NO ITEM PEKERJAAN VOL MATERIALPLYWOOD 12 MM KAYU GELAM KAYU 3/7 KAYU 5/5 & 5/7 PAKU 3''
TYPE A
1 KOLOM PEDESTAL 40 X 25 2 BH 0.40 : 2.98 0.13 Kpg 16 1.15 18.40 2 16 128PANJANG 0.4 18.4 : 3.7 4.97 Btg 0.64LEBAR 0.25 0.07
KOLOM PEDESTAL 40 X 40 23 BH 26.45 : 2.98 8.89 Kpg 184 0.26 47.84PANJANG 1.15 47.84 : 3.7 12.93 BtgLEBAR 0.5 0.18
184 0.36 66.2466.24 : 3.7 17.90 Btg
0.25
2 KOLOM PEDESTAL 40 X 40 7 BH 6.44 : 2.98 2.16 Kpg 56 1.15 64.40 7 16 448PANJANG 1.15 64.4 : 3.7 17.41 Btg 2.24LEBAR 0.4 0.24
KOLOM PEDESTAL 40 X 40 7 BH 8.05 : 2.98 2.70 Kpg 56 0.26 14.56PANJANG 1.15 14.56 : 3.7 3.94 BtgLEBAR 0.5 0.06
56 0.36 20.1620.16 : 3.7 5.45 Btg
0.08
2 KOLOM PEDESTAL 30 X 30 13 BH 8.97 : 2.98 3.01 Kpg 104 1.15 119.60 13 16 832PANJANG 1.15 119.6 : 3.7 32.32 Btg 4.16LEBAR 0.3 0.45
KOLOM PEDESTAL 30 X 30 13 BH 11.96 : 2.98 4.02 Kpg 104 0.16 16.64PANJANG 1.15 16.64 : 3.7 4.50 BtgLEBAR 0.4 0.06
104 0.26 27.0427.04 : 3.7 7.31 Btg
0.10
3 KOLOM 40 X 40 23 BH 77.28 : 2.98 25.96 Kpg 184 x 4.2 772.80 23 56 5152PANJANG 4.2 772.8 : 3.7 208.86 Btg 25.76LEBAR 0.4 2.92
KOLOM 40 X 40 23 BH 96.60 : 2.98 32.45 Kpg 644 x 0.26 167.44PANJANG 4.2 167.44 : 3.7 45.25 BtgLEBAR 0.5 0.63
644 x 0.36 231.84231.84 : 3.7 62.66 Btg
0.88
4 KOLOM 40 X 40 7 BH 23.52 : 2.98 7.90 Kpg 56 x 4.2 235.20 7 56 1568PANJANG 4.2 235.2 : 3.7 63.57 Btg 7.84LEBAR 0.4 0.89
KOLOM 40 X 40 7 BH 29.40 : 2.98 9.88 Kpg 196 x 0.26 50.96PANJANG 4.2 50.96 : 3.7 13.77 BtgLEBAR 0.5 0.19
196 x 0.36 70.5670.56 : 3.7 19.07 Btg
0.27
KOLOM 30 X 30 13 BH 32.76 : 2.98 11.01 Kpg 104 x 4.2 436.80 13 56 2912PANJANG 4.2 436.8 : 3.7 118.05 Btg 14.56LEBAR 0.3 1.65
KOLOM 30 X 30 13 BH 43.68 : 2.98 14.67 Kpg 364 x 0.16 58.24
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
PANJANG 4.2 58.24 : 3.7 15.74 BtgLEBAR 0.4 0.22
364 x 0.26 94.6494.64 : 3.7 25.58 Btg
0.36
PONDASI TANGGA 2 4.26 : 2.98 1.43 Kpg 14 X 1.15 16.10 48 X 2 96PANJANG 1.15 6.9 0.38 2.62 96 200 0.48LEBAR 1.7 10.2 0.35 3.57PANJANG 1.15 22.29LEBAR 0.15 0.22
PLAT TANGGA 2 14.17 : 2.98 4.76 Kpg 6 X 4.13 24.78 3 X 4.13 12.39PANJANG 4.168 6 X 3.95 23.70 1 5.35 5.35LEBAR 1.7 6 X 3.8 22.80 1 3.4 3.40
6 X 3.6 21.60 50 1.7 85.006 X 3.45 20.70 28.69 0.2416 X 3.25 19.506 X 3.1 18.606 X 2.9 17.406 X 2.75 16.506 X 2.55 15.306 X 2.4 14.406 X 2.2 13.206 X 2.05 12.306 X 1.96 11.766 X 1.8 10.806 X 1.6 9.606 X 1.45 8.706 X 1.26 7.566 X 1.08 6.486 X 0.91 5.466 X 0.73 4.386 X 0.56 3.366 X 0.38 2.286 X 0.21 1.26
312.42 : 3.8 82.22 Btg
PLAT BORDES TANGGA 1 6.21 : 2.98 2.09 Kpg 12 X 6 72.00 36 X 1.75 63.00 36 X 3 108PANJANG 3.55 72.00 1.96 141.12 18 X 3.55 63.90 18 X 3 54LEBAR 1.75 141.12 : 3.8 37.14 Btg 34.30 0.2881 162 : 200 0.81
BALOK BORDES 1 3.87 : 2.98 1.30 Kpg 7 X 2 14.00 7 X 0.35 0.66 6 X 3.55 21.30 14 X 3 42PANJANG 3.55 14.00 1.96 27.44 24 X 0.4 9.60 24 X 2 48LEBAR 0.5 27.44 : 3.8 7.22 Btg 0.66 0.0056 12 X 0.25 3.00 12 X 2 24TINGGI 0.35 33.90 : 3.7 9.16 0.09 114 : 200 0.57
KOLOM BORDES 2 4.70 : 2.98 1.58 Kpg 8 X 1.96 15.68 8 X 12 96PANJANG 1.96 15.68 1.96 30.73 96 : 200 0.48LEBAR 0.25 30.73 : 3.8 8.09 BtgTINGGI 0.35 6 X 0.15 0.90
0.90 : 3.8 0.24 Btg6 X 0.25 1.50
1.50 : 3.8 0.39 Btg
8.72 0.09
Begisting Balok B1. 250 x 500 5 bh 31.82 : 2.98 10.69 Kpg 21 X 10 210 21 X 10 210.00 84 X 40 3360PANJANG 6.3 m 0.28 X 210 58.8 0.28 X 210 58.80 3360 : 200 16.8TINGGI 0.38 m 58.8 : 3.7 15.89 16.8LEBAR 0.25 m 2 X 30 60.00
6.3 X 60 378.00378 : 3.7 102.165 X 21 105.00
0.15 X 105 15.75
M³
M³
M³
M³
M³
M³M³
M³
15.75 : 3.7 4.265 X 21 105.00
0.35 X 105 36.7536.75 : 3.7 9.93
132.24 1.32
Begisting Balok B1. 250 x 500 18 bh 123.62 : 2.98 41.53 Kpg 23 X 36 828.00 92 X 144 13248PANJANG 6.8 m 0.28 X 828 231.84 13248 : 200 66.24TINGGI 0.38 m 231.84 : 3.7 62.66 66.24LEBAR 0.25 m 6 X 18 108.00
6.8 X 108 734.40734.4 : 3.7 198.49
18 X 23 414.000.15 X 414 62.1062.1 : 3.7 16.7818 X 23 414.00
0.35 X 414 144.90144.9 : 3.7 39.16
317.09 3.17
Begisting Balok B1. 250 x 500 16 bh 93.73 : 2.98 31.49 Kpg 19 X 32 608.00 76 X 128 9728PANJANG 5.8 m 0.28 X 608 170.24 9728 : 200 48.64TINGGI 0.38 m 170.24 : 3.7 46.01 48.64LEBAR 0.25 m 6 X 16 96.00
6.8 X 96 652.80652.8 : 3.7 176.43
16 X 23 368.000.15 X 368 55.2055.2 : 3.7 14.9216 X 23 368.00
0.35 X 368 128.80128.8 : 3.7 34.81
272.17 2.72
