ANIL KUMAR SINGH. E-mail: [email protected] 23/467 Trilok puri India : +919452353325 Delhi-91, India - 1100091 Mobile: +9647823502743. Profession : QA/QC Engineer (Civil) Capabilities Have a professional experience in QA/QC for various projects such as residential, commercial building, Club, Hotel, Highways, Express ways, Refinery, Chemical & Gas Development Projects. Knowledge of International testing standards i.e. ACI, ASTM, BS, IS, IRC & (Morth), Familiar with International Standard Codes of Building. SUMMARY OF EXPERIENCE: 17 years in QA/QC (CIVIL) - 12 abroad + 05 India SHATT AL ARAB (5 STAR HOTEL+MALL) ,BASARA, IRAQ SHAH GAS DEVELOPMENT PROJECT PROCESS PLANT - (PACKAGE-2) SULPHUR RECOVERY UNIT – (PACKAGE-3). Jumeirah Village –III Infrastructure Development Projects. Abu Dhabi International Shooting Club, *** HOTEL (AL FORSAN), RLCC 388 No Villa + 08 Tower Abu Dhabi, U.A.E. Jumeirah Park Luxury Villa Projects (5 bed rooms with swimming pool). Dubai, U. A. E Discovery Garden's Residential Bldg project. Dubai, U. A. E. Sohar Refinery Project, OMAN. Qatar Chemical Project. QATAR. Cable stressed Bridge Project Allahabad UP. INDIA. Mumbai Pune Expressway Project India (Section –B). Delhi to Agra N.H- 02 Road Project India. Delhi to Jammu N.H.-01 Road Project India. Career Progression : 1 Company : DODSAL ENGG & CONSTN. PTE LTD. OWNER : (AL HOSAN GAS) ABU DHABI GAS DEVELOPMENT CO. LTD. PMC : FLOUR MIDDLE EAST Contractor : DODSAL/SAIPEM S.p.A. Designation : QA/QC ENGINEER (CIVIL) Award Value : 755.851 MILLION USD (Original Value). Time Duration : 30 September 2011 to till date. Job Responsibility. Structural inspection follows receiving material inspection, Preliminary alignment, and high strength Tightening of high strength bolts (ASTM 325M) by Turn of nut method in accordance with AISC and Design General Specification. Carry out pre- tensioning installation verification of high strength bolts by tension Page 1 of 6

Transcript of CURRICULAM_VITAE_QC

Page 1: CURRICULAM_VITAE_QC

ANIL KUMAR SINGH. E-mail: [email protected] 23/467 Trilok puri India : +919452353325Delhi-91, India - 1100091 Mobile: +9647823502743.

Profession : QA/QC Engineer (Civil)Capabilities

Have a professional experience in QA/QC for various projects such as residential, commercial building, Club, Hotel, Highways, Express ways, Refinery, Chemical & Gas Development Projects.

Knowledge of International testing standards i.e. ACI, ASTM, BS, IS, IRC & (Morth), Familiar with International Standard Codes of Building.

SUMMARY OF EXPERIENCE: 17 years in QA/QC (CIVIL) - 12 abroad + 05 IndiaSHATT AL ARAB (5 STAR HOTEL+MALL) ,BASARA, IRAQ

SHAH GAS DEVELOPMENT PROJECT PROCESS PLANT - (PACKAGE-2) SULPHUR RECOVERY UNIT – (PACKAGE-3).

Jumeirah Village –III Infrastructure Development Projects.Abu Dhabi International Shooting Club, *** HOTEL (AL FORSAN), RLCC 388 No Villa + 08 Tower Abu Dhabi, U.A.E.Jumeirah Park Luxury Villa Projects (5 bed rooms with swimming pool). Dubai, U. A. EDiscovery Garden's Residential Bldg project. Dubai, U. A. E.Sohar Refinery Project, OMAN.Qatar Chemical Project. QATAR.Cable stressed Bridge Project Allahabad UP. INDIA.Mumbai Pune Expressway Project India (Section –B).Delhi to Agra N.H- 02 Road Project India.Delhi to Jammu N.H.-01 Road Project India.

Career Progression :1 Company : DODSAL ENGG & CONSTN. PTE LTD. OWNER : (AL HOSAN GAS) ABU DHABI GAS DEVELOPMENT CO. LTD.

PMC : FLOUR MIDDLE EASTContractor : DODSAL/SAIPEM S.p.A.Designation : QA/QC ENGINEER (CIVIL) Award Value : 755.851 MILLION USD (Original Value).Time Duration : 30 September 2011 to till date. Job Responsibility. Structural inspection follows receiving material inspection, Preliminary alignment, and high strength Tightening of high strength bolts (ASTM 325M) by Turn of nut method in accordance with AISC and Design

General Specification. Carry out pre-tensioning installation verification of high strength bolts by tension calibrator to ensure required pre-tensioning in compliance with AISC. Installation and verification of DTI (Direct Tension indicator F959) washer tightening by number of entries / refusal of feeler gauge at 0.125mm. Raise the RFI & after inspection close it.

