Enterprise Continuity Management Program

1David Lindstedt ([email protected])

Enterprise Continuity Management Program

Program Overview to the BCP Advisory Board

01/15/09

Page 2: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

2

Agenda

• Continuity Plan Status and Objectives:– 2008– 2009– Beyond…

• LDRPS 10 Migration

• Annual “Reflections”

• BCP Federation

• Questions?

Page 3: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

3

Continuity Plan Status and Objectives

2008 FEMA-Led University-Wide Tabletop Exercise

Page 4: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

4

New ECMP Team Member!

• Matt Baldwin, CBPC• Over six years BCP experience with Nationwide and

Chase • Wealth of expertise with business continuity, IT DR,

and strategic direction

Page 5: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

5

OSU Plans in LDRPS (194 new in 2008)Area Current LDRPS Plans

Business and Finance* 67

CFAES (Columbus) 23

County Extension Offices* 89

Department of Athletics 24

Office of Academic Affairs* 16

Office of the CIO 14

Office of Human Resources 14

Office of Research 7

Pandemic Flu (all areas) 61

Regional Campuses (incl. all Wooster / ATI) 47

Student Life 57

Other (University Communications, etc.) 5

Templates, BEAP, etc 41

Total 459

Page 6: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

6

Active Work Group Status

Page 7: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

7

4-Year Non-Academic Rollout Schedule

Page 8: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

8

Partnerships and Collaboration

• Planning Partners– B&F = Gabrielle Reissland – County Extension Offices (88) = Aletha Reshan – OAA = TBD (Q1 09?)

• Business Resilience Group (BRG)– Emergency and preparedness reps from across the

university and medical center– Shared resources, information, expertise, and lessons

learned– Enterprise-wide coordination – (2009 = Virtual EOC software customization and

administration)

Page 9: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

Flow of Incident Response

AC

TIO

N

(+ O

wne

r)

Evacuation / Shelter-in-Place

(All Affected)

Emergency Response (Fire Dept., Public

Safety, EHS, Others)

Gui

ding

D

ocum

ent

Business Continuity (Individual Units /

Departments)

University Emergency Operations Center (EOC) if needed

(University Leadership)

Building Emergency Action

Plan [formerly EOEP] (EHS)

Federal, State, Local, and OSU

Guidelines

Comprehensive Emergency

Management Plan (Emergency Management Coordinator)

Continuity Plans (Individual Units /

Departments)

Time

Page 10: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

10

LDRPS 10 Migration

Page 11: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

11

L10 Conversion and Upgrade

• Requirement = Migrate from the LDRPS 9.1 platform to the redesigned 10 platform by December 2008

• 954 plans and 849 users from 10 universities successfully migrated

• Go Live = 07/21/08 • On time and on budget!!

ID Task Name Work Actual Work RemainingWork

Duration Start Finish

0 LDRPS 10 Upgrade Project 1,027.82 hrs 1,027.82 hrs 0 hrs 57.11 wks? Thu 7/5/07 Wed 8/13/08

Page 12: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

12

Advantages of New L10 System

• New look and feel (takes “old” users some getting used to)

• “Tighter” navigation• 100% customized plan navigator steps• Spell check!! • Better enterprise-level reporting capabilities

Page 13: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

13

New Dependency Mapping Capabilities(will take time to build, implement, and report)

Page 14: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

14

OSU L10 User Support Web Site and Training Videos

Page 15: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

15

Annual “Reflections”

2008 OHR Cross-Departmental Integrated Tabletop Exercise

Page 16: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

16

Vision

• The ECM Program will:– Serve as industry experts– Collaborate with all

“university resilience” entities– Partner with all areas to:

• Complete an SEM and BCP plan• Review and update the plans every six months• Exercise all plans annually

– Provide leadership in the Central Ohio community

Page 17: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

17

Our Efforts are Having a Positive Effect!

• Anecdotal Evidence:– Tunnel fire

• Those who had plans…• …and those who did not.

– Wind storm

Page 18: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

18

What We’ve Done Well

• Flexible schedules and nimble response

• Templates, cheat sheets, and “quick start” guides

• Train-the-trainer (and early adopter)

• Leader in Higher Ed• Publications and

presentations• Many accomplishments

(see handout)

Page 19: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

19

Concerns for 2009

• Participation (170 cancelled workgroup sessions in 2007 and 2008)

• Bringing completed areas back for six-month updates and annual exercises

• Bringing on the Schools and academic areas• Synthesizing and prioritizing processes and functions

across silos

Page 20: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

20

Recommendations from the BCP Steering Committee to CIO Starkoff

• Charge a member (existing or new) of the University Emergency Operations Center (EOC) to address continuity management concerns

• Encourage OSU Senior Leadership to “strengthen and promote” the university’s commitment to continuity planning

• Encourage Vice Presidents’ review and involvement

• Establish the Enterprise Continuity Management program as an OSU “Office”

• Hire a 4th FTE for the Enterprise Continuity Management program

• Encourage Board of Trustees members to inquire about continuity plans

• Coordinate with the OSUMC

Page 21: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

21

BCP Federation

2008 Student Health Center Tabletop Exercise

Page 22: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

22

Reminder of Objectives

• Share costs (determined by percent of institution’s total operating budget)– LDRPS software annual license– LDRPS administration (mostly = OSU ECM

Program staff)• Share best practices

– Quarterly conferences – Annual “summits”

• Note: Renegotiation of MOU = July, 2009

Page 23: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

23

BCP Federation

• Program underway:– CSU– MU (dropping out of BCP Fed)– OU– WSU

• Program starting:– UA

• Program pending:– NEOUCOM– UT– YSU– Shawnee State University– Ohio Board of Regents

• OSU continues to provide support for all institutions:– Regular SOR data

imports (employees, vendors, etc.)

– Customizations– LDRPS v10 expertise– General leadership

• Top issues:– Funding– July ’09 renewal of MOU

Page 24: David Lindstedt ( lindstedt.1@osu )

Enterprise Continuity Management Program

24

Questions and Discussion

2008 RecSports Tabletop Exercise