Begisting Balok Uk. 200 x 400 17 bh 28.04 : 2.98 9.42 Kpg 7 X 34 238.00 28 X 136 3808PANJANG 2.17 m 0.18 X 238 42.84 3808 : 200 19.04TINGGI 0.28 m 42.84 : 3.7 11.58 19.04LEBAR 0.2 m 6 X 17 102.00
2.17 X 102 221.34221.34 : 3.7 59.82
7 X 34 238.000.2 X 238 47.6047.6 : 3.8 12.53
7 X 28 196.000.25 X 196 49.0049 : 3.7 13.24
97.17 0.97
Begisting Balok Uk. 200 x 400 6 BH 16.87 : 2.98 5.67 Kpg 13 X 12 156.00 26 X 48 1248PANJANG 3.7 m 0.18 X 156 28.08 1248 : 200 6.24TINGGI 0.28 m 28.08 : 3.7 7.59 6.24LEBAR 0.2 m 6 X 6 36.00
3.7 X 36 133.20133.2 : 3.7 36.00
13 X 6 78.000.2 X 78 15.6015.6 : 3.7 4.2213 X 6 78.00
0.25 X 78 19.5019.5 : 3.7 5.27
53.08 0.53
Begisting Balok Uk. 200 x 400 6 BH 17.86 : 2.98 6.00 Kpg 10 X 12 120.00 40 X 48 1920PANJANG 3.1 m 0.18 X 120 21.60 1920 : 200 9.6TINGGI 0.38 m 21.6 : 3.7 5.84 9.6LEBAR 0.2 m 6 X 6 36.00
3.1 X 36 111.60111.6 : 3.7 30.16
10 X 6 60.000.2 X 60 12.0012 : 3.7 3.24
M³
M³
M³
M³
M³
10 X 6 60.000.25 X 60 15.0015 : 3.7 4.05
43.30 0.43
Begisting Balok Uk. 300 x 600 28 bh 239.90 : 2.98 80.59 Kpg 23 X 56 1288.00 92 X 224 20608PANJANG 6.8 m 0.38 X 1288 489.44 20608 : 200 103.04TINGGI 0.48 m 489.44 : 3.7 132.28 103.04LEBAR 0.3 m 6 X 28 168.00
6.8 X 168 1142.401142.4 : 3.7 308.76
23 X 56 1288.000.2 X 1288 257.60
257.6 : 3.7 69.6223 X 28 644.00
0.25 X 644 161.00161 : 3.7 43.51
554.17 5.54
Begisting Balok Uk. 400 x 800 20 bh 137.36 : 2.98 46.14 Kpg 14 X 40 560.00 56 X 160 8960PANJANG 6.8 m 0.58 X 560 324.80 8960 : 200 44.8TINGGI 0.38 m 324.8 : 3.7 87.78 44.8LEBAR 0.25 m 8 X 20 160.00
4.1 X 160 656.00656 : 3.7 177.3014 X 40 560.000.3 X 560 168.00168 : 3.7 45.4114 X 28 392.000.5 X 392 196.00196 : 3.7 52.97
363.46 3.63
Begisting Balok Uk. 300 x 500 1 bh 6.04 : 2.98 2.03 Kpg 14 X 40 560.00 56 X 8 448PANJANG 5.7 m 0.58 X 560 324.80 448 : 200 2.24TINGGI 0.38 m 324.8 : 3.7 87.78 2.24LEBAR 0.3 m 8 X 20 160.00
4.1 X 160 656.00656 : 3.7 177.3014 X 40 560.000.3 X 560 168.00168 : 3.7 45.4114 X 28 392.000.5 X 392 196.00196 : 3.7 52.97
363.46 3.63
Begisting Balok B6. 150 x 200 1 bh 55.00 : 2.98 18.48 Kpg 1 X 6 6.00PANJANG 100 m 100 X 6 600.00TINGGI 0.2 m 600 : 3.7 162.16 0LEBAR 0.15 m
162.16 1.62
Begisting Balok BK 1. 250 x 500 4 bh 12.93 : 2.98 4.34 Kpg 9 X 12 108.00 36 X 32 1152PANJANG 3.2 m 0.28 X 108 30.24 1152 : 200 5.76TINGGI 0.38 m 30.24 : 3.7 8.17 5.76LEBAR 0.25 m 2 X 36 72.00
2.6 X 72 187.20187.2 : 3.7 50.59
6 X 8 48.000.15 X 48 7.207.2 : 3.7 1.956 X 8 48.00
0.35 X 48 16.8016.8 : 3.7 4.54
65.25 0.65
Begisting Balok BK 1. 250 x 500 6 bh 15.76 : 2.98 5.29 Kpg 9 X 12 108.00 36 X 48 1728PANJANG 2.6 m 0.28 X 108 30.24 1728 : 200 8.64TINGGI 0.38 m 30.24 : 3.7 8.17 8.64
M³
M³
M³
M³
M³
M³
LEBAR 0.25 m 2 X 36 72.002.6 X 72 187.20
187.2 : 3.7 50.596 X 8 48.00
0.15 X 48 7.207.2 : 3.7 1.956 X 8 48.00
0.35 X 48 16.8016.8 : 3.7 4.54
65.25 0.65Plat lantai 28 bh 453.60 : 2.98 ### KpgPanjang 4.5 m 4.5 x 12 1512.00 408.65 Btg 12 15 180Lebar 3.6 m 3.6 x 15 1512.00 408.65 Btg 180 2 360
817.30 Btg 360 28 100808.17 10080 : 200 50.4
Plat lantai 2 bh 25.20 : 2.98 8.47 KpgPanjang 4.5 m 4.5 x 10 90.00 24.32 Btg 10 X 15 150Lebar 2.8 m 2.8 x 15 84.00 22.70 Btg 150 X 2 300
47.03 Btg 300 X 2 6000.47 600 : 200 3
Plat lantai 2 bh 36.00 : 2.98 12.09 KpgPanjang 4.5 m 4.5 x 14 126.00 34.05 Btg 14 X 15 210Lebar 4 m 4 x 15 120.00 32.43 Btg 210 X 2 420
66.49 Btg 420 X 2 8400.66 840 : 200 4.2
Plat lantai 2 bh 30.60 : 2.98 10.28 KpgPanjang 4.5 m 4.5 x 12 108.00 29.19 Btg 12 X 15 180Lebar 3.4 m 3.4 x 15 102.00 27.57 Btg 180 X 2 360
56.76 Btg 360 X 2 7200.57 720 : 200 3.6
Plat lantai 28 bh 302.40 : 2.98 ### KpgPanjang 3.6 m 3.6 x 10 1008.00 272.43 Btg 10 X 12 120Lebar 3 m 3 x 12 1008.00 272.43 Btg 120 X 2 240
544.86 Btg 240 X 28 67205.45 6720 : 200 33.6
Plat lantai 2 bh 16.80 : 2.98 5.64 KpgPanjang 2.8 m 2.8 x 10 56.00 15.14 Btg 10 X 10 100Lebar 3 m 3 x 10 60.00 16.22 Btg 100 X 2 200
31.35 Btg 200 X 2 4000.31 400 : 200 2
Plat lantai 2 bh 24.00 : 2.98 8.06 KpgPanjang 4 m 4 x 10 80.00 21.62 Btg 10 X 14 140Lebar 3 m 3 x 14 84.00 22.70 Btg 140 X 2 280
44.32 Btg 280 X 2 5600.44 560 : 200 2.8
Plat lantai 2 bh 20.40 : 2.98 6.85 KpgPanjang 3.4 m 3.4 x 10 68.00 18.38 Btg 10 X 12 120Lebar 3 m 3 x 12 72.00 19.46 Btg 120 X 2 240
37.84 Btg 240 X 2 4800.38 480 : 200 2.4
Plat lantai 14 bh 187.49 : 2.98 62.98 KpgPanjang 3.72 m 3.72 x 12 624.96 168.91 Btg 12 X 13 156Lebar 3.6 m 3.6 x 13 655.20 177.08 Btg 156 X 2 312