Planning and timely Inspection of UNIT-720: Slug Clutcher,721&722- Inlet Separation, Condensate Stabilisation and Gas Sweetening.

Send the required documents related to QA/QC at main office every day. Preparing and maintaining the applicable QC programme which includes QC procedures, inspection & test

plans and check lists. Co-ordination with QA/QC management team for preparing Inspection and Test Plan (ITP) as well as Quality

Control Procedures (QCP) and generation of check list for above concerned activities. Inspection / supervision of site-in situ concrete items, like equipment foundation, steel structure foundations for

pipe racks, Compressor Foundations, Pump Foundations, Pedestals, Vessel Foundations, Catch Basin and manholes etc.

Testing of moisture contents of concrete by Elcometer or by Plastic Sheet method prior to Bituminous Coating

Page 1 of 4

Page 2: CURRICULAM_VITAE_QC

of Concrete Foundations and Pedestals. Inspection of Bituminous coating and severe atmospheric resistant painting of concrete and checking of film

thickness of coating/painting by WFT gauge and DFT gauge. Inspection / supervision of concrete pavements. Inspection / Supervision of Non-Shrink Cementitious Grout for structural items, manholes, catch basins and

Epoxy grout for pumps and compressor (more than 750 KW), other equipments. Inspection of materials used for concerned activities as per Company Material Approval list and manufacturer's

data sheet. Inspection of vessels (approval epoxy paint) before start fire proofing and final inspection.

2 Company : Fibrex Construction GroupConsultant : ENGINEERING CONSULTANTS AND GROUP & Management IMCCProject: ABU DHABI INTERNATIONAL SHOOTING CLUB RESIDENTIAL LEISURE AND COMRCIAL COMPOUNDJob Description : 388 Villas, 8 Apartments G+8 Floor and Community Center *** HOTEL( AL

FORSAN) .Abu Dhabi, UAE Designation : QA/QC Engineer.

Inspection of incoming material and prepare MIR for approval of Consultants. Review of all test results for Concrete, Soil, cement, Block works etc. Coordination with field staff for smooth operation and achieving good quality of works. Documentation of weekly and monthly quality Reports. All infrastructure Sub contractor work monitoring and submission for approval. Efficiently handled issuance of the non-conformances and follow up the remedial action. Inspection of Piling works completed No. of piles 12500 ( 450 to 900 mm) and monitoring pile head

treatment, integrate test each piles, Static Load Tests (124 No). Inspection of underground works backfilling, grade slab, all retaining wall water proofing , make sure MEP

Approval. Daily Basis Inspection structural COLUMN, RETAINING WALL, SLAB. Daily Basis inspection Architectural block work lay out ,during installation and final inspection( all openings,

lintel bearing ,make sure MEP item as per drawing, MEP Approval for Pre plaster ,Final plaster, curing, tile layout ) as per drawing, final ( hollow sound, clay roof tiles, GRC works ,foam concrete at roof ( heat resistance ).Joinery work, false ceiling ,

Inspection of final plaster for start painting. Monthly 90-100 slab casting programmed ( with 4 group ) team of construction , maintain the quality make

sure all inspection to be attended/ approved for casting ,scaffolding to be joint checked with third party and get approval ( aluma ).

3 Company : DODSAL ENGG & CONSTN. PTE LTD

Consultant : Dar Al Handasah & Management by Bovis Lend LeaseJob Description : Jumeirah Park 377 no 5 Bed room Luxury Villas Project .Dubai Period : March 2006 to Oct -2009.Designation : QC Inspector.

Assessing the quality of all incoming material and prepare MIR for approval of Consultants. Review of all test results for Concrete, Soil, cement, Block works etc. Day to day inspection of Architectural & Structural works as per Drawings. Make training program start new activity (Block works, plaster, tiling, painting, and water proofing material

proper stocking) & closeout of customer complaint. Supervising all construction activity including providing technical input for methodologies of construction &

coordination with site management activities.

4 Company : DODSAL ENGG & CONSTN. PTE LTDConsultant : ECG & Management by TURNERPeriod : March 2006 to Sep -2008.Job Description : 27 No G+5 Residential Building Project, (2145 Flats).Designation : QC Inspector.

Page 2 of 4

Page 3: CURRICULAM_VITAE_QC

Prepared of final documents (TOC, Snag, Desnags, and warranty guaranty certificate EHS, CED Inspection) & All MEP documents collect from subcontractor for final hand over.

Preparation of ITP, Method statements. Assist in internal and external quality audit Review of all test results for Concrete, Soil works and paving fnds. Day to day inspection of civil & Structural works as per Drawings. Coordination with field staff for smooth operation and achieving good quality of works. Documentation of weekly and monthly quality Reports. Sub contractor work monitoring and submission for approval. All testing and commissioning GARBAGE Chute, ELEVATOR, Fire Alarm etc.

5 Company : DODSAL ENGG & CONSTN. PTE LTDClient : Japan Gas Company.Period : 10 Dec, 2003 to 15 Dec, 2005.Job Description : Off Site, Tanks, Sleepers, Dike wall & internal Roads.Designation : Jr. Q.C.Inspector

Use of Nucleonic Gauges from HUMBOLDT IMC USA Prepared of work procedures, structural concrete, precast and insitu, UG pipe (100" FRP line), tanks

foundation, dike wall and back filling works. Inspection of execution works as per RFIA (pump fdns, sleeper, tank foundation) Inspection of piling works (done by Rotary Rig (BAUER Marks Germany) No. of piles 5000 ( 450 to 900 mm) and inspection of pile load test (3 no). Inspection of incoming material and prepare MIR for approval of Consultants. Assist in internal and external quality audit . Punch list finalization, prepared all final documentation during handover.

6 Company : Hindustan Construction Co. LtdJob Description : Cable Stayed Bridge across River Yamuna at Allahabad UP, India

4 Lane Bridges (1.2 KM) lengths (Main Spain Length -260 m.).Period : Oct, 2002 to Dec 2003Designation : QC Engineer

In charge of B /Plant production and dispatches as per site requisition, fully computerized having capacity 120 cum./ hrs with strict quality at site by performing all testing & adjustment as per specification.

Design of different grade i.e. M10, M20, M30, M40 etc as per standard IS –10262, SP-23. All quality documents and related testing reports review as per project specifications.

7 Company : DODSAL ENGG & CONSTN. PTE LTDOwner /Client : Qatar Petroleum /KBR & TECHNIP Period : July 2000 to June 2002.Job Description : Ethylene plant, Sulfur Recovery Unit & off Site.Designation : Lab Technician.

Use of Nuclear Gauges for Field Density of soil, Base Course. Conducted concrete mix design Grade C20, C35 & C10 (fire proofing) as per ASTM and BS & Non shrinkage

grout & Epoxy works monitor at site as per procedure. Carried out various tests such as Soil, Aggregate, Cement, Base & Sub Base by using in-house lab facility and

evaluation of chemical test done by third party. Independent handling of batching plant, production and quality control work. Batching plant calibration and maintain trend analysis.

8 Company : Hindustan Construction Co. Ltd, IndiaPeriod : Jan. 1999 to July 2000.Job Description : Concrete Pavement Road Design 120Km / hrs, Expressway Project.Designation : Lab Technician.Responsibilities :

Inspection of incoming materials and it's testing such as Soil, Cement, Aggregate, Asphalt & Pavement concrete

Page 3 of 4

Page 4: CURRICULAM_VITAE_QC

and prepare reports as per specification. Tests of Aggregates. (Clay Lumps, Fineness, Silt Content, EI & FI, Crushing & Impact Value, 10% Fineness

etc.) Assisting for mix design in different grade i.e. M-10, 20, 30, 40 etc as per Indian standard IS 10262, SP23. Concrete used is various work including Pavement Quality Concrete, structural work (M-30, M-40)& Sub Base course i.e. Dry lane Concrete& testing (Compressive strength, Split tensile, Flexure test) Cement, (Consistency, Initial setting& Final setting, Soundness, Compressive Strength.)

It involved – production of B/ Plant “SIMEM” (From Italy) which is fully computerized having capacity of 120M3/ hrs with strict quality at site. Material testing and adjustment as per technical specification.

(One time continuous production of 1600m3 & paving under my Supervision). Involved in mix design Base, Sub Base and DLC, F/L, GSB, WMM suggestive corrective action wherever

required by testing gradation, moisture content base course material production of plant as per design. Earth work, Proctor value, silt Content, CBR, Atterberg’s limit, Direct Shear test, Unconfined Compressive

Strength, Plate load test to evaluate k- value of sub grade reaction Dynamic cone penetration test Field density by Sand replacement & Nuclear method (Hambolt).

9 Company : Progressive Construction Ltd., India.Consultant : Consulting Engineering Service India Ltd.,Period : Jan. 1997 to April 1998.Job Description : N.H –2 (Four Lane National highway Project).

10 Company : Trafalgar House Construction India Ltd. Period : July1996 to Nov.1997.

Job Description : N.H – 1 (Four Lane National highway Project).

EDUCATIONAL QUALIFICATION :

: Diploma in Civil Engineering.: Diploma in Total Quality Management & ISO 9000.: Training of Nucleonic Gauges from HUMBOLDT IMC USA.: IT I Indl. Training Institute 02Year Course1992.

Computer Skill : MS Word, MS Excel, MS PowerPoint

Personal Details Date of Birth : 25August 1969.

Marital Status : Married. Fluent In : English, Hindi. Arabic (Basic). Passport No. : R- 924014, Validity–2014, Issue from Oman Driving License No : FZD-08-603/02Current CTC : 9500 Dirhams + accommodation+ food+ leave cycle 06month

Joining time : 45days

The details furnished above are correct and true to the best of my knowledge and belief.