAL NO 71

  • 8/12/2019 IOCL BOKARO

    2/16

    ACKNOWLEDGEMENT

    I would especially like to thank Mr. B.P Yadav (Chief Engineer, IOCL

    bottling Plant, Bokaro) for helping us understand the complete procedure of the

    LPG filling process. The various information provided by him helped in making

    this short report. The report quality has also been enhanced because of sharing

    of his practical experience.

    I also take this opportunity to express a deep sense of gratitude to the

    Petroleum Engineering Department, Indian School Mines for arranging this

    excursion.

    I am also obliged to Prof. V P Sharma (Head of the Department,

    Petroleum Engineering Dept, Indian School Of Mines) for the valuableinformation provided by him in the respective fields. I am also grateful to the

    enthusiasm and encouragement provided by him through the course that helped

    me reach the heights for preparation.

    Lastly, I thank the Almighty, my parents and all my friends for theirconstant encouragement without which this assignment would not be possible.

    ASHISH PANDEY

    2010JE0868Petroleum Engg

  • 8/12/2019 IOCL BOKARO

    3/16

    INTRODUCTION

    Indian Oil Corporation Limited, or Indian Oil, is an Indian state-

    ownedoil andgas corporation with its headquarters in New Delhi India. It is theworld's 88th largest corporation, according to the fortune global 500 list, and the

    largest public corporation in India when ranked by revenue Indian Oil and its

    subsidiaries account for a 49% share in the petroleum products market, 31% share in

    refining capacity and 67% downstream sector pipelines capacity in India. The Indian

    Oil Group of companies owns and operates 10 of India's 22 refineries with a

    combined refining capacity of 65.7 million metric tonnes per year. Company entered

    into LPG business in year 1997 in joint venture with Petronet LNG. In FY 2012 IOCL

    sold 75.66 million tonnes of petroleum products and reported a PBT of 37.54 billion,

    and the Govt. of India earned an excise duty of 232.53 billion and tax of 10.68

    billion.

    WHAT IS LPGLPG is a mixture of commercial butane and commercial propane having

    saturated and unsaturated hydrocarbons. LPG is gaseous at normal atmospheric

    pressure, but may be condensed to the liquid state at normal temperature, by the

    application of moderate pressures. Although they are normally used as gases, they

    are stored and transported as Liquids under pressure for convenience and ease of

    handling. Liquid LPG evaporates to produce about 250 times volume of gas. Thus, a

    large quantity of energy can be packed, stored, transported and used in small

    containers.

    Most commonly, LPG cylinders are available in compact 5 kg cylinders for rural, hilly

    and inaccessible areas and 12 kg as well 14.2 kg cylinders for domestic use. For

    commercial and industrial use, 19 kg and 47.5 kgs cylinders areavailable.

    INDIAN LPG SCENARIO

    Fourth largest consumer of LPG in the world after USA, China & Japan Thirdlargest consumer In domestic sector in the world after China & USA Major market of

    LPG is Domestic Sector Home Delivery of 3 Million LP Gas cylinders per day(i.e900

    Million/ year) Steady Growth @ 8% p.a.in LPG Consumption in India LPG According to

    the latest scenario of the Natural Gas Analysis, the Natural Gas market in India is

    expected to be the one of the fastest growing in the world during the next two

    decades. Among its segments LPG has made a substantial progress to become the

    most convenient, cost effective and pollution free means of fuel, especially in the

    middle class segment. LPG market in India is not at all versatile and competitive.

    http://en.wikipedia.org/wiki/Petroleumhttp://en.wikipedia.org/wiki/Natural_gashttp://en.wikipedia.org/wiki/Natural_gashttp://en.wikipedia.org/wiki/Petroleum
  • 8/12/2019 IOCL BOKARO

    4/16

    INDANE GAS

    Indane is today one of the largest packed-LPG brands in the world and has

    been conferred the coveted Consumer Superbrand status by the Superbrands

    Council of India.

