TEKNIK MESIN PERAWATAN POLITEKNIK NEGERI SAMARINDA Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131 Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355 Website : www.polnes.ac.id email : [email protected] Hal … Dari … ( On the Job Training ) DAILY ACTIVIY REPORT Name Wahyu Widyantoro NIM 13 611 022 Location OJT PT. KSB Indonesia Date Activity Remarks 1 Juli 2015 The introduction of the workshop area and K3 The induction of the workshop area and K3 See Valve adjustment Attension adjustment valve on unit KSB, such as Volvo engine Induction Pump Basic introduction pumps in KSB 2 Juli 2015 Checking working lamp Remove the lamp working at KSB pump unit. Disassemble and clean the working lamp. 3 Juli 2015 Checking working lamp Check what the lamp working there is no light bulb broke and no wires are melted because of heat-voltage electric current. 6 Juli 2015 Helps painting working lamp Painting working lamp framework. Helping the assembly working lamp Assemble and replace components that have been damaged lamp working. 8 Juli 2015 Installation of working lamp on the unit KSB Instal the working lamp on the roof KSB Suggestion From Supervisor : OJT - TEKNIK MESIN PERAWATAN Page

description

bhyguygu

Transcript of English

Page 1: English

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

DAILY ACTIVIY REPORT

Name Wahyu Widyantoro NIM 13 611 022 Location OJT PT. KSB Indonesia

Date Activity Remarks

1 Juli 2015

The introduction of the workshop area and K3 The induction of the workshop area and K3

See Valve adjustment Attension adjustment valve on unit KSB, such as Volvo engine

Induction Pump Basic introduction pumps in KSB

2 Juli 2015 Checking working lamp Remove the lamp working at KSB pump unit.Disassemble and clean the working lamp.

3 Juli 2015 Checking working lampCheck what the lamp working there is no light bulb broke and no wires are melted because of heat-voltage electric current.

6 Juli 2015Helps painting working lamp Painting working lamp framework.

Helping the assembly working lamp

Assemble and replace components that have been damaged lamp working.

8 Juli 2015 Installation of working lamp on the unit KSB Instal the working lamp on the roof KSB

Suggestion From Supervisor :

Name Position Initials

Checked By :

OJT - TEKNIK MESIN PERAWATAN Page

Page 2: English

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

9 Juli 2015 Studying the high and low sensor on the pump

Knowing how sensors work of high-level and low-level in the pump while working or running, if the water in the vacuum tank touching the sensors high level then automatically vacuum or compressor will shut down self and after the water went down touching the sensor low level then the engine will re-start and operate back.

13 Juli 2015 Remove rubber coupling Remove the rubber coupling on the unit KSB.

15 Juli 2015

Instalasion electrical Install cable lines lights heading towards junction box and control panel.

Testing cable connectionTest the cable connection from the junction box and the control panel if there is a cable break or not, use a digital avo meter to know.

22 Juli 2015

Instal rubber couplingInstal the rubber coupling so that the pump can work as well and the rubber coupling has the function of reducing vibration.

Instal cover coupling Cover rubber coupling has the function of protecting the coupling of foreign objects that exist at the site.

23 Juli 2015

Instal heat shield Heat shield has a function to prevent the heat from the turbocharger into the engine valve room.

Replace sealing strip Sealing strip has a function to prevent oil leaking out and prevent impurities such as dust into the engine.

Saran dari Supervisor :

Diperiksa Oleh :

Nama Posisi Paraf

OJT - TEKNIK MESIN PERAWATAN Page

Page 3: English

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

24 Juli 2015 Alighment

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit taupun engine.

27 juli 2015 Instal the battery switch or Clipsal.

Clipsal or battery switch has the function to disconnect and connect the flow of electricity from battery to the starter motor.

28 Juli Instal working lamp dan strop lamp atau rotary lamp.

Working lamp unit has a function as lighting DND pump when operated at night and also for lighting at the time of maintenance such as adding oil and others.Strops lamp has a function as a sign that the engine is in a state of running or operating.

29 Juli 2015 Test running engine Test running has the engine system checks there is a system that is not running properly.

30-31 Juli 2015 Maintenance engine The replacement of components in the engine such as the replacement of oil filter, fuel filter and air cleaner.

Saran dari Supervisor :

Nama Posisi Paraf

OJT - TEKNIK MESIN PERAWATAN Page

Page 4: English

Diperiksa Oleh : TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

3-5 Agustus 2015 Cleaning workshop Do it program 5R is (Ringkas Rapi Resik Rawat dan Rajin).

