    Dunbar

    The Dunbar EfW project involves the

    design, construction and commissioning

    of an energy from waste facility at the

    site of Viridor Waste Management

    Limited at Oxwellmains Landfill.

    The plant will be located on a new site

    (a green field plant) a few kilometers

    south east of Dunbar in East Lothian,Scotland The waste fired power plant

    consisting of two mass burn boiler lines

    with a common building, waste bunker,

    and turbine/generator. Each boiler has a

    capacity of 53 MWth or 20 tons wasteper hour. The fuel consists of various

    waste fractions including municipal solid

    waste. The new plant is due to be

    commissioned in 2017 and handed over

    to the Client in late 2017/start of 2018.

  • 7/23/2019 GMAB Presentation 4 P

    2/5

    Margam Western Wood Energy Plant

    The Margam Green Energy projec

    has being developed by Eco2 Ltd. /

    Margam Green Energy Limited (SP

    and has full planning permission. Th

    plant will be located in Margam

    Port Talbot, between Swansea and

    Cardiff in South Wales and designe

    for 335,000 tonnes per year of multi

    fuel / waste wood grades A-C, withan electricity production of 40MWe.

    The new plant is due to be

    commissioned in 2017 and handed

    over to the Client in mid-2017.

    Babcock Wilcox Vlund has beencontracted to operate and maintain

    the plant for 15 years after Take-Ov

  • 7/23/2019 GMAB Presentation 4 P

    3/5

    Templeborugh Biomass project

    The Brite Templeborugh

    Biomass project will be

    capable of processing waste

    wood, including contaminatedwood and fuel containing

    metals, with no pre-treatment.

    The plant will have a capacity

    of 264,000 tons per annum,

    generating 40MW of electricity.

    The plant will be located in

    Rotherham near Sheffield in

    the UK and has been

    developed by Brite Partnership.Babcock Wilcox Vlund has

    been contracted to operate and

    maintain the plant for 15 years

    after Take-Over.

  • 7/23/2019 GMAB Presentation 4 P

    4/5

    Eco 2 Teeside Renewable energy plant

    Teeside Renewable energy

    plant has being developed by

    Eco2 Ltd.

    and has full planning permission.The plant will be very similar to

    The Margam prohect with the

    same capacity and is designed for

    335,000 tonnes per year of multi

    fuel / waste wood grades A-C,

    with an electricity production of

    40MWe. The new plant is due to

    be commissioned by mid 2017

    and handed over to the Client inend-2017.

    Babcock Wilcox Vlund are in

    final negotiations for building and

    to operate and maintain the plant

    for 15 years after Take-Over

  • 7/23/2019 GMAB Presentation 4 P

    5/5

    Time schedule

    2015-04-21