    Having launched LPG marketing in the mid-60s, IndianOil has been credited

    with bringing about a kitchen revolution, spreading warmth and cheer in millions of

    households with the introduction of the clean and efficient cooking fuel. It has led to

    a substantial improvement in the health of women, especially in rural areas by

    replacing smoky and unhealthy chulha. Indane is today an ideal fuel for modern

    kitchens, synonymous with safety, reliability and convenience.

    With the status of an exclusive business vertical within the Corporation, the

    Indane network delivers 1.2 million cylinders a day to the doorsteps of over 53 million

    households, making IndianOil the second largest marketer of LPG globally, after SHV

    Gas of The Netherlands. Indane is available in compact 5 kg cylinders for rural, hilly

    and inaccessible areas, 14.2 kg cylinders for domestic use, and 19 kg and 47.5 kg for

    commercial and industrial use.

    LPG is a blend of Butane and Propane readily liquefied under moderatepressure. LPG vapour is heavier than air; thus it normally settles down in low-lying

    places. Since LPG has only a faint scent, a mercaptan odorant is added to help in its

    detection. In the event of an LPG leak, the vapourisation of liquid cools the

    atmosphere and condenses the water vapour contained in it to form a whitish fog,

    which is easy to observe. LPG in fairly large concentrations displaces oxygen leading

    to a nauseous or suffocating feeling.

  • 8/12/2019 IOCL BOKARO

    5/16

    OVERVIEW OF PLANT OPERATIONS IN LPG (LIQUIFIED PETROLEUM

    GAS) BOTTLING PLANT

    LPG bottling plant is a plant where LPG is filled into bottles (cylinders) forstorage and distribution among various LPG distributors. The plant has the facility to

    receive bulk LPG by Tank trucks (of various capacities e.g. 12MT, 17MT etc) or

    pipeline from a reliable source e.g. Refinery or any other LPG Bottling Plant. After

    receipt of Bulk LPG, filling of LPG into cylinders is done. Here we shall discuss the

    filling operations in LPG Bottling Plant.

    OVERVIEW OF PRIMARY OPERATIONS:

    Primary Operations in a Bottling plant are main line activities, directly

    associated with filling of LPG cylinders. Any obstruction in these activities will hamper

    Plant production. Some activities are Cylinder receipt, filling, Check scale weighing,

    Tightness testing etc. These are described below:

    STAGE - I: RECEIPT OF CYLINDERS

    Explanation:

    (a) Incoming cylinders fall into following categories:

    (info) New cylinders from manufactures

    Cylinders in circulation from distributors (empty, under-filled, defective).

    Cylinders received from Statutory Testing Plants, duly tested.

    Repaired cylinders received from the approved repairers.(b) All cylinders received should be against valid documents and the actual receipt

    should be tallied with the details on the relevant document and shortages or any

    other shortcomings should be endorsed on the body of the document.

    (c) All new cylinders received should be supported by Test Certificate for ISI (Indian

    Standards Institute) inspection and approval from CCE (Chief Controller of

    Explosives) before they are put to use.

    STAGE -II: VISUAL INSPECTION/SEGREGATION - I

    Explanation:(a) Based on visual inspection, cylinders should be segregated as under:

    (i.) Cylinders for Statutory Testing (to be sent to testing Plant).

    (ii.) Under-filled cylinders received from distributors, duly tagged (for further

    processing).

    (iii.) Leaky/defective cylinders received from the distributors, duly tagged (for

    further processing)

    (iv.) Spurious cylinders (for investigation/scrap).

    (v.) Cylinders found unfit for filling (beyond repairs) on visual inspection (e.g.

    heavily rusted or heavily dented).

    (vi.) Cylinders found defective, but repairable such as:

  • 8/12/2019 IOCL BOKARO

    6/16

    a. Cylinders having twisted valve spindle (to be segregated for valve

    replacement)

    b. Cylinders having broken/bent foot ring/valve protection ring (to be

    segregated for cold/hot repairs depending upon the condition).(To be rejected as

    scrap after closer re-examination).