6 Agustus 2015 Replace coolant and oil on the engine

Replacing the coolant because the coolant has reached the point of maximum cooling so the coolant is not functioning properly.Replacing oil as a function of oil as a lubricant and also cool the engine was not functioning properly.

7 Agustus 2015 Install pump roofRoof pump has a protective function as a pump and the engine of the weather and other foreign objects that exist on the site.

10 Agustus 2015 Alightment unit KSB

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit or engine.

11 Agustus 2015 Test running engine Test running has the engine system checks there is a system that is not running properly.

Saran dari Supervisor :

Nama Posisi Paraf

Diperiksa Oleh :

OJT - TEKNIK MESIN PERAWATAN Page

Page 5: English

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022

Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

12-14 Agustus 2015 Welding oil pallet storage

Oil storage pallet has a function as a place holder used oil storage drum and the new oil.This is to avoid the occurrence of oil spills residual oil.

18 Agustus 2015 Cleaning unit KSB

Cleaning the unit KSB newly arrived from the site.Purpose cleaning unit to clean the dirt that ad on the pump and the engine so as not to interfere with the work of the component system.

19-21 Agustus 2015 Workshop assemblyDoing work that can be done in a workshop such as welding and check list engine components such as the battery check, oil and collant.

24 Agustus 2015 Workshop assembly General workshop assembly.Welding reducer pump.

25-26 Agustus 2015 Checking unit KSB 19

Checking oil and coolant.Do it replacement of oil filter and fuel filter because it's time to be replaced because the engine has been running for a long time or nonstop 24 hours.

Saran dari Supervisor :

Nama Posisi Paraf

OJT - TEKNIK MESIN PERAWATAN Page

Page 6: English

Diperiksa Oleh : TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

27-31 Agustus 2015 Prepare enginePreparing engine for rental or sale, such as preparing the engine in a state ready without any problems and also fill in the oil and coolant.

01 September 2015 Running test engine Test running has the engine system checks there is a system that is not running properly.

02 September 2015 Rapping pump KSB 19 Coat the pump parts that are not in the painting.

03 September 2015 Alighment KSB 12

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit taupun engine.

04 September 2015Workshop assembly fabrication welding reducer.

Reducer is a tool that serves to transmit high speed into a low speed, so that the motor has a high torque is converted into slow by reducer

Saran dari Supervisor :

Nama Posisi Paraf

OJT - TEKNIK MESIN PERAWATAN Page

Page 7: English

Diperiksa Oleh :TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

7-8 September 2015 Replace radiator KSB 19 Removing and cleaning the radiator because a lot of garbage.

9 September 2015Workshop assembly fabrication welding reducer.

Reducer is a tool that serves to transmit high speed into a low speed, so that the motor has a high torque is converted into slow by reducer.

10 September 2015 Checking engine KSB 31 Do it final check before engine running.

11 September 2015 Refill oil and coolant KSB 19 dan KSB 31 To maximum engine performance while at the site.

14 September 2015 Checking engine KSB 16 Do it final check before engine running.

Saran dari Supervisor :

Nama Posisi Paraf

OJT - TEKNIK MESIN PERAWATAN Page

Page 8: English

Diperiksa Oleh :TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

15 September 2015 Replace gasket exhaust manifold KSB 02

Gasket prevents leakage of exhaust gas in the exhaust manifold.

16 September 2015 Checking engine KSB 19 Do it final check before engine running.

17 September 2015 Instal hose and reservoir coolant.

Hose as a line of water coolant and coolant reservoir as a water reservoir.

18 September 2015 Test engine running KSB 31 Test running has the engine system checks there is a system that is not running properly.

21 September 2015 Aligment KSB 13

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit taupun engine.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATAN

OJT - TEKNIK MESIN PERAWATAN Page

Page 9: English

POLITEKNIK NEGERI SAMARINDAJl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131

Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

22 September 2015 Test running engine KSB 16 Test running has the engine system checks there is a system that is not running properly.

23 September 2015 Workshop assembly fabrikation cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

25 September 2015 Test running engine KSB 10 Test running has the engine system checks there is a system that is not running properly.

28 September 2015 Aligment KSB 21

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit taupun engine.

