Federal Acquisition Service U.S. General Services Administration Recovery and Reinvestment Act Solutions Event March 5, 2009 Energy and Environmental Solutions
  • date post

    18-Dec-2015
  • Category

    Documents

  • view

    216
  • download

    2

Transcript of Federal Acquisition Service U.S. General Services Administration Recovery and Reinvestment Act...

Federal Acquisition Service

U.S. General Services Administration

Recovery and Reinvestment Act Solutions Event

March 5, 2009

Energy and Environmental Solutions

Federal Acquisition Service

How the MAS Program Can Help

Meet time frames for spending Supports firm-fixed price awards Specific reporting requirements

can be included in scope Supports socio-economic goals Supports competitive

procurements

2

Federal Acquisition Service

Laws and Regulations that Influence Energy and Environmental Protection

The American Recovery and Reinvestment Act of 2009 Executive Order 13423, “Strengthening Federal

Environmental, Energy, and Transportation Management” (January 24, 2007)

The Energy Policy Act (EPAct) 2005 The Energy Independence and Security Act of 2007

(originally named the CLEAN Energy Act of 2007) Agency Specific Regulations

3

Federal Acquisition Service

Laws and Regulations (Continued)

Clean Air Act Clean Water Act National Historic Preservation Act National Environmental Policy Act (NEPA) Resource Conservation and Recovery Act (RCRA) Comprehensive Environmental Response,

Compensation, and Liability Act (CERCLA) Occupational Safety and Health Administration

(OSHA) Regulations Other Energy and Environmental Conservation Laws

and Regulations

4

Federal Acquisition Service

American Recovery and Reinvestment Act

$11.4 billion non-grant funds appropriated for Energy and Environmental projects

Helps meet funding requirements and goals for projects outlined in other legislation

Calls for the investment in energy efficiency of many Federal facilities

Reduces the environmental impact

5

Federal Acquisition Service

OMB Endorses Schedules as Competitive Procedures Relative to the Act To the maximum extent practicable, contracts using

Recovery Act funds shall be awarded as fixed-price contracts (See FAR Subpart 16.2) using competitive procedures. These procedures include those identified under FAR Subparts 6.1, 6.2, and 16.505(b)(1) and Subsections 8.405-1 and 8.405-2. Existing fixed-price contracts that were competitively awarded may be used to obligate funds expeditiously.

Source: OMB Memorandum M-09-10 dated February 18, 2009, Initial Implementing Guidance for the American Recovery and Reinvestment Act of 2009, Page 39

6

Federal Acquisition Service

Unique Reporting Requirements of the Act Pre-solicitation notices must be posted on FedBizOpps

(FBO) in accordance with FAR Part 5, including applicable dollar thresholds. Under the Recovery Act, pre-solicitation notices are required for any order, meeting the FAR Part 5 dollar thresholds, under a task or delivery order contract, including GWACs, multi-agency contracts, GSA Federal Supply Schedule contracts. These notices will be posted in FBO for information purposes only (i.e., the requirements of FAR Subpart 5.203 do not apply). Contracting officers should continue to also use their usual solicitation practice (e.g., e-Buy).

Source: OMB Memorandum M-09-10 dated February 18, 2009, Initial Implementing Guidance for the American Recovery and Reinvestment Act of 2009, Page 41 7

Federal Acquisition Service

Energy Reduction Goals for Federal Facilities*

Fiscal Year % Reduction from 2003 Baseline

2009 92010 122011 182012 212013 242014 272015 30

*Under current legislation8

Federal Acquisition Service

Renewable Energy Goals* EPAct 05 directs agencies to obtain the following

percentage of purchased electricity from renewable sources:

2009 3%2010-2012 5%2013 > 7.5%

EO 13423 – encourages agencies to obtain half of the renewable energy from new sources and on-site where feasible

EISA directed not less than 30% of hot water demand in new buildings shall be from solar, if cost effective

*The new Administration is proposing that 10% of US electricity should come from renewable resources by 2012 and 25% by 2025.

