Global Manufacturing & Trade Co. requires an Industrial Designer Multi-skilled Fanatically µcustomer/user oriented¶ Deeply committed to creative design solutions Knowledgea ble about a wide range of manufact uring business Comfortable in marketing, design and engineering disciplines Knowledgeable about new design & visualization technologies  Send your resume to [email protected]

Transcript of EUT 441E NPD2

Page 1: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 1/37

Global Manufacturing & Trade Co.

requires anIndustrial Designer

Multi-skilled

Fanatically µcustomer/user oriented¶

Deeply committed to creative design solutions

Knowledgeable about a wide range of manufacturing business

Comfortable in marketing, design and engineering disciplines

Knowledgeable about new design & visualization technologies

 Send your resume to [email protected]

Page 2: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 2/37

 NPD is interdisciplinary!

New Product Development is aninterdisciplinary activity requiring

contributions from nearly all the functionsof a firm, such as finance, sales, legalfunction.

However, three functions are central to NPD!

Page 3: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 3/37

3Main Functions of 

 NPD

Marketing

Manufacturing/Engineering

Design

Page 4: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 4/37

Marketing: involves in the interactions between

the firm and its customers. Such as:

identification of customer needs,

identification of product opportunities,

definition of market segments,

arrangements of communication,

set prices,

oversees the launch and the promotion of 

the product.

Page 5: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 5/37

Manufacturing is responsible for designing

and operating the production system in

order to manufacture the product.

It also includes;

Purchasing

and Installation

Page 6: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 6/37

Design involves in the definition of the

function and physical form of the product to

meet the customer needs.

It includes engineering design (mechanical¶electrical and software interaction)

and  I ndustrial Design (user interaction).

Page 7: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 7/37

 NPD Team

Few products are developed by a single

 person, but by a collection of individuals

called the project team.

Teams have members from the 3 main

functions + other functions, if necessary.

Every team has a leader, and consisted of a

core and extended sub-teams.

NPD teams operates through a process

Page 8: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 8/37

 NPD

Process

A process is a sequence of steps that

transforms a set of inputs into a set of 

outputs.

A  NPD process is the sequence of steps or 

activities that a firm employs to conceive,

design and commercialize a new product.

Page 9: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 9/37

Some facts about NP

D process Some firms define and follow a precise and

detailed  NPD process.

Others may not even be able to describe their  processes.

Every firm employs a process at least slightly

different from that of every other firm.

The same firm may follow different processes for 

each of different types of development processes.

Page 10: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 10/37

A well-defined  NPD process is

useful because it helps in Quality Assurance: it specifies the phases and

checkpoints along the way,

Coordination: It acts as a master plan which defines theroles of each players in the  NPD team (when, with whom,what interaction)

Planning:It contains milestones corresponding to thecompletion of each phase. Timing of the schedule

Management: It is a benchmark for assessing the performance of ongoing  NPD effort.

Improvement: documentation of  NPD process identifyopportunities for improvement.

Page 11: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 11/37

5 P

hases of Generic NP

DP

rocess Concept Development

System-level Design

Detail Design

Testing and Refinement

P

roduction ramp-up.

Page 12: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 12/37

Planning

Product Development

Process

Concept

DevelopmentSystem-Level

Design

Detail

Design

 Testing and

Refinement

Production

Ramp-Up

Page 13: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 13/37

Concept Development A Product Concept is a description of the form,

function, and features of a product, accompanied

 by a set of specifications, an analysis of competitive products, and an economic

 justification of the project.

In the Concept Development phase, needs of 

target market are identified, alternative productconcepts are generated and evaluated, and a single

concept is selected for further development.

Page 14: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 14/37

System-Level Design This phase includes the definition of the

 product into subsystems and components.

The output is a geometric µlayout¶ of the

 product, a functional specifications of each

of the product¶s subsystems.

Page 15: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 15/37

Detail Design This phase includes the complete

specifications of geometry, materials and

tolerances of all of the unique parts in the

 product and the identification of all of the

standard parts to be purchased from

suppliers. The output is the control documentation for 

the product.

Page 16: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 16/37

Testing and Refinement The phases involves the construction and

evaluation of multiple pre-production

versions of the product.

Alpha Prototypes

Beta Prototypes

Page 17: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 17/37

Production Ramp-up

In this phase, the product is made using the

intended production system.

µPilot Production¶

The purpose is to train work force and work 

out any remaining problems in the

 production process.

Page 18: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 18/37

Variants of 

 NPD

Process

Generic (market-pull)

Technology Push

Platform Products

Process-Intensive

Customization

Page 19: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 19/37

Generic (MarketP

ull)

NPD starts with a market opportunity and,

seeks out whatever technologies are

required to satisfy the market need.