    (vii.) Cylinders owned by other marketing companies, wrongly mixed with own

    cylinders. (to be segregated for handing over to OMC).(viii.) (a) Empty cylinders fit for filling. (to be sent for filling).

    (b) Visual inspection of the cylinders should be done.

    (c) Under-filled cylinders received from the distributors should be weighed

    to verify the extent of under-filling.

    (d) Reasons for leaky/defective cylinders received from distributors should

    be verified as marked on the tag attached to the cylinder.

    (e) Extra care should be exercised to check for spurious cylinders and

    efforts made to identify the source of receipt. Spurious cylinders must be segregated

    for scraping.

    (f) New cylinders or cylinders received from Statutory Testing Plant or any

    cylinder which has undergone pneumatic test must be purged before they are taken

    up for filling.

    (g) Cylinders due for Statutory Testing must not be taken up for filling but

    sent to testing Plant.

    (h) Cylinders without proper markings or without serial number should not

    be taken up for filling.

    (info) Cylinders of other marketing companies, unless specifically sent for filling,

    should not be taken up for filling but segregated for exchange with concerned

    marketing company.(j) Wherever on-line facilities on the conveyor for cleaning and re-painting of

    cylinders are provided within the filling Plant, segregation for these operations also

    would be necessary.

    (k) At the time of visual inspection during unloading, check should be made

    for shortage of removable items such as valve protection caps, security nuts, safety

    caps, etc., and appropriate remarks put on the relevant transfer documents.

    STAGE - III: CYLINDER FOR FILLING.

    Explanation:(a) Remove valve protection cap wherever provided on the cylinder.

    (b) Remove safety cap in case of 'SC' type valve (Self Closing Valve).

    (c) Blow the cavity of 'SC' type valve with air to remove any dust particles or water

    and also check for the presence of 'O'-ring fixed on the valve outlet.

    STAGE - IV: TARE WEIGHT MARKING

    Explanation:

    (a) Wherever tare weight stenciling is not legible on the cylinder shoulder, mark

    tare weight on the cylinder shoulder after checking punched tare weight marking on

    the cylinder.

  • 8/12/2019 IOCL BOKARO

    7/16

    (b) For accuracy of filling, especially in case of filling through overall-weight-system,

    the correct and legible marking of tare weight on the cylinder body is essential. To

    ascertain the accuracy of tare marking on the incoming LPG cylinders, few cylinders

    should be weighed at random. This exercise should invariably be carried out on the

    new cylinders. In case any major discrepancies are observed in a particular lot the

    matter should be taken up with the manufacturer.

    (c) Tare weight, in case of cap type cylinders, is exclusive of the weight of the cap.In case of cylinders with shroud or ring as valve protection means, the tare weight

    includes the weight of the shroud or the ring as they form integral part of the

    cylinder.

    STAGE - V: FILLING OPERATION

    Explanation:

    (a) Cylinder with 'SC' type valve.

    i. Fix appropriate filling head on to the valve.

    ii. Start filling.

    iii. Make tare-weight adjustment.

    iv. Remove filling head on automatic shut-off the filling operation.

    (b) Each filling machine should be checked against standard weight at least once

    during a shift.

    (c) The above sequence of operations of operations has been described for filling

    machines having adjustment for 'tare weight' as well as 'specific weight" for the

    product (i.e. LPG)

    (d) In case the filling machines operate on 'gross weight' principle, the adjustment

    required on the machine would be for gross weight only.

    (e) In case the filling machines operate on 'tare-off' principle, no adjustment maybe required. However, in this case it must be ensured that the cylinders are

    evacuated or safely drained before putting on to the filling machine.

    STAGE - VI: CHECK WEIGHING

    Explanation:

    (a) Weigh all filled cylinders coming out of the carousel, (i.e. ensure 100% check

    weighing)

    (b) Check-weighing is performed to verify that the cylinder has been filled correctly

    within the permissible limits. This check is very important from safety point of view.duct to

    be filled in the cylinder. Accordingly, for the quantity of 15 kg of LPG, the cylinder

    would be termed under-filled if the product weight is less than 14.7 kg and it would

    be termed as over-filled if the product weight is more than 15.3 kg.