9

Federal Acquisition Service

Water Conservation Goals

EO 13423 2% reduction per year through FY 2015 using a

2007 base line

EISARequires energy and water audits in all covered

buildings

10

Federal Acquisition Service

Key Areas Outlined in the Applicable Legislation

Metering and Advanced Metering No later than 10/01/12 all Federal buildings with the

exception of excluded buildings shall be metered for energy efficiency and electricity cost reduction

Highly encouraged to use advanced metering devices that measure, at least, hourly and provide data daily

Natural gas and steam metering no later than 10/01/16

Energy Managers Designated energy managers required by each agency and

must be “trained energy managers”

11

Federal Acquisition Service

Key Areas Outlined in the Applicable Legislation (continued) Comprehensive energy and water evaluations

Required in 25% of covered facilities yearly (each facility evaluated every 4 years)

Commissioning/Recommissioning/ Retrocommissioning

Measures must be identified and assessed Implementation of energy and water conservation

measuresNo later than 2 years after evaluation energy

managers may implement cost effective projects and/or bundle individual measures into combined projects 12

Federal Acquisition Service

Energy and Environmental Solutions

899 Environmental Services

03FAC Facilities Maintenance & Management

56 Buildings & Building Materials/Industrial Services & Supplies

84 Total Solutions For Law Enforcement, Security, Facilities Management, Fire, Rescue, Clothing, Marine Craft and Emergency/Disaster Response

13

Federal Acquisition Service

American Recovery and Reinvestment Act

Environmental Cleanup Hazardous Waste Cleanup Leaking Underground Storage Tanks Evaluate and Cleanup Brownfields Surveys, Investigations and Research Climate Modeling Monitoring Systems Wastewater Treatment Systems Habitat Restoration Natural Resources Conservation Watershed Enhancement

14

Federal Acquisition Service

Strengthening Federal Environmental, Energy, and Transportation Management(Executive Order 13423)

Acquisition of Green Services Environmental Management Systems (ISO 14001) Environmental Compliance and Sustainability Hazardous Waste Minimization Pollution Prevention Environmental Training Electronic Management and Recycling Programs Environmental Conformance Reviews and Audits

15

Federal Acquisition Service

Comprehensive Energy Management Solutions

Perform baseline analysis Perform assessment and development plan Project implementation Measurement and verification

16

Federal Acquisition Service

Analysis and Planning Solutions

Energy management planning and strategies Audit services Program support services Environmental impact analyses Natural resource planning

17

Federal Acquisition Service

Energy Implementation & Measurement Solutions

Energy and Facility Management Systems Energy Efficient Lighting HVAC Equipment and Chillers

Air handlers Heat pumps Unit ventilators Rooftop units

Building Commissioning Services Roofs - Energy Star, Photovoltaic and Vegetation

18

Federal Acquisition Service

Metering and Advanced Metering

Measurement of energy consumption Metering equipment with installation and removal Measurement and tracking of the cost effectiveness

of energy technology investments

19

Federal Acquisition Service

Renewable Energy Solutions

Solar Energy Systems Solar Lighting Fuel Cells Wind Energy Power Distribution Systems Geothermal Hydropower

20

Federal Acquisition Service

Water Conservation Solutions

Water Audits Water System Analysis Water Purification/Filtration Solutions Water Conservation Support Products Watersheds and/or Wetlands Management Groundwater Monitoring Wastewater Treatment Systems

21

Federal Acquisition Service

Energy Savings Performance Solutions (ESPCs)

Contractor and Agency enter into agreement for the contractor to perform an Investment Grade Audit (IGE).

Upon agreement of the price, scope of work, and M&V Plan, a delivery/task order shall be issued by the ordering agency.

Upon acceptance of the work, the guarantee period shall begin.

Administration Plan and Periodic M&V required

22

Federal Acquisition Service

Added Features for Turnkey Solutions

Installation/Integration Maintenance Training Consulting Ancillary Repair and Alterations

23

Federal Acquisition Service

Energy Audits & Building Commissioning Services - North Dakota National Guard

BPAs were set up with six energy management schedule contract holders – Schedule 03FAC

BPAs have shortened lead time for National Guard Able to use for multiple bases without re-competing Looking to expand to other bases in FY 2009

24

Federal Acquisition Service

ESPC – Ft. DrumU.S. Army - Ft Drum

Home to 10th Mountain DivisionGuaranteed ESPC Installation Sq. Ft.: 11.8 million Contract Dates: 2003 - 2009 Contract Amount: $6.6 million