Thus, the market pulls the  NPD decision!

Page 20: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 20/37

Technology-P

ush NPD starts with a new technology, and

Looks for an appropriate market in which to

apply this technology.

That is, technology pushes  NPD!

Page 21: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 21/37

Platform

Products

A platform-product is developed around a pre-

existing technological subsystem (a technology

 platform). Similar to technology-push

But a technology platform has already proved its

usefulness in the market.

Therefore, it¶s more simple and cheaper to

develop new products based on existing platforms.

Page 22: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 22/37

Process-Intensive

For process-intensive products, the production

 process places strict constraints on the properties

of the product, so that the product design cannot be separated, even at the concept phase, from the

 production process design.

First a production method is decided upon, then

 product design is limited by the capabilities of this process.

Page 23: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 23/37

CustomizedP

roducts When a customers requests a new product,

the firm executes a structured design and

development process to create the productto meet the customers¶ needs.

Highly structured and detailed  NPD process

with a series of well defined stages.

Page 24: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 24/37

 NPD Organizations

In addition to an effective  NPD process,

successful firms also organize their  NPD

staffs effectively.

An  NPD organization is the scheme by

which individual designers, engineers and

marketers are linked together into groups.

Page 25: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 25/37

Links in  NPD Organizations

These links among individuals in  NPD process may be

formal or informal, but mostly include:

R eporting R elationships: The classic notion of  supervisor 

and subordinat e. Formal links shown on organizational

charts.

Financial Arrangements: Being part of the same

financial entity, such as defined by a particular budget

category or profit-and-loss statement.

Physical Layout: Links created when individuals sharethe same office, floor, building or site. Informal and

spontaneous.

Page 26: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 26/37

Organizational Links Individuals in  NPD organizations can be classified

 by

Function ± area of responsibility involving specializededucation, training, or experience. Main functions in  NPD

 ± marketing, design and manufacturing.

Project ± the set of activities in the development process

for a particular product and includes, for example,identifying customer needs, generating product concepts,

etc.

Page 27: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 27/37

 NPD Organizations

Functional Organization: the organizational

links are among those who perform similar 

functions.

Project Organization: the organizational

links are among those who work on thesame project.

Page 28: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 28/37

Functional Organization Individuals share similar training and experience,

They all report to the same manager who would

evaluate tem and set their salaries,

The group has its own budget,

Generally, they share the same physical location.

They would be involved in many different projects, but with no strong organizational links to

other member of each project team.

Page 29: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 29/37

Functional Organization

design 3

design 2

design 1

design manager 

marketing 2

marketing 1

marketing manager 

manufacturing 2

manufacturing 1

manufacturing manager 

General Manager 

Page 30: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 30/37

Page 31: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 31/37

P r o j e c t O r g a n i z a t i o n

M a n u f a c t u r i n g

D e s i g n

M a r k e t i n g

P r o j e c t M a n a g e r I

M a r k e t i n g

D e s i g n

M a n u f a c t u r i n g

F i n a n c e

P r o j e c t M a n a g e r 2

D e s i g n

M a r k e t i n g

L o g i s t i c s

P r o j e c t M a n a g e r 3

G e n e r a l M a n a g e r  

Page 32: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 32/37

Page 33: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 33/37

Two variants in Matrix Organization

H eavyweight Project Organization

Contains strong project links

Manager has complete budget authority, S/he is heavily involved in performance evaluation of the

team members and,

takes most of the major resource allocation decisions.

Although each individual also belongs to a functionalorganization, functional managers have relatively little

authority and control.

Page 34: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 34/37

GeneralManager

Heavyweight ProjectManagers

Functional Managers

Page 35: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 35/37

Two variants in Matrix Organization

Lightweight Project Organization

Contains weaker project links

Project manager is more of a coordinator and

administrator. S/he is involved in updating schedules, arranging

meetings, and facilatating coortdination.

But has no real authority and contral in project

organization.

Functional managers are responsible for budgets,hiring and firing and performance evaluation.

Page 36: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 36/37

General

Manager

Lightweight Project Managers

Functional Managers

Page 37: EUT 441E NPD2

8/8/2019 EUT 441E NPD2

http://slidepdf.com/reader/full/eut-441e-npd2 37/37

Choosing an NPD Organizational Structure

Questions to ask:

How important is cross-functional integration?

How Critical is cutting-edge functional expertise

to business success?

Can individuals from each function be utilized for 

most of the duration of a project?

How important is  NPD speed?