    (d) All the cylinder coming out from the filling machines must be check-weighed to

    ensure 100% checks.

    (e) In case of change of composition of LPG to be filled in cylinder, the correct safe

    weight of the product that can be filled will to be worked out.

    (f) Over-filling, if not detected, subjects cylinders to very high pressure (due to

    increase in ambient temperature, liquid in the cylinder would expand and hydrostatic

    pressure developed may at times burst the cylinder): The danger point is reached

  • 8/12/2019 IOCL BOKARO

    8/16

    when liquid expands to occupy fully the volumetric capacity of the cylinder, leaving

    no space. Once this point is reached there would be pressure rise at the rate of 24

    pressure for a LPG cylinder is 16.9 Kg/cm2 (1.66 Mega Pascal), Hydraulic Test

    pressure is 25.35 Kg/cm2 (2.45MPa), normal working pressure is approx. 7Kg/cm2 &

    burst pressure is approx 100 kg/cm2.

    (g) Likewise, under-filling, if undetected, shakes consumer's confidence.(h) In case any cylinder is heavily covered with mud, the same may result in under-

    filling when the method of overall filling is followed. It is, therefore, necessary that

    such cylinders are washed before filling. Particular care should be exercised to inspect

    the joint between foot ring and dished ends of the cylinder as there is greater

    possibility of accumulation of mud there.

    (info) Over-filled cylinder must be sent for immediate evacuation of excess

    quantity.

    (j) Each filling machine should be allotted serial no. at the Plant. Periodically, this

    number should be marked on the cylinder under filling on respective machine. When

    these cylinders are checked on the check-scales, record of actual observations should

    be made. This process helps to identify a filling machine giving incorrect filling.

    (k) Check-scales should be certified by the Weights and Measures Department, and

    must be tested against standard weights at least once during the shift.

    STAGE - VII: SEGREGATION - II

    Explanation:

    (a) Cylinders rejected at check-weighing are segregated as below:

    i. Overfilled cylinders are segregated and sent to evacuation unit for removing excess

    quantity.ii. Under-filled cylinders are segregated and sent for topping up on a separate

    stationary weighing scale having a filling point.

    (b) Cylinders having apparent leaks should also be segregated at this stage and

    corrective action taken to stop the leak. If leak cannot be stopped, the cylinders

    should be sent for evacuation.

    STAGE - VIII: TIGHTNESS TEST - I

    Explanation:

    (a) 'SC' type valveIn case of 'SC' type valve the valve seat remains in closed position unless pressure is

    applied against the spring. With the valve outlet open, any bubbles emerging out

    through the valve outlet would indicate leak through the valve seat.

    (b) General

    i. At this stage, leakage through bung or cylinder body may also be noticed in the

    form of bubbles emerging out from the leaky spot.

    ii. In case of any leak of above nature the cylinder is marked for segregation with

    appropriate marker to identify the type of leakage.

    (c) The tightness tests are intended to check leak through the cylinders which could

    be through:

    i. Cylinder's parent metal or pin hole in weld joint.

  • 8/12/2019 IOCL BOKARO

    9/16

    ii. Cylinder/valve joint commonly known as bung-joint.

    iii. The valve seat (with valve closed).

    iv. The valve spindle (with valve closed or open).

    v. The valve body (very rare occurrence)

    vi. The special adaptor/valve-outlet joint (in case of 'SC' type valve).

    (d) The tightness test-I is basically intended to check leaks past the valve seat.

    (e) Carousel type of tightness testing baths, which keep the cylinders in verticalposition, are ideally suited for checks at this stage.

    (f) Painting of interior surface of the test bath with white paint, provision of

    sufficient lighting arrangement and periodic changing of water for the test to ensure

    that it is clean, help in easy detection of the leaks.

    (g) Whenever leak is observed, attempts should be made to stop it, if possible

    (e.g. by tight closure of 'F' type valve or fixing of security nut/cap etc.)