345.99 Btg 312 X 14 43683.46 4368 : 200 21.84
SIRIP 64 95.36 : 2.98 32.03 Kpg 64 X 7.65 489.60 64 X 12 7681.49 489.6 : 3.7 132.32 Btg 768 : 200 3.84
1.32
DAK KANOPI 32 63.36 : 2.98 21.28 Kpg 32 X 6.8 217.60 32 X 16 5121.98 217.6 : 3.7 58.81 Btg 512 : 200 2.56
0.59
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M²M³
M²M³
RING BALOK RB1 350 X 500 14 104.33 : 2.98 35.05 Kpg 23 X 14 322.00 92 X 112 10304PANJANG 6.9 m 0.28 X 322 90.16 10304 : 200 51.52LEBAR 0.35 m 90.16 : 3.7 24.37 51.52TINGGI 0.38 m 14 X 6 84.00
6.9 X 84 579.60579.6 : 3.7 156.65
23 X 14 322.000.25 X 322 80.5080.5 : 3.7 21.7623 X 14 322.00
0.35 X 322 112.70112.7 : 3.7 30.46
233.23 2.33
RING BALOK RB1 350 X 500 2 7.99 : 2.98 2.68 Kpg 12 X 2 24.00 48 X 16 768PANJANG 3.7 m 0.28 X 24 6.72 768 : 200 3.84LEBAR 0.35 m 6.72 : 3.7 1.82 3.84TINGGI 0.38 m 2 X 6 12.00
6.9 X 12 82.8082.8 : 3.7 22.3812 X 2 24.00
0.25 X 24 6.006 : 3.7 1.6212 X 2 24.00
0.35 X 24 8.408.4 : 3.7 2.27
28.09 0.28
RING BALOK RB1 350 X 500 2 12.31 : 2.98 4.14 Kpg 19 X 2 38.00 76 X 16 1216PANJANG 5.7 m 0.38 X 38 14.44 1216 : 200 6.08LEBAR 0.3 m 14.44 : 3.7 3.90 6.08TINGGI 0.48 m 2 X 6 12.00
6.9 X 12 82.8082.8 : 3.7 22.3819 X 2 38.00
0.25 X 38 9.509.5 : 3.7 2.5719 X 2 38.00
0.35 X 38 13.3013.3 : 3.7 3.59
32.44 0.32
RING BALOK RB1A 300 X 600 2 18.79 : 2.98 6.31 Kpg 29 X 2 58.00 116 X 16 1856PANJANG 8.7 m 0.38 X 58 22.04 1856 : 200 9.28LEBAR 0.3 m 22.04 : 3.7 5.96 9.28TINGGI 0.48 m 2 X 6 12.00
6.9 X 12 82.8082.8 : 3.7 22.3829 X 2 58.00
0.25 X 58 14.5014.5 : 3.7 3.9229 X 2 58.00
0.35 X 58 20.3020.3 : 3.7 5.49
37.74 0.38
RING BALOK 200 X 400 3 6.32 : 2.98 2.12 Kpg 10 X 3 30.00 40 X 24 960PANJANG 3.1 m 0.18 X 30 5.40 960 : 200 4.8LEBAR 0.2 m 5.4 : 3.7 1.46 4.8TINGGI 0.28 m 3 X 6 18.00
6.9 X 18 124.20124.2 : 3.7 33.57
10 X 3 30.000.25 X 30 7.507.5 : 3.7 2.0310 X 3 30.00
0.35 X 30 10.5010.5 : 3.7 2.84
39.89 0.40
RING BALOK 200 X 400 3 5.10 : 2.98 1.71 Kpg 8 X 3 25.00 33.333 X 24 800
M³
M³
M³
M³
M³
PANJANG 2.5 m 0.18 X 25 4.50 800 : 200 4LEBAR 0.2 m 4.5 : 3.7 1.22 4TINGGI 0.28 m 3 X 6 18.00
6.9 X 18 124.20124.2 : 3.7 33.578.3333 X 3 25.000.25 X 25 6.256.25 : 3.7 1.69
8.3333 X 3 25.000.35 X 25 8.758.75 : 3.7 2.36
38.84 0.39
RING BALOK 200 X 400 20 31.96 : 2.98 10.74 Kpg 8 X 20 160.00 32 X 160 5120PANJANG 2.35 m 0.18 X 160 28.80 5120 : 200 25.6LEBAR 0.2 m 28.8 : 3.7 7.78 25.6TINGGI 0.28 m 20 X 6 120.00
6.9 X 120 828.00828 : 3.7 223.788 X 20 160.00
0.25 X 160 40.0040 : 3.7 10.818 X 20 160.00
0.35 X 160 56.0056 : 3.7 15.14
257.51 2.58
RING BALOK 250 X 500 1 7.79 : 2.98 2.62 Kpg 8 X 1 8.00 32 X 8 256PANJANG 8.85 m 0.28 X 8 2.24 256 : 200 1.28LEBAR 0.25 m 2.24 : 3.7 0.61 1.28TINGGI 0.38 m 1 X 6 6.00
6.9 X 6 41.4041.4 : 3.7 11.19
8 X 1 8.000.25 X 8 2.00
2 : 3.7 0.548 X 1 8.00
0.35 X 8 2.802.8 : 3.7 0.76
13.09 0.13
RING BALOK 250 X 500 1 5.15 : 2.98 1.73 Kpg 8 X 1 8.00 32 X 8 256PANJANG 5.85 m 0.28 X 8 2.24 256 : 200 1.28LEBAR 0.25 m 2.24 : 3.7 0.61 1.28TINGGI 0.38 m 1 X 6 6.00
6.9 X 6 41.4041.4 : 3.7 11.19
8 X 1 8.000.25 X 8 2.00
2 : 3.7 0.548 X 1 8.00
0.35 X 8 2.802.8 : 3.7 0.76
13.09 0.13
DAK ATAP 14 BH 227.01 : 2.98 76.26 Kpg 23 X 14 322.00 184 X 56 10304PANJANG 6.9 m 2.35 X 322 756.70 10304 : 200 51.52LEBAR 2.35 m 756.7 : 3.7 204.51 51.52
8 X 14 112.006.9 X 112 772.80
772.8 : 3.7 208.86
413.38 4.13
DAK ATAP 2 BH 14.57 : 2.98 4.89 Kpg 10 X 2 20.67 82.667 X 8 661.33PANJANG 3.1 m 2.35 X 20.667 48.57 661.33 : 200 3.3067LEBAR 2.35 m 48.567 : 3.7 13.13 3.3067
8 X 2 16.006.9 X 16 110.40
110.4 : 3.7 29.84
M³
M³
M³
M³
M³
42.96 0.43
DAK ATAP 2 BH 17.39 : 2.98 5.84 Kpg 12 X 2 24.67 98.667 X 8 789.33PANJANG 3.7 m 2.35 X 24.667 57.97 789.33 : 200 3.9467LEBAR 2.35 m 57.967 : 3.7 15.67 3.9467
8 X 2 16.006.9 X 16 110.40
110.4 : 3.7 29.84
45.50 0.46
DAK ATAP 2 BH 14.57 : 2.98 4.89 Kpg 10 X 2 20.67 82.667 X 8 661.33PANJANG 3.1 m 2.35 X 20.667 48.57 661.33 : 200 3.3067LEBAR 2.35 m 48.567 : 3.7 13.13 3.3067
8 X 2 16.006.9 X 16 110.40
110.4 : 3.7 29.84
42.96 0.43
DAK ATAP 1 BH 51.41 : 2.98 17.27 Kpg 65 X 1 64.67 517.33 X 4 2069PANJANG 19.4 m 2.65 X 64.667 171.37 2069 : 200 10.347LEBAR 2.65 m 171.37 : 3.7 46.32 10.347
8 X 1 8.006.9 X 8 55.2055.2 : 3.7 14.92
61.23 0.61
DAK ATAP 1 BH 63.05 : 2.98 21.18 Kpg 65 X 1 64.67 517.33 X 4 2069PANJANG 19.4 m 3.25 X 64.667 210.17 2069 : 200 10.347LEBAR 3.25 m 210.17 : 3.7 56.80 10.347