Services Provided Geothermal heat pumps High efficiency HVAC upgrades New high efficiency lighting system Infrared heating system Pneumatic tool system isolated to reduce energy Direct Digital Controls (DDC) network

ESPC Project using GSA Schedule 84 25

Federal Acquisition Service

Valuable Savings – ACOE for DOE

U.S. Army Corps of Engineers for Department of Energy used Environmental Specialist to drill, install, and test more than 50 monitoring wells

Schedule 899 allowed the Corps to procure services on a fixed-price basis, which allowed a reduced cost, saving the Government over $54M

It, also, allowed a fast-track schedule meeting strict regulatory deadlines and specifications, reducing their program time frame from 15 years to only 4 years

Schedule 899 was chosen by the USACE & DOE because it was readily available, easy to use, and provided overall best value

26

Federal Acquisition Service

Green Sustainable Roof System – GSA

GSA took a traditional roof system demolition and replacement in Chicago, IL and opted for a Green alternative.

Schedule 56 allowed GSA to install a vegetated room system on approximately 18,000 square feet and a price competitive with traditional methods.

The Vegetated Roof is Energy Star rated and approved as Cool Roof technology.

The Vegetated Roof has leak detection technology built in, provides significant decrease in storm water run-off and is aesthetically pleasing for the building inhabitants and neighbors.

27

Federal Acquisition Service

Water Conservation - EPA Headquarters

U.S. Environmental Protection Agency Headquarters needed support in improving EPA’s water quality (nationwide) and used Schedule 899 to develop the Total Maximum Daily Load (TMDL) for quantitative assessment of pollution sources and allocations to reduce pollution levels

“Without this schedule contractor’s expertise and assistance, the tasks the Region or Regional States accomplished in the TMDL and water quality modeling field would not have been completed and would not have been as technically defensible”

28

Federal Acquisition Service

VA – Renewable Energy Conversion Project – Loma Linda, CA

In order to comply with EO 13423, the VA identified the Loma Linda, CA facility as a candidate for a Photovoltaic (PV) renewable energy system which converts solar energy to electricity.

Schedule 56 provided a solution to install one of the most highly efficient PV systems currently available at the Loma Linda facility.

The installed system will save the VA facility approximately $60,000 per year in electricity costs and is considered a model for other VA facilities. 29

Federal Acquisition Service

Energy Audits - VA National Energy Business Center

Used Schedule 03FAC for $11 million in energy audits for facilities nationwide

A few hundred sites left to audit Audits done quick – short procurement lead times Allows for implementation of energy conservation

measures Improve overall energy efficiency of buildings Assisted in adhering to EO 13423

30

Federal Acquisition Service

Points of Contact

Energy Management Services – 03FACJennifer Hazelman [email protected]

Energy Product Solutions - 56Donna [email protected]

Energy Management Systems & ESPCs - 84Kellie [email protected]

Environmental Services - 899Carolyn [email protected]

Schedule 03FAC Energy Management Services include the major categories of energy management program support: Energy Audits, Metering, Building Commissioning, etc.www.gsa.gov/energyservices

Schedule 56 for environmental products: solar window film, HVAC equipment, water purification, green roofs, etc. www.gsa.gov/buildindustrial

Schedule 84 offers integrated energy solutions and Energy Savings Performance Contracts (ESPCs).

Schedule 899 assists agencies in complying with environmental initiatives and meeting goals www.gsa.gov/environmental 31

Federal Acquisition Service

Helpful Web Addresses GSA Homepage - www.gsa.gov

Information about the MAS Program - www.gsa.gov/schedules

GSA Advantage!® - www.gsaadvantage.gov

GSA eLibrary - www.gsa.gov/elibrary

e-Buy - www.gsa.gov/ebuy

Schedules Ordering Guide - www.gsa.gov/CMLSSearch for “Desk Reference Guide”

Customer Service Director Contact Info - ww.gsa.gov/csd

Additional Information on Services Schedules Ordering - http://schedulesolutions.net/

Helpful Search Tool - http://sites.google.com/site/advantageplusbeta/ 32

Federal Acquisition Service

Panel Members Questions and Answers

33