    (h) If the leak cannot be stopped the cylinder should be sent for evacuation.

    (info) Suitable markers should be used to identify type of leaks such as valve leak,

    bung leak, etc.

    (j) The leaky cylinder, before it could be evacuated, should be so placed that the

    leakage is that of vapor and not liquid.

    STAGE - IX: SEGREGATION - III

    Explanation

    (a)

    Leaky cylinders from tightness test bath-I should be segregated and sent to

    Evacuation Unit.

    STAGE - X: PREPARING CYLINDER FOR TIGHTNESS TEST - II

    Explanation:(a) Cylinder with 'SC' type valve

    i. Water to be blown from the cavity of the valve, by air. (The cavity may be full of

    water when the cylinder comes out from the test bath - I)

    ii. Special type of adaptor (dummy pressure regulator) to be fixed, locked and

    adjusted on the valve. After fixing the adaptor, the knob is to be turned in on position

    to keep the valve seat open. The adaptor is basically a body of Pressure Regulator

    with diaphragm and related parts removed and outlet blocked (i.e. dummy Pressure

    Regulator). Alternatively the effectiveness of the 'O'-ring can also be checked

    through portable leak-detector which could be mounted on the cylinder valve, andleak, if any, observed through the fluid in the detector.

    STAGE - XI: TIGHTNESS TEST - II

    Explanation:

    (a) 'SC' type valve

    i. With the valve seat in open position with the help of special adapter the

    effectiveness of the 'O' ring (making a joint with the inlet of the pressure regulator)

    is tested.

    (b) General

    i. Tightness test is carried out with the valve seat in open position and outlet closed,

    with security nut in case of 'F' type valve and with adaptor in case of 'SC' type valve.

  • 8/12/2019 IOCL BOKARO

    10/16

    ii. At this stage leakages through bung or cylinder body are also checked which may

    be noticed in the form of bubbles emerging out from the leaky spot.

    (c) Leakage past valve seat having checked at tightness test bath I (STAGE - VII),

    other possible leaks are tested through tightness test bath II.

    (d) Suitable markers should be used to identify types of leaks such as bung leak,

    valve leak etc.

    (e) Immediate action should be taken to stop the leak temporarily whereverpracticable. If the leak cannot be stopped, the cylinder should be sent for evacuation

    and should receive priority over defective cylinders which are not leaking.

    (f) The leaky cylinder, before it could be evacuated, should be so placed that the

    leakage is that of vapor and not liquid.

    STAGE - XII: SOAP SOLUTION TEST

    Explanation:

    (a) Soap solution test is applied to check bung leaks in case of both 'F' type and 'SC'

    type cylinders. This is in addition to the two tightness tests carried out at stage VIII

    and Stage XI. A suitable marker should be placed to identify bung leak.

    (b) White applying soap solution to the bung/valve joint it must be ensured that

    the solution is applied all around the valve/bung joint.

    (c) Soap only should be used for making a soap solution and not a detergent.

    (d) Soap solution test is done to detect minute leaks through the joint which

    normally remain un-detected in water baths.

    STAGE - XIII: SEGREGATION - IV

    Explanation:

    (a)

    Leaky cylinders from tightness test-II should be segregated and sent toEvacuation Unit.

    STAGE - XIV: FINISHING OPERATIONS

    (b) Cylinders with 'Self-Closing' valve

    i. Remove special adaptor (if fixed).

    ii. Blow cavity of the valve outlet with air in case any water is observed.

    iii. Fix the security cap on the valve outlet.

    iv. Fix appropriate neck label.

    v. Seal the valve outlet using sealing tape.

    STAGE - XV: FINAL INSPECTION

    Explanation:

    (a) Check the cylinder visually for:-

    i. Apparent sound condition.

    ii. Presence of cap, and neck label in case of cylinders with 'cap' as valve protection.

    (b)

    Correct deficiency noticed, if any.

    STAGE -XVI: DISPOSAL OF FILLED CYLINDERS IN SOUND CONDITION.

