RAB RENOVASI GRIYA PATRA BLOK . G . 8

NO URAIAN PEKERJAANVOLSATHARGA SATUANJUMLAH

MATERIALJASAMATERIALJASA

PONDASI3.24

1Galian Pondasi1.81--243,000

2Pondasi Batu Merah 250,00075,000452,500271,000

TOTAL I50,000452,500514,000

PEK BETON BERTULANG

1Tapak 8 : 8 ( 60,60,20 )0.431,100,000500,000473,000215,000

2Slof 8 : 5 (15/20 )0.81900,000500,000729,000405,000

3Kolom 8 : 6 (10/10)0.36900,000500,000324,000180,000

4Ring Balok 8 : 6 (12/15)0.47900,000500,000423,000235,000

5Dak Level Depan ( 1:2:3 ) 8 : 61.001,900,000500,0001,900,000500,000

6Dak Level Belakang (1:7:3 ) 8 : 60.501,900,000500,000950,000250,000

7Topi Beton ( 1 : 2 : 3 ) 8 : 60.07900,000500,00063,00035,000

TOTAL II1,820,000

IIIPEK. DINDING

1Psng dinding bata merah ad. 1:447.0095,00030.0004.465.0001.410.000

2Pelester dinding ad 1 : 4222.0045,00025.0009.990.0005.550.000

3Cat dinding451.009,0006.0004.059.0002.706.000

TOTAL III9.666.000

PEK . KUSEN, PINTU, JENDELA

1Kusen pintu pagar2.00LB-140,000-280,000

2Setel pintu komplit6.00Unit-100,000-600,000

3Setel jendela kaca komplit10.00Unit-75,000-750,000

4pPsang/ setelpintu PVC . Mandi1.00Unit-50,000-50,000

TOTAL IV1.680.000

VPEK. LANTAI

1Floor lantai ad 1 : 2: 337.0075,00025,0002.2775,000925,000

2Pasng Lantai keramik: 40X4092.0050,00035,0004,600,0003,220,000

3Pasang lantai K.Mandi 20X203.0045,00030,000135,00090,000

4Pasang keramik dinding2.7550,00035,000137,00096,250

TOTAL V7,647,0004,331,250

VIPEK. PELUMBING/ SANITASI

1Instalasi air bersih1.00Is-50,000-50,000

2Instalasi air kotor1.00Is-100,000-100,000

3Septi Tank1.00Set85,000400,000800,000400,000

TOTAL VI800,000550,000

VIIPEK.LAINNYA

1Meja Dapur

aPasang bata merah 2.1095,00030,000199,50063,000

BCor beton ( 1 : 2 : 3 ) 8 : 61.67900,000500,00015,030,000835,000

cPasang Dioc Washer1.00set175,00025,000175,00025,000

DPasang Keramik 20X253.9350,00035,000196,500137,550

2Kloset duduk American std.1.001,000,00075,0001,000,00075,000

3Cor port( 1: 2 : 3 )21.0065,00025,0001,365,000525,000

4Pagar Depan

APasang batu merah3.2595,00030,000308,75097,500

BKolom 8 : 6 (10/10)0.02900,000500,00018,00010,000

cRing Blok 8 : 6 (12/15)0.12900,000500,000108,00060,000

dPlesteran6.50450,00025,000292,500162,500

TOTAL VII5.166.2501,990,550

VIIPEK. PENUTUP GAVANIS

Plapond Hollo Galvanis gypsum120.7275,00035,0009,054,0004,225,000

Atap RBR Limas pasir18.31150,00030,0002,746,500548,300

Instalasi listrik1.00LS--500,000

TOTAL VIII11,800,5005,274,300

GRAND TOTAL I S/D VII

37,127,25020,552,300

GRAND TOTAL I S/D VIII

48,927,75025,826,800

Note :Urungan tanah luas tanah : 10 x 15 x 0,30 = 45 M3 : 5 = 9 TrukUrungan tanah luas bangun : 98,75 x 0,30 = 29,625 M3 = 5 = 5,8 Truk ( 6 )Untuk tanah urug : 9 x 250.000 = Rp. 2.250.000Jasa Angkut + rata = 9 x 200.000 = Rp. 1.800.000