PRE-COMMISSIONING FORMATS FOR CIRCUIT BREAKER
I. GENERAL DETAILS
DETAILS
Region: Eastern Sub-Station: 400/220kV
Feeder Name:425 52 CB
LOA No. :
Make:Areva T&D india Ltd
Year of Manufacture:2010
Sr. No.: 160418 Type:GL316
Rating:3150A Rated Breaking Capacity(kA): 50
Operating Voltage: 420KV Control Voltage (DC) :220V
Date of Receipt at site: Date of Erection:
Date of energisation:
II. PRE-COMMISSIONING CHECKS:
SL
.NO DESCRIPTION
STATUS
REMARKSYES NO
1 Equipment is free from dirt/dust foreign materials etc.YES
2 Equipment is free from all visible defects on physical inspection YES
3Support structures, marshalling box has been provided with doubleearth
YES
4 All nuts and bolts are tightened correctly as per specified torque YES
5
Equipment erection is complete in all respect & erection completioncertificate along with list of outstanding activities reviewed
(attach remaining activities, if any)
YES
6 Permanent pole leveling and identification is done YES
7 Leveling and alignment of structure and base frame is checkedYES
8 Control box / marshalling kiosk is free from any physical defectsYES
9 Tightness of nuts bolts of terminal connectors are checkedYES
10
Auxiliary contacts and relays have been cleaned and free
from rust / damage
YES
11
All spare wires to be kept with ferrules but not terminated
at the terminal blocks
YES
12
Check all the valves in the sf6 pipe line are tightened,
DILO coupling are tightened.
YES
13Slow and power closing operation and opening done (whereverapplicable)
YES
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 1 of15
-
7/27/2019 28 Circuit Breaker
2/15
DOC NO.: D-2-01-03-01-03
III. OPERATING SYSTEM
Closing Opening
Hydraulic Hydraulic
Pneumatic Pneumatic
Spring yes Spring YesOthers Others
i. Hydraulic system
a) Accumulator
b) Pump details
c) Details of relays/contactors used
Schematic drawing no______________________
CIRCUIT REFERENCE MAKE SERIAL NO. TYPE NO+NC
Oil Pressure Monitor NA NA NA NA
Closing Lockout NA NA NA NA
Auto Reclosing Lockout NA NA NA NA
General Lockout NA NA NA NA
Anti Pumping ContactorNA NA NA NA
Pole Discrepancy Timer NA NA NA NA
Auxiliary NA NA NA NA
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 2 of15
R Y B
Make NA NA NA
Serial number NA NA NA
Type NA NA NA
Year of manufacture NA NA NA
Make NA Volt NA
Serial number
NA
Amperes
NA
Type NA Hp/ kW NA
Year of manufacturer
NA O/L setting(Thermal Over
load)
NA
-
7/27/2019 28 Circuit Breaker
3/15
DOC NO.: D-2-01-03-01-03
Power Contactor NA NA NA NA
Others NA NA NA NA
d) Operation checks
Date of Hydraulic Oil filling_____________________
Type of Hydraulic Oil _____________________
1. Venting of Hydraulic system
SL .NO ITEM DESCRIPTIONSTATUS
REMARKSYES NO
Pump NA NA NA
Pilot Valve NA NA NA
Accumulator NA NA NA
Hydraulic Mechanism NA NA NA
2. Pressurising hydraulic system
SL.NO DESCRIPTIONFACTORY
TEST VALUESITE TEST
VALUE
REMARK RECORDDEFICIENCIES,IF
ANY
1 Pre-filling pressure of N2 in accumulator ( bar /deg. C)
NA NA
2 Pump running time for charging hydraulicsystem from initial pressure to working pressure
NA NA
3 Checking safety valve (open/close) NA NA
4 Hydraulic pressure drop for 1 hr NA NA
Breaker on position NA NA
Breaker off position NA NA
5 Oil pressure monitor NA NA
Pump on / off bar NA NA
Pump running time NA NA
6 Auto reclosing lockout (oil) Pressure contact
_____________ make/break
NA NA
7 Closing lockout (oil) pressure Contact__________make/break
NA NA