    Explanation:

    (a) At this stage the cylinders are ready for delivery:-

  • 8/12/2019 IOCL BOKARO

    11/16

    i. If required the fit cylinders can be directly sent to the stake trucks for loading.

    ii. If no stake-truck is available, the cylinders can be sent for stacking in the area

    earmarked for the purpose

    General overview about Bokaro bottling plant:

    1.

    TUP (Tanker unloading plant)

    Plant consist of total 6 bay for unloading tankers, it means 6 tankers can be emptied

    at a time.

    Per tanker capacity : 10 metric tonne

    Daily emptied tankers: 12

  • 8/12/2019 IOCL BOKARO

    12/16

    2.

    STORAGE FACILITIES:

    (i). Horton sphere:

    Numbers : 1

    Capacity : 1400 metric tonne

    Pressure in stored condition : 7 Kg (variable)

    Pressure during unloading : 1012 Kg

    (ii). Bullets:

    Numbers: 3Capacity: 150 metric tonne per bullet

    Total capacity: 1850 Metric tonne

  • 8/12/2019 IOCL BOKARO

    13/16

    Safety measures while storage:

    BLEED OFF VALVE: Main use of bleed off valve is in maintaining pressure inside the

    storage facilities. If pressure inside the Bullets or Horton sphere increases above

    certain limit, then valve is opened to bleed off extra pressure.

    WATER SPRINKLER FIRE FIGHTING : A fire sprinkler system is anactive fire

    protection measure, consisting of a water supply system, providing adequate pressure

    and flow rate to a water distribution piping system, onto whichfire sprinklers are

    connected.

    FILLING SHED

    WASHING UNIT

    The Washing unit is on-line equipment used to wash the incoming cylinders

    with multiple forced jet of water to Remove mud, dirt, stains, etc., from the outersurfaces

    http://en.wikipedia.org/wiki/Active_fire_protectionhttp://en.wikipedia.org/wiki/Active_fire_protectionhttp://en.wikipedia.org/wiki/Fire_sprinklerhttp://en.wikipedia.org/wiki/Fire_sprinklerhttp://en.wikipedia.org/wiki/Active_fire_protectionhttp://en.wikipedia.org/wiki/Active_fire_protection
  • 8/12/2019 IOCL BOKARO

    14/16

    DRYING UNIT

    The Drying unit is an on - line equipment used to dry the cylinders, coming out

    of washing unit by blowing the air on the sides and top surfaces of the cylinders asthey move.

    KEROSEL UNIT

    Kerosel Unit is an on-line equipment used to create vacuum in the first stage and filling LPG

    vapor in the second stage in new / hot repaired empty cylinders.

  • 8/12/2019 IOCL BOKARO

    15/16

    WEIGHT CHECK

    The digital check weighing system with segregation unit is designed to check

    the gross weight of a filled LPG cylinder and reject the cylinder from main stream on

    to a loop conveyor if the gross weight is more or less than the stipulated value. The

    electronic check scale is programmed in such a way to subtract 14.2 Kg or 19 Kg from

    total weight of cylinder and the tare weight will be displayed. Operator has to

    compare the displayed tare weight value with the tare weight value punched on the

    cylinder and if the value is beyond the permissible limit, the cylinder will be rejected.

    The unit is an on-line equipment used to ensure that correct weight of LPG fuel is

    carried in the cylinders.

    Under-filled cylinders are filled with additional quantity of LPG and the weight

    is corrected. Overfilled cylinders are checked and the weight of LPG fuel is corrected

    by evacuation process

    LEAK CHECK AND O RING

    Cylinder is checked for any leak at O-RING valve and if leak detected then it ischanged .Process can be accomplished manually or automatically. After placing O-

    RING it is deflected for final sealing by means of placing seal cap on cylinder nozzle.

    Again cylinder is checked for further leakage by passing through water bath .And, at

    the end plastic cover is fixed on seal cap to ensure complete seal and cylinder is

    ready for delivery.

  • 8/12/2019 IOCL BOKARO

    16/16

    REFERENCES