8 X 1 8.006.9 X 8 55.2055.2 : 3.7 14.92
71.72 0.72
M³
M³
M³
M³
M³
MATERIALPAKU 3'' PAKU 1''
Bh 12 16 192.00Kg 0.19 Kg
Bh 12 56 672.00Kg 0.67 Kg
Bh 12 104 1248.00Kg 1.25 Kg
Bh 42 184 7728.00Kg 7.73 Kg
Bh 42 56 2352.00Kg 2.35 Kg
Bh 42 104 4368.00Kg 4.37 Kg
1.15 : 0.05 23.00Kg 23 X 6 138.00 BH
1.7 : 0.05 34.0034 X 6 204.00 BH342 1000 0.34 Kg
3.89 : 0.05 77.8077.8 X 4 311.20 BH1.7 : 0.05 34.0034 X 4 136.00 BH
447.2 1000 0.45 Kg
3.55 : 0.05 71.0071 X 4 284.00 BH
Kg 1.75 : 0.05 35.0035 X 4 140.00 BH424 : 1000 0.42 Kg
3.55 : 0.05 71.0071 X 6 426.00 BH426 : 1000 0.43 Kg
Kg
1.96 : 0.05 39.20Kg 39.2 X 4 156.80 BH
156.8 : 1000 0.16 Kg
6.3 : 0.1 63.0063 X 30 1890.00
Kg 1953 : 1000 1.951.95 Kg
6.8 : 0.1 68.0068 X 108 7344.00
Kg 7412 : 1000 7.417.41 Kg
5.8 : 0.1 58.0058 X 96 5568.00
Kg 5626 : 1000 5.635.63 Kg
2.17 : 0.1 21.7021.7 X 102 2213.40
Kg 2235.1 : 1000 2.242.24 Kg
3.7 : 0.1 37.0037 X 36 1332.00
Kg 1369 : 1000 1.371.37 Kg
3.1 : 0.1 31.0031 X 36 1116.00
Kg 1147 : 1000 1.151.15 Kg
6.8 : 0.1 68.0068 X 168 ###
Kg 11492 : 1000 11.4911.49 Kg
6.8 : 0.1 68.0068 X 120 8160.00
Kg 8228 : 1000 8.238.23 Kg
5.7 : 0.1 57.0057 X 6 342.00
Kg 399 : 1000 0.400.40 Kg
100 : 0.1 1000.001000 X 6 6000.00
Kg 7000 : 1000 7.007.00 Kg
3.2 : 0.1 32.0032 X 24 768.00
Kg 800 : 1000 0.800.80 Kg
2.6 : 0.1 26.0026 X 36 936.00
Kg 962 : 1000 0.96
0.96 Kg
540 x 28 ###288 x 28 8064.00
23184 : 1000 23.18 KgKg
540 x 2 1080.00112 x 2 224.001304 : 1000 1.30 Kg
Kg
540 x 2 1080.00320 x 2 640.001720 : 1000 1.72 Kg
Kg
540 x 2 1080.00272 x 2 544.001624 : 1000 1.62 Kg
Kg
432 x 28 ###240 x 28 6720.00
18816 : 1000 18.82 KgKg
336 x 2 672.00240 x 2 480.001152 : 1000 1.15 Kg
Kg
480 x 2 960.00240 x 2 480.001440 : 1000 1.44 Kg
Kg
408 x 2 816.00240 x 2 480.001296 : 1000 1.30 Kg
Kg
446.4 x 14 6249.60288 x 14 4032.00
10282 : 1000 10.28 KgKg
64 x 59 3776.00Kg 3776 : 1000 3.78 Kg
32 x 72 2304.00Kg 2304 : 1000 2.30 Kg
6.9 : 0.1 69.0069 X 84 5796.00
Kg 5865 : 1000 5.875.87 Kg
3.7 : 0.1 37.0037 X 12 444.00
Kg 481 : 1000 0.480.48 Kg
5.7 : 0.1 57.0057 X 12 684.00
Kg 741 : 1000 0.740.74 Kg
8.7 : 0.1 87.0087 X 12 1044.00
Kg 1131 : 1000 1.131.13 Kg
3.1 : 0.1 31.0031 X 18 558.00
Kg 589 : 1000 0.590.59 Kg
2.5 : 0.1 25.00
25 X 18 450.00Kg 475 : 1000 0.48
0.48 Kg
2.35 : 0.1 23.5023.5 X 120 2820.00
Kg 2843.5 : 1000 2.842.84 Kg
8.85 : 0.1 88.5088.5 X 6 531.00
Kg 619.5 : 1000 0.620.62 Kg
5.85 : 0.1 58.5058.5 X 6 351.00
Kg 409.5 : 1000 0.410.41 Kg
6.9 : 0.1 69.0069 X 6 414.00
Kg 2.5 : 0.1 25.0025 X 5 125.00
7546 : 1000 7.55 Kg
3.1 : 0.1 31.0031 X 6 186.00
Kg 2.5 : 0.1 25.0025 X 5 125.00622 : 1000 0.62 Kg
3.7 : 0.1 37.0037 X 6 222.00
Kg 2.5 : 0.1 25.0025 X 5 125.00694 : 1000 0.69 Kg
3.1 : 0.1 31.0031 X 6 186.00
Kg 2.5 : 0.1 25.0025 X 5 125.00622 : 1000 0.62 Kg
19.4 : 0.1 194.00194 X 6 1164.00
Kg 2.5 : 0.1 25.0025 X 5 125.00
1289 : 1000 1.29 Kg
19.4 : 0.1 194.00194 X 6 1164.00
Kg 2.5 : 0.1 25.0025 X 5 125.00
1289 : 1000 1.29 Kg
PERHITUNGAN STRUKTURPEKERJAAN GALIAN TANAH & URUGAN TANAH Pek. Galian Tanah Pondasi Type PL 1PANJANG X LEBAR X TINGGI X UNIT = VOL
151.2 2.7225 1.7 1 699.7975 2.7225 1.7 1 347.12
64.8 2.7225 1.7 1 299.9114.4 2.7225 1.7 1 66.65
1413.47
Pek.Begisting BatakoPANJANG
XLEBAR
XTINGGI =
305.4 1 0.50 152.70152.70 M² 15.27
PEK. Urugan Tanah Kembali305.4 3.43 845.96 M³
PEK. Urugan dengan Sirtu 50 cm305.4 2.468 0.5 376.86 M³
Pek. Lantai Kerja 5 cm305.4 2.485 0.05 37.95 M³
Pek. Pembesian Besi D 13 - 15 1.04 kg
305.4 : 0.15 2036 2.0 4243.70305.4 11.00 3359 3501.05
7744.76
Besi Ø 10 - 20 0.62 kg305.4 : 0.20 1527 1.6 1459.56305.4 11.00 3359 2071.63
3531.19
Pek. Galian Tanah Pondasi Type PL 2 + PL 2APANJANG X LEBAR X TINGGI X UNIT =
57.8 2.228 1.7 1 218.9235.55 2.228 1.7 1 134.65
12 2.228 1.7 1 45.4510.2 2.228 1.7 1 38.6322.2 2.228 1.7 1 84.08
521.74
Pek.Begisting BatakoPANJANG
XLEBAR
XTINGGI =
137.75 1 0.50 68.8868.88 M²
PEK. Urugan Tanah Kembali137.75 2.82 377.11 M³
PEK. Urugan dengan Sirtu 50 cm137.75 1.8015 0.5 124.08 M³
Pek. Lantai Kerja 5 cm137.75 1.9845 0.05 13.67 M³
Pek. Pembesian Besi D 13 - 15 1.04 kg
137.75 : 0.15 919 2.0 1915.50137.75 11.00 1515 1579.14
3494.65
Besi Ø 10 - 20 0.62 kg137.75 : 0.20 670 1.6 661.07137.75 9.00 1240 764.51
1425.58
Pek. Galian Tanah Pondasi Batu KaliPANJANG X LEBAR X TINGGI X UNIT =
157.8 1.245 1.03 1 202.35202.35