30 September 2015 Training K3 with Mr. Eko To better understand the importance of his safety while working in the workshop or on site.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

OJT - TEKNIK MESIN PERAWATAN Page

Page 10: English

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

1 Oktober 2015 Training safety K3 To better understand the importance of his safety while working in the workshop or on site.

2 Oktober 2015 Training engine with Mr.Rio Studying basic engine and the system.

4 Oktober 2015 Workshop assembly fabrikation cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

5 Oktober 2015 Brushing base motor aqua pump. Leighton

Cleaned of dirt to easly the alignment because the base of the motor is clean no dirt that block sim so alighment can be maximal.

6 Oktober 2015 Remove engine and roofRoof has a function is a protect engine from weather and foreign objects on the site such as coal and other land.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131

OJT - TEKNIK MESIN PERAWATAN Page

Page 11: English

Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

7 Oktober 2015 Alighment KSB 21

Alignment is to do the alignment of pump and engine by moving one component of the engine or pump. If the engine does not equal then the addition or subtraction sim while for fixed pump no additional sim.If there is a miss alighment engine vibration and pump are too high can cause damage to the pump unit taupun engine.

8 Oktober 2015 Workshop assembly fabrikation cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

9 Oktober 2015 Do it 5S Cleaning workshop and separate spare parts and tools are still used and are no longer used.

12-13 Oktober 2015 Training alighment with Mr.Widi

Learn the steps in the correct alignment and laser alignment using the correct tool.

15-16 Oktober 2015 Training pump with Mr.Kosmas

Studying various types of pumps KSB pumps and learning curve.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

OJT - TEKNIK MESIN PERAWATAN Page

Page 12: English

Website : www.polnes.ac.id email : [email protected]

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

19 Oktober 2015 Training LCC pump with Mr.Faisal

Knowing the functions of the components LCC pump and LCC pump material.

20 Oktober 2015 Workshop assembly fabrikasi cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

21 Oktober 2015 Training movitec pump with Mr.widi

Knowing the specifications of fluid that can be pumped by pump movitec.

22-23 Ooktober 2015 Workshop assembly fabrikasi cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

26-27-28 Ooktober 015

Workshop assembly fabrikasi cover couplingBase pontoonBase hand rail

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

OJT - TEKNIK MESIN PERAWATAN Page

Page 13: English

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

29 Oktober 2015Moving fire pump set and running test engine KSB 29

Test running has the engine system checks there is a system that is not running properly.

30 Oktober 015 Running test engine KSB 29

Test running has the engine system checks there is a system that is not running properly.

02 November 2015 Workshop assembly fabrikasi cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

03-06 November 2015Workshop assembly fabrikasi cover staffing box.

Cover staffing box has the function to protect the staffing box to avoid the fall of foreign objects on the site such as coal and other land.

09 November 2015 Checking engine spare part that can still be use

Checking and picking engine spare part that can still be use and spare part broken.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

OJT - TEKNIK MESIN PERAWATAN Page

Page 14: English

Hal … Dari … ( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

10 November 2015 Cleaning mounting engine

Mounting engine function as a buffer between the engine and the engine base.

11 November 2015 Cleaning oil sam and valve cover

Oil sam function as a oil shelters

Valve cover function as a protect valve and rocker arm from waste and leakage oil guard.

12 November 2015 Workshop assembly fabrikasi cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

13 November 2015 Install muffler engine Muffler function as a muffle a explosion in a combustion chamber.

16-18 November 2015 Workshop assembly fabrikasi cover coupling

Cover coupling has the function to protect the rubber coupling and rotating magnetic clutch to avoid the fall of foreign objects on the site such as coal and other land.

Saran dari Supervisor :

Nama Posisi Paraf

TEKNIK MESIN PERAWATANPOLITEKNIK NEGERI SAMARINDA

Jl. Dr. Ciptomangunkusumo Kampus Gunung Lipan Samarinda 75131Telepon : PABX (0541) 260588 – 260553 – 262018. FAX. (0541) 260355

Website : www.polnes.ac.id email : [email protected]

Hal … Dari …

OJT - TEKNIK MESIN PERAWATAN Page

Page 15: English

( On the Job Training )

LAPORAN KEGIATAN HARIAN

Nama Wahyu Widyantoro NIM 13 611 022 Lokasi OJT PT. KSB Indonesia

Date Nama Pekerjaan Rangkaian Pekerjaan

19 November 2015 5S Cleaning all workshop area.

20 November 2015 Running test engine Test running has the engine system checks there is a system that is not running properly.

Saran dari Supervisor :