8 General lockout (oil) Pressure contact__________ make/break
NA NA
9 Checking anti pumping contactor Pressurecontact __________make/break
NA NA
10 Checking loss of nitrogen Pressure contact__________make/break
NA NA
Factory test report ref no: ________________________________
3. Oil pressure drop during operations and pump running time in seconds
SL.NO DESCRIPTIONFACTORY TEST
VALUESITE TEST VALUE
(i) Pressure before operation(Bar)NA NA
Pressure after closing operation(Bar)NA NA
Pump running time(Sec)NA NA
(ii) Pressure before operation(Bar)NA NA
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 3 of15
-
7/27/2019 28 Circuit Breaker
4/15
DOC NO.: D-2-01-03-01-03
Pressure after opening operation(Bar)NA NA
Pump running time(Sec)NA NA
(iii) Pressure before operation(Bar)NA NA
Pressure after close/open operation (Bar)NA NA
Pump running time in secNA NA
(iv) Pressure before operation(Bar) NA NA
Pressure after open-close-open operation(Bar)NA NA
Pump running time(Sec)NA NA
Factory test report ref no: ________________________________ii. Pneumatic System
a) Operating system detailsR - Y - B Remarks
Air receiver no NA NA NA
Control block no NA NA NA
Pneumatic drive no NA NA NAMagnetic ventil no NA NA NA
b) Motor details
c) ICU Details
d) Details of Relays / Contactors used
Schematic drawing no______________________
CIRCUIT REFERENCE MAKE SERIAL NO. TYPE NO+NC
Air Pressure Monitor NA NA NA NA
Closing Lockout NA NA NA NA
Auto Reclosing Lockout NA NA NA NA
General Lockout NA NA NA NA
Pole Discrepancy Timer NA NA NA NA
Auxiliary NA NA NA NA
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 4 of15
Make NA Volt NA
Serial number NA Amperes NA
Type NA Hp/ kW NA
Year of manufacturer NA O/L setting (Thermal Over load) NA
Make NA
Serial number NA
Type NA
Discharge NA
Capacity NA
Year of manufacturer NA
-
7/27/2019 28 Circuit Breaker
5/15
DOC NO.: D-2-01-03-01-03
Power Contactor in ICU NA NA NA NA
Others NA NA NA NA
e) Pressure Switch setting
CIRCUIT REFERENCE
FACTORY SETTING
VALUE
SITE SETTING VALUE
MAKE
REMARKS
BLOCK DEBLOCK BLOCK DEBLOCK
Operation lockout -1 NA NA NA NA NA
Operation lockout -2 NA NA NA NA NA
Closing lockout NA NA NA NA NA
Auto reclosing ckt NA NA NA NA NA
Low/high pressure NA NA NA NA NA
Alarm circuit NA NA NA NA NA
ICU auto setting NA NA NA NA NA
ICU safety valve NA NA NA NA NA
OperationsNA NA NA NA NA
Factory test report ref no: ________________________________
f) Pressure drop during operation : ( in kg/ sq.cm -bar )
SL NO DESCRIPTIONFACTORY SETTING
VALUESITE SETTING
VALUE
A Tripping through TC-I NA NA
B Tripping through TC- II NA NA
C
Closing circuit
NA NA
D Close-open operation NA NA
E Open - close - open
NA NA
Factory test report ref no: ________________________________
g) Number of operation from local
Tank pressure ___________ kg/sq.cm or bar
BREAKER INITIALLY CLOSE :
FACTORY TEST : O-C-
NA
PLEASE KEEP INLET PNEUMATIC VALVE
CLOSED IN THESE OPERATION
SITE TEST : O-C-
NA
BREAKER INITIALLY OPEN :
FACTORY TEST : C-O-
NA
PLEASE KEEP INLET PNEUMATIC VALVE
CLOSED IN THESE OPERATION
SITE TEST : C-O-
NA
h) Air pressure drop in 24 hrs
DROP IN PRESSURE IN
KG/SQ.CM OR BAR
BREAKERONNA
BREAKEROFFNA
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 5 of15
-
7/27/2019 28 Circuit Breaker
6/15
DOC NO.: D-2-01-03-01-03
iii. SPRING OPERATING SYSTEMa) Motor details
MakeNA
VoltNA
Sl noNA
AmperesNA
TypeNA
Hp/kwNA
Year of ManufactureNA
Setting (thermal overload)NA
Dc current taken by motor for
charