7
Check that the CP is in parallel, CP-B should be executive. Command: DPWSP; Printout: CP STATE Check of Data 1. Make sure that the RPs are defined correct. Command:EXRPP:RP=ALL; Printout: RP DATA 2. Make sure that RP software are defined. There should at least be REXR/RGEXR, RPFDR and application software defined. . Command: EXRUP: RP=ALL; Printout: RP SOFTWARE UNIT DATA 3. Check that the magazine address and RP numbers are defined. Command: DBTSP: TAB=RPSRPBSPOS; Printout: DATA BASE TABLE 2. Test of RPs (RP4 and RPG2/RPG2-E/RPG3) RPs will be connected to the RP-bus, have the correct address set and power will be turned on. Note: Test all RPs on one RP-bus at a time. RPs of type RPG are manually blocked after test for safety reasons. 1. Connect the selected RP-bus to all RPs and power on all RPs. 2. Deblock one RP. Command: BLRPE: RP=rp; Printout: DEBLOCKING OF RP

description

Apz Acceptance

Transcript of Apz Acceptance

<dpwsp;Check that the CP is in parallel, CP-B should be executive.
Command: DPWSP;
Command:EXRPP:RP=ALL;
Printout: RP DATA
2. Make sure that RP software are defined. There should at least be REXR/RGEXR, RPFDR and application software defined. .
Command: EXRUP: RP=ALL;
Printout: RP SOFTWARE UNIT DATA
3. Check that the magazine address and RP numbers are defined.
Command: DBTSP: TAB=RPSRPBSPOS;
Printout: DATA BASE TABLE
Note:  
Test all RPs on one RP-bus at a time.
RPs of type RPG are manually blocked after test for safety reasons.
1. Connect the selected RP-bus to all RPs and power on all RPs.
2. Deblock one RP.
Command: BLRPE: RP=rp;
Printout: DEBLOCKING OF RP
Command: EXRPP: RP=rp;
Printout: RP DATA
******************************************************************************************************************************
6. Halt one CP-side. Watch out for any RPs going ABL, since this might indicate swapped A- and B-path RP-buses.
Repair any faults found.
Command: DPPAI;
8. Switch CP sides, so that CP B-side becomes executive.
C11ommand: DPSWI;
Printout: CP STATE
10.Print the status of all RPs, if any RP is in state ABL, correct all faults and bring the RPs back into service by using commands REMRI and RECRI.
Command: EXRPP: RP=ALL;
Command: DPPAI;
**************************************************************************************************************************************************
Command: DPWSP;
Printout: CP STATE
2. Request for manual intervention. Follow the actions given in the printout (except replace the MAU board).
Command: REMCI:MAG=CPU-B,PCB=MAU;
Printout: CP MANUAL INTERVENTION
Command: DPWSP;
Command: RECCI;
Printout: CP REPAIR
5. Suspend forced EX selection. Switch on power in CP-B. Order updating to parallel working state.
Command: RECCI;
Printout: CP REPAIR
6. Check that the CP is in parallel, CP-A should be executive.
Command: DPWSP;
Command: DPSWI;
Printout: CP STATE
2. Check that the CP is in parallel, CP-B should be executive.
Command: DPWSP;
Printout: CP STATE
3. Request for manual intervention. Follow the actions given in the printout (except replace the MAU-board).
Command: REMCI:MAG=CPU-B, PCB=MAU;
Printout: CP MANUAL INTERVENTION
Command: DPWSP;
Command: RECCI;
Printout: CP REPAIR
6. Suspend forced EX selection. Suspend on power in CP-A. Order updating to parallel working state.
Command: RECCI;
Printout: CP REPAIR
7. Check that the CP is in parallel, CP-A should be executive.
Command: DPWSP;
Switch on power in CP-A. Red LED "FEX" should be lit.
Check that the reloading begins after a few minutes:
For APG40: The ACT LED's on the LBB/RAID board should flash indicating activity.
Wait until loading is done and a restart is made in CP-A.
2. Switch on power in the MAU. Order start-up of the MAU.
Command: RECCI;
Printout: CP REPAIR
3. Switch on power in CP-B. Order updating to parallel working state.
Command: RECCI;
Printout: CP REPAIR
4. Check that the CP is in parallel, CP-A should be executive.
Command: DPWSP;
Command: CACLS: DAY=day, TIME=hhmm, DATE=yymmdd;
6. Order a small restart to set the time in all APT blocks, job buffers and time queues. Printout will appear on terminal defined for PRCA=32.
Command: SYREI: RANK=SMALL, EXPL=expl;
Printout: RESTART DATA
Command: DPWSP;
Switch on power in CP-B. Red LED "FEX" should be lit.
Check that the reloading begins after a few minutes:
For APG40: The ACT LED's on the LBB/RAID board should flash indicating activity.
Wait until loading is done and a restart is made in CP-B.
2. Switch on power in the MAU. Order start-up of the MAU.
Command: RECCI;
Printout: CP REPAIR
3. Switch on power in CP-A. Order updating to parallel working state.
Command: RECCI;
Command: CACLS:DAY=day,TIME=hhmm, DATE=yymmdd;
5. Order a small restart to set the time in all APT blocks, job buffers and time queues. Printout will appear on terminal defined for PRCA=32.
Command: SYREI:RANK=SMALL(,EXPL=expl);
Command: DPWSP;
Command: ALLIP;
Command: SYCLI;
5. Take action to other alarms according to relevant OPIs.
6. Sign this Start Up case in the report:
Start Up Report, AXE 810, 69/1532-B/AXE 106 99 Uen