PEK. Urugan Tanah Kembali157.8 1 157.80 M³
PEK. Urugan Pasir 10 cmPANJANG X LEBAR X TINGGI = VOL
157.8 0.9 0.1 14.20 M³
PEKERJAAN PONDASIPek. Pondasi Lajur Tipe PL 1 PANJANG X LEBAR X TINGGI X UNIT =
305.4 1.5 0.3 1 137.43137.43
Pek. Pondasi Lajur Tipe PL 2 + 2APANJANG X LEBAR X TINGGI X UNIT =137.75 1 0.3 1 41.33
41.33
Pek. Pondasi Batu KaliPANJANG X LEBAR X TINGGI X UNIT =
157.8 0.5 0.7 1 55.2355.23
STEK D - 16 1.579157.8 0.5 317 0.5 704.44
1112.08
Pek. Beton Kosong T 20cmPANJANG X LEBAR X TINGGI X UNIT =
157.8 1.035 0.2 1 32.6632.66
297.38134.0032
331.3842
PEKERJAAN BETON
SLOOF ( 30 X 50 )BETON
PANJANG X LEBAR X TINGGI X UNIT = VOL151.2 0.3 0.5 1 22.68
75 0.3 0.5 1 11.2564.8 0.3 0.5 1 9.7214.4 0.3 0.5 1 2.16
87.75 0.3 0.5 1 13.1658.97
PASIR URUG T 10cmPANJANG X LEBAR X TINGGI X UNIT = VOL
151.2 0.3 0.1 1 4.5475 0.3 0.1 1 2.25
64.8 0.3 0.1 1 1.9414.4 0.3 0.1 1 0.43
87.75 0.3 0.1 1 2.6311.79
Lantai Kerja 5cmPANJANG X LEBAR X TINGGI X UNIT = VOL
151.2 0.3 0.05 1 2.2775 0.3 0.05 1 1.13
64.8 0.3 0.05 1 0.9714.4 0.3 0.05 1 0.22
87.75 0.3 0.05 1 1.325.90
BEGISTING BATAKOPANJANG X LEBAR X TINGGI X UNIT = VOL
151.2 0.4 1 1 60.4875 0.4 1 1 30.00
64.8 0.4 1 1 25.9214.4 0.4 1 1 5.76
87.75 0.4 1 1 35.10157.26
PEMBESIAN D 16 mm 18.94 KgPANJANG X JUMLAH =393.15 12 4717.8 M 393.150 Btg 7447.83
PEMBESIAN Ø 10 mm - 150 mm 7.40 KgPANJANG : JARAK =393.15 0.15 2621.00 x 1.65 360.39
2666.87
SLOOF ( 20 X 40 )BETON
PANJANG X LEBAR X TINGGI X UNIT = VOL4 0.2 0.4 3 0.96
3.4 0.2 0.4 3 0.822.775 0.2 0.4 10 2.22
4.00
PASIR URUG T 10cmPANJANG X LEBAR X TINGGI X UNIT = VOL
4 0.3 0.1 3 0.363.4 0.3 0.1 3 0.31
2.775 0.3 0.1 10 0.831.50
Lantai Kerja 5cmPANJANG X LEBAR X TINGGI X UNIT = VOL
4 0.3 0.05 3 0.183.4 0.3 0.05 3 0.15
2.775 0.3 0.05 10 0.420.75
BEGISTING BATAKOPANJANG X TINGGI X UNIT = VOL
4 0.2 3 2.40 M²3.4 0.2 3 2.04 M²
2.775 0.2 10 5.55 M²9.99 M²
PEMBESIAN D 16 mm 18.94 KgPANJANG X JUMLAH =
49.95 8 399.6 M 34.448 Btg 652.59
PEMBESIAN Ø 10 mm - 150 mm 7.40 KgPANJANG : JARAK =
49.95 0.15 333.00 x 1.25 35.88265.54
SLOOF ( 15 X 25 )BETON
PANJANG X LEBAR X TINGGI X UNIT = VOL157.8 0.15 ` 0.25 1 5.92
5.92
PASIR URUG T 10cmPANJANG X LEBAR X TINGGI X UNIT = VOL
157.8 0.15 0.1 1 2.372.37
Lantai Kerja 5cm
PANJANG X LEBAR X TINGGI X UNIT = VOL157.8 0.15 0.05 1 1.18
1.18
BEGISTING MULTIPLEK 12 MMPANJANG X TINGGI X UNIT = VOL
157.8 0.5 1 78.90 M³78.90 M³
PEMBESIAN Ø 10 mm 7.40 KgPANJANG X JUMLAH =
157.8 4 631.2 M 54.414 Btg 402.66
PEMBESIAN Ø 8 mm - 200 mm 4.74 Kg 830.49PANJANG : JARAK =
157.8 0.2 789.00 x 0.85 57.81427.83
KOLOM PEDESTAL ( 40 X 40 ) K1BETON
23 1.15 26.45PANJANG X LEBAR X TINGGI =26.45 0.4 0.4 4.23 M³
BEGISTING23 1.15 26.45
PANJANG X LEBAR =26.45 1.6 42.32 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
26.45 12 317.4 M 27.36 Btg980.00 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
26.45 0.1 264.5 M 1.65 = 37.623278.41
KOLOM PEDESTAL ( 40 X 40 ) K2BETON
7 1.15 8.05PANJANG X LEBAR X TINGGI =
8.05 0.4 0.4 1.29 M³
BEGISTING7 1.15 8.05
PANJANG X LEBAR =8.05 1.6 12.88 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
8.05 12 96.6 M 8.33 Btg298.26 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
8.05 0.1 80.5 M 1.65 = 11.45084.73
KOLOM PEDESTAL ( 30 X 30 ) K3BETON
13 1.15 14.95PANJANG X LEBAR X TINGGI =14.95 0.3 0.3 1.35 M³
BEGISTING13 1.2 15.6
PANJANG X LEBAR =15.6 1.6 24.96 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
16.3 4 65.2 M 5.62 Btg201.31 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
16.3 0.1 163 M 1.25 = 17.565129.98
KOLOM ( 40 X 40 ) K1BETON
23 4.2 96.6PANJANG X LEBAR X TINGGI =
96.6 0.4 0.4 15.46 M³
BEGISTING23 4.2 96.6
PANJANG X LEBAR =96.6 1.6 154.56 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
97.5 12 1170 M 100.86 Btg3612.48 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
97.5 0.1 975 M 1.65 = 138.6851026.27
KOLOM ( 40 X 40 ) K2BETON
7 4.2 29.4PANJANG X LEBAR X TINGGI =
29.4 0.4 0.4 4.70 M³
BEGISTING7 4.2 29.4
PANJANG X LEBAR =29.4 1.6 47.04 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
4.7 12 56.4 M 4.86 Btg174.14 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
4.7 0.1 47 M 1.65 = 6.68549.47
KOLOM ( 30 X 30 ) K3BETON
13 4.2 54.6PANJANG X LEBAR X TINGGI =
54.6 0.3 0.3 4.91 M³
BEGISTING13 4.2 54.6
PANJANG X LEBAR =54.6 1.2 65.52 M²
PEMBESIAN D 22 mm 35.82 KgPANJANG X JUMLAH =
57.85 4 231.4 M 19.95 Btg714.47 Kg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
57.85 0.1 578.5 M 1.25 = 62.338461.30
PEKERJAAN PLAT LANTAIBETONPANJANG X LEBAR X TINGGI =
57.8 18.375 0.07 74.35 M³74.35 M³
PEMBESIAN Ø 8 mm 4.74PANJANG : JARAK =
57.8 0.2 290 BH X 18 =18.375 0.2 92.875 BH X 58 =
PEMBESIAN Ø 10 mm 7.40PANJANG : JARAK =
15 0.3 200.00 BH X 0.6 =
PASIR URUGPANJANG X LEBAR X TINGGI =
60.87 18.5 0.1 112.61 M³112.61 M³
LANTAI KERJAPANJANG X LEBAR X TINGGI =
60.87 18.5 0.05 56.30 M³56.30 M³
PEKERJAAN PLAT LANTAI DROF OFFBETONPANJANG X LEBAR X TINGGI =
6.6 22.4 0.15 22.18 M³22.18 M³
BEGISTINGPANJANG X TINGGI
58 X 0.15 = 8.7 M² 16.792
PEMBESIAN Ø 13 mm 12.51 1PANJANG : JARAK =
6.6 0.15 45 BH X 22 =22.4 0.15 151 BH X 6.6 =
PASIR URUGPANJANG X LEBAR X TINGGI =
6.6 22.4 0.1 14.78 M³14.78 M³
LANTAI KERJAPANJANG X LEBAR X TINGGI =
6.6 22.4 0.05 7.39 M³7.39 M³
RABAT BETON ADK 1 : 2 : 3PANJANG X LEBAR X TINGGI =
35.4 1.075 0.07 2.66 M³2.66 M³
TANGGAPEK. PONDASI TANGGABETON
PANJANG X LEBAR X TINGGI =1.7 0.12 1.15 0.23 M³
BEGISTINGLEBAR X TINGGI X JUMLAH =3.64 1.15 1 4.19
PEMBESIAN D - 13 1.041.7 : 0.2 = 19 X 2.25 = 42.75
44.55
PEMBESIAN Ø 10 0.62 Kg1.15 : 0.2 = 14 X 3.60 = 50.4
31.080
PEK.PELAT TANGGABETONPANJANG X LEBAR =
0.175 X 0.3 x 0.02625 X 22.00 = 0.5788.74 X 1.7 x 0.12 x 1.00 = 1.783
2.36BEGISTINGPANJANG X LEBAR X JUMLAH =
8.74 2.35 1 20.540.175 1.7 23 6.84
27.38
PEMBESIAN D - 13 1.041.8 : 0.15 = 26 X 8.74 = 227.24
236.82
PEMBESIAN D - 13 1.041.7 : 0.15 = 25 X 3.75 = 93.75
97.70
PEK.PELAT BORDESBETONPANJANG X LEBAR X TINGGI
3.4 X 1.45 X 0.12 = 0.592 M³
BEGISTINGPANJANG X LEBAR X JUMLAH =
3.64 1.45 1 5.28
PEMBESIAN D - 13 1.043.4 : 0.15 = 25 X 1.96 = 49
51.066
PEMBESIAN D - 13 1.043.4 : 0.15 = 25 X 3.75 = 93.75
97.703
PEK. BALOK BORDESBETON
M²
M²M²M²
M²
PANJANG X LEBAR X TINGGI3.4 X 0.35 X 0.5 = 0.60 M³
BEGISTINGPANJANG X LEBAR X JUMLAH =
3.4 1.35 1 4.59
PEMBESIAN Ø 10 0.623.4 : 0.15 = 23 X 1.75 = 40.25
24.821
PEMBESIAN D - 13 1.043.4 X 6 = 20.4
21.260 Kg
PEK.KOLOM BORDESBETONPANJANG X LEBAR X TINGGI
2.1 X 0.25 X 0.25 = 0.26 M³
BEGISTINGPANJANG X LEBAR X JUMLAH =
2.1 1 2 4.20
PEMBESIAN Ø 8 0.394.2 : 0.15 = 28 X 1.05 = 29.4
11.603
PEMBESIAN D - 13 1.044.2 X 4 = 16.8
17.508 Kg
PEKERJAAN BETON LANTAI IIKOLOM ( 40 X 40 ) K1
BETON23 3.95 90.85
PANJANG X LEBAR X TINGGI =90.85 0.4 0.4 14.54 M³
BEGISTING23 3.95 90.85
PANJANG X LEBAR =90.85 1.6 145.36 M²
PEMBESIAN D 22 mm 2.95 KgPANJANG X JUMLAH =
91.75 12 = 1101 M 3250.59 Kg280.22 Btg
PEMBESIAN Ø 10 mm - 100mm 7.40 KgPANJANG : JARAK =
91.75 0.1 917.5 M 1.65 = 130.506
M²
M²
965.75
KOLOM ( 15 X 15 ) KP 1BETON
32 1.15 36.8PANJANG X LEBAR X TINGGI =
36.8 0.15 0.15 0.83 M³
BEGISTING32 1.15 36.8
PANJANG X LEBAR =36.8 0.6 22.08 M²
PEMBESIAN D 13 mm 1.05 KgPANJANG X JUMLAH =
50.1 4 201.4 M 16.78 Btg211.04 Kg
PEMBESIAN Ø 10 mm - 100mm 0.62 KgPANJANG : JARAK =
36.8 0.1 368 M 0.46 = 169.280104.96
12.5 32 400 M 0.46 = 184.000114.08
PEKERJAAN BALOK B 1 BALOK 25 X 50BETONPANJANG X LEBAR X TINGGI X UNIT =
6.6 0.25 0.5 5 4.137.2 0.25 0.5 18 16.206 0.25 0.5 16 12.00
32.33
BEGISTINGPANJANG X LEBAR =
258.6 1.25 323.25 M²
PEMBESIAN D 16 mm 1.587 kgPANJANG X JUMLAH =
129.3 8 1034.5 M 88.42 Btg129.3 5 646.6 M 55.26 Btg
517.2 320.661681.10 2989.01 Kg 3250.4
PEMBESIAN Ø 10 mm 0.620 kgPANJANG : JARAK =
258.6 0.1 = 2586 M 1.60 4137.62565.31
B 2 BALOK 20 X 40BETON
PANJANG X LEBAR X TINGGI X UNIT =2.575 0.2 0.4 17 3.50
4 0.2 0.4 6 1.923.4 0.2 0.4 6 1.63
7.054
BEGISTINGPANJANG X LEBAR =88.175 1 88.175 M²
PEMBESIAN D 13 mm 12.506 kgPANJANG X JUMLAH =88.175 6 529.05 M 45.22 Btg
565.50 KgPEMBESIAN Ø 10 mm 7.4 kgPANJANG : JARAK =88.175 0.17 518.6765 X 1.3 = 58.13
430.14
B 3 BALOK 30 X 60BETONPANJANG X LEBAR X TINGGI X UNIT =
7.2 0.3 0.6 28 36.2936.29
BEGISTINGPANJANG X LEBAR =
201.6 1 201.6 M²
PEMBESIAN D 22 mm 35.816 kgPANJANG X JUMLAH =
201.6 6 1209.6 M 103.38 Btg3702.82 Kg
PEMBESIAN Ø 10 mm 7.4 kgPANJANG : JARAK =
201.6 0.1 2016 X 1.3 = 225.931671.89
B 4 BALOK 40 X 80BETONPANJANG X LEBAR X TINGGI X UNIT =
9 0.4 0.8 10 28.80
BEGISTINGPANJANG X LEBAR =
90 2 180 M²
PEMBESIAN D 22 mm 35.816 kgPANJANG X JUMLAH =
90 7 630 M 53.85 Btg1928.55 Kg
PEMBESIAN Ø 10 mm 7.4 kg
PANJANG : JARAK =90 0.17 529.4118 X 2.5 = 114.10
844.32
B 5 BALOK 30 X 50BETONPANJANG X LEBAR X TINGGI X UNIT =
6 0.3 0.5 1 0.90
BEGISTINGPANJANG X LEBAR =
6 1.3 7.8 M²
PEMBESIAN D 22 mm 35.816 kgPANJANG X JUMLAH =
6 5 30 M 2.56 Btg91.84 Kg
PEMBESIAN Ø 10 mm 7.4 kgPANJANG : JARAK =
6 0.15 40 X 1.7 = 5.8643.38
B 6 BALOK 15 X 20BETONPANJANG X LEBAR X TINGGI X UNIT =
100 0.15 0.2 1 3.003.00
BEGISTINGPANJANG X LEBAR =
100 0.55 55 M²
PEMBESIAN D 13 mm 12.506 kgPANJANG X JUMLAH =
100 4 400 M 34.19 Btg427.56 Kg
PEMBESIAN Ø 10 mm 7.4 kgPANJANG : JARAK =
100 0.125 800 X 0.8 = 55.17408.28
BK 1 BALOK 25 X 50BETON
PANJANG X LEBAR X TINGGI X UNIT =2.8 0.25 0.5 6 2.103.6 0.25 0.5 4 1.80
3.90BEGISTINGPANJANG X LEBAR =
31.2 1.25 39 M²
PEMBESIAN D 16 mm 18.944 kg
PANJANG X JUMLAH =31.2 12 374.4 M 32.00 Btg
606.21 KgPEMBESIAN Ø 10 mm 7.4 kgPANJANG : JARAK =
31.2 0.125 249.6 X 1.7 = 36.58270.69
PEKERJAAN PLAT LANTAIBETONPANJANG X LEBAR X TINGGI =
58.37 15 0.12 105.07 M³21.6 7.3 0.1 15.77 M³
36.74 1.3 0.1 4.78 M³10.82 2.575 0.1 2.79 M³10.82 1.15 0.1 1.24 M³36.74 3.725 0.1 13.69 M³
143.33 M³4.5 3.55 0.12 1.92 M³
141.41 M³ 13946.3508
PEMBESIAN Ø 10 mm 0.62PANJANG : JARAK =
53.87 0.125 431.96 BH X 32 =11.45 0.125 92.6 BH X 118 =
PANJANG : JARAK =10.82 0.125 87.56 BH X 4 =2.575 0.125 21.6 BH X 12 =
LUAS X JUMLAH X PANJANG382.603 28 1 = 6606.28 Kg
TOTAL
PEKERJAAN SIRIPPEK. BETON K - 175Frame Beton Beton
0.42 X 0.7 X 31 = 9.11 m³Begisting
0.42 X 31 = 13.02 m³Pembesian
PERHITUNGAN STRUKTUR
VOL
M³
kgkgkg
kgkgkg
M³
kgkgkg
kgkgkg
M³
PEKERJAAN PONDASI
M³
M³
M³
Kg
M³
PEKERJAAN BETON
VOLM³M³M³M³M³M³
VOLM³M³M³M³M³M³
VOLM³M³M³M³M³M³
VOLM³M³M³M³M³M³
Kg
Btg
kg
VOLM³M³M³M³
VOLM³M³M³M³
VOLM³M³M³M³
Kg
Btgkg
VOLM³M³
VOLM³M³
VOLM³M³
Kg
Btgkg
BtgKg
BtgKg
BtgKg
BtgKg
BtgKg
BtgKg
5328.75 M5368.18 M
10696.93891.41 Btg
4221.72 Kg
120.00 M10.26 Btg75.90 Kg
2016.00 M1993.20 M4009.20334.10 Btg
4178.25 Kg
Kg
Kg
M³
mtrKg
#REF!
Kg
Kg
Kg
Kg
Btg
Kg
262.40272.90
BtgKgBtg
Kg
PEKERJAAN BALOK
M³ 33M³ 129.6M³ 96M³ 258.6
36
3.628.8
102.8547314.285379
3694.199Kg 2061.05
M³M³M³M³
5.8823529
5Btg 10Kg
4.5 27 2.254.5 9 0.75
3M³M³ 4.5 22.5 1.875
4.5 13.5 1.1253
BtgKg
4.5 22.5 1.8754.5 9 0.75
2.625M³
4.5 31.5 2.6254.5 13.5 1.125
3.75
BtgKg
M³
3 0.125 243 0.2 15
396 0.15 40
BtgKg
M³#REF!
BtgKg
M³M³M³
BtgKg
157.6847.762
27.861512.443
136.8565382.603
16.97 20.22512.6
13822.72 M 810926.80 M24749.5215262.20 Kg 808.05
350.24 M 8259.20 M 25857.6609.44 15945.52375.82 Kg
22244.30 Kg
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
No. Tipe konstruksiPnjng Ekivalen=1m3 Kbthn. Tul Brt Tul
lbr tg panj (mm) (Kg/m')
TULANGAN POKOK
SLOOF1 Balok sloof 30 x 50 0.30 0.50 6.67 12 Ø 16.0 1.578
2 Balok sloof 20x 40 0.20 0.40 12.50 8 Ø 16.0 1.578
3 Balok sloof 15 x 20 0.15 0.20 33.33 4 Ø 10.0 0.616
BALOK LANTAI1 Balok Lantai 25 x 50 0.25 0.50 8.00 13 Ø 16.0 1.578
2 Balok Lantai 20 x 40 0.20 0.40 12.50 6 Ø 13.0 1.042
3 Balok Lantai 30 x 60 0.30 0.60 5.56 6 Ø 22.0 2.983
4 Balok Lantai 40 x 80 0.40 0.80 3.13 7 Ø 22.0 2.983
5 Balok Lantai 30 x 50 0.30 0.50 6.67 5 Ø 22.0 2.983
6 Balok Lantai 15 x 20 0.15 0.20 33.33 4 Ø 13.0 1.042
7 Balok Lantai 25 x 50 0.25 0.50 8.00 12 Ø 16.0 1.578
RING BALOK1 Ring Balok 35 x 50 0.35 0.50 5.71 10 Ø 16.0 1.578
2 Ring Balok 20 x 40 0.20 0.40 12.50 8 Ø 16.0 1.578
3 Ring Balok 30 x 60 0.30 0.60 5.56 8 Ø 16.0 1.578
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
No. Tipe konstruksiPnjng Ekivalen=1m3
Kbthn. Tul (mm)
lbr tg panjBeugel/sengkang dan tul. bagi
SLOOF1 Balok sloof 30 x 50 0.30 0.50 1.65 45 Ø 10.0 0.6162 Balok sloof 20 x 40 0.20 0.40 1.25 84 Ø 10.0 0.6162 Balok sloof 15 x 20 0.15 0.20 0.75 223 Ø 8.0 0.394
BALOK LANTAI1 Balok Lantai 25 x 50 0.25 0.50 1.55 54 Ø 10.0 0.6162 Balok Lantai 20 x 40 0.20 0.40 1.25 84 Ø 10.0 0.6163 Balok Lantai 30 x 60 0.30 0.60 1.85 38 Ø 10.0 0.6164 Balok Lantai 40 x 80 0.40 0.80 2.45 21 Ø 10.0 0.6165 Balok Lantai 30 x 50 0.30 0.50 1.65 45 Ø 10.0 0.6166 Balok Lantai 15 x 20 0.15 0.20 0.75 223 Ø 10.0 0.6167 Balok Lantai 25 x 50 0.25 0.50 1.55 54 Ø 10.0 0.616
PLAT LANTAI 1 Plat Lantai 1 0.20 0.20 25.00 10 Ø 8.0 0.3942 Plat Lantai Droof of 0.15 0.15 44.44 28 Ø 13.0 1.042
Brt Tul (Kg/m')
3 Plat Lantai 2 0.125 0.125 64.00 32 Ø 8.0 0.3944 Plat Lantai Dak Atap 0.15 0.15 44.44 28 Ø 8.0 0.394
RING BALOK1 Ring Balok 35 x 50 0.35 0.50 1.75 39 Ø 8.0 0.3952 Ring Balok 20 x 40 0.20 0.40 1.25 84 Ø 8.0 0.3953 Ring Balok 30 x 60 0.30 0.60 1.85 38 Ø 8.0 0.395
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
Berat per Kbthn Pnjng Luasan Jumlah Begel
1m' (kg) per m3 (kg) Per M3 bkstng (m2)
TULANGAN POKOK
SLOOF18.936 126.24 6.67 6.6667 44.44 45.00
12.624 157.80 8.33 10.0000 83.33 84.00
2.466 82.19 11.11 13.3333 222.22 223.00
BALOK LANTAI20.514 164.11 8.67 8.0000 53.33 54.00
6.250 78.13 6.25 10.0000 83.33 84.00
17.900 99.45 2.78 6.6667 37.04 38.00
20.884 65.26 1.82 5.0000 20.83 21.00
14.917 99.45 2.78 6.6667 44.44 45.00
4.167 138.90 11.11 13.3333 222.22 223.00
18.936 151.49 8.00 8.0000 53.33 54.00
RING BALOK15.783 90.19 4.76 5.7143 38.10 39.00
12.627 157.83 8.33 10.0000 83.33 84.00
12.627 70.15 3.70 6.6667 37.04 38.00
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
Beugel/sengkang dan tul. bagi
SLOOF27.738 45.77 17.18 0.5400 Kg51.778 64.72 24.30 1.0080 Kg87.973 65.98 24.77 2.6760 Kg
BALOK LANTAI33.286 51.59 19.37 0.6480 Kg51.778 64.72 24.30 1.0080 Kg23.423 43.33 16.27 0.4560 Kg12.944 31.71 11.90 0.2520 Kg27.738 45.77 17.18 0.5400 Kg
137.457 103.09 38.70 2.6760 Kg33.286 51.59 19.37 0.6480 Kg
PLAT LANTAI 3.945 98.62 37.02 0.1200 Kg
29.168 1,296.36 486.62 0.3360 Kg
Berat per 1m' (kg)
Kbthn per m3 (kg)
Pnjng Per M3
Kebutuhan Kawat Beton
12.624 807.93 303.28 0.3840 Kg11.046 490.93 184.28 0.3360 Kg
RING BALOK15.405 26.96 10.12 0.4680 Kg33.180 41.48 15.57 1.0080 Kg15.010 27.77 10.42 0.4560 Kg
BESTAT BESI : BANGUNAN PANTRI KLINIK LIDWINA SEKOJO
NO
BENTUK BESIPJG
JUMLAH TOTAL SISA POTONGAN
TOTAL
DIA BESI POTONGAN BESI UTUH SISA POTONGAN KETERANGAN
( cm ) ( M' ) BH (BTG ) Jumlah
A BALOK ATAP
BESI BALOK SUMBU Y
1 AS C BENTANG 1 - 5 (BALOK 25X50)
1.1 Atas D 16 mm 12.00 3 3 0.00 0
1095
44.5 44.5
1.2 Bawah
D 16 mm 11.11 3 3 0.89 31095
1.3 Atas kiri As 1
110D 16 mm 1.71 2 1 8.59 1
44.5
1.4 Bawah antara As 1 - As 2
246D 16 mm 2.62 2 0 3.35 1
1.5 Atas As 2
2
102.50 165.75D 16 mm 2.84 2 1
0.51 1
9.16 1
268.25
1.6 Bawah antara As 2 - As 5
398D 16 mm 4.14 2 0 0.88
1.7 Atas kanan As 5
166
44.5 D 16 mm 2.26 2 1 7.48 1
1.8 Tulangan pinggang
1095 Ø 10 mm 11.05 2 2 0.95 2
1.9 Sengkang
20
45 45 Ø 8 mm 1.39 73 1012-(1.39X8)=0.88 9
12-1.39=10.61 1
20
/ Btg ( M¹ )
1 besi diambil dari sisa 8.59 m NO. 1.3
1 besi diambil dari sisa 3.35 m NO. 1.4
1 besi diambil dari sisa 9.16 m NO. 1.5
8
8 8
8
8
8
8
88
8
5 5
5
8
8
8
8
88
NO
BENTUK BESIPJG
JUMLAH TOTAL SISA POTONGAN
TOTAL
DIA BESI POTONGAN BESI UTUH SISA POTONGAN KETERANGAN
( cm ) ( M' ) BH (BTG ) Jumlah/ Btg ( M¹ )
2 AS D BENTANG 1 - 5 (BALOK 20X40)
2.1 Atas
1095
35 35 D 16 mm 11.81 3 3 0.19 3
2.2 Bawah
D 16 mm 11.11 3 3 0.89 31095
2.3 Tulangan pinggang
1095 Ø 10 mm 11.05 2 2 0.95 2
2.4 Sengkang
20
35 35 Ø 8 mm 1.20 73 710.61-(1.20X3)=7.01 1
0.00 0
20
3 AS A BENTANG 1 - 5 (BALOK 35X55)
3.1 Atas D 16 mm 12.00 8 8 0.00 0
1095
44.5 44.5
3.2 Tengah
D 16 mm 11.11 6 6 0.89 61095
3.3 Bawah
D 16 mm 11.11 6 6 0.89 61095
3.4 Sengkang
60
49D 10 mm 2.73 63 8
12-(2.73x4)=1.08 15
49 12-(2.73x3)=3.81 175
30
30
49 49D 10 mm 1.68 63 9 12-(1.68x7)=0.24 9
30
1 besi diambil dari sisa 10.61 m NO. 1.9
sengkang dipasang salang seling, sengkang pertama berbentuk
trapesium, urutan ke-2 berbentuk pesegi, urutan ke-3 kembali sengkang trapesium, begitu
seterusnya (jarak antar sengkang yang sejenis sebesar 15 cm (lihat
gambar kerja)
5
5
8
8
8
88
8
8
8
8
8
8
8
5 5
5
88
NO
BENTUK BESIPJG
JUMLAH TOTAL SISA POTONGAN
TOTAL
DIA BESI POTONGAN BESI UTUH SISA POTONGAN KETERANGAN
( cm ) ( M' ) BH (BTG ) Jumlah/ Btg ( M¹ )
4 AS F BENTANG 1 - 5 (BALOK 35X55)
4.1 Atas D 16 mm 12.00 8 8 0.00 0
1095
44.5 44.5
4.2 Tengah
D 16 mm 11.11 6 6 0.89 61095
4.3 Bawah
D 16 mm 11.11 6 6 0.89 61095
4.4 Sengkang
60
49D 10 mm 2.73 63 8
12-(2.73x4)=1.08 15
49 12-(2.73x3)=3.81 1
75
30
30
49 49D 10 mm 1.68 63 9 12-(1.68x7)=0.24 9
30
TOTAL KEBUTUHAN BESI BALOK ATAP SUMBU Y
D16 55 BTGD10 34 BTGØ 10 4 BTGØ 8 17 BTG
Catatan :Pabrikasi dan perakitan besi di lapangan harap benar-benar diperhatikan dan dilaksanakan berdasarkan tabel bestat dan gambar kerja
sengkang dipasang salang seling, sengkang pertama berbentuk
trapesium, urutan ke-2 berbentuk pesegi, urutan ke-3 kembali sengkang trapesium, begitu
seterusnya (jarak antar sengkang yang sejenis sebesar 15 cm (lihat
gambar kerja)
5
5
8
8
8
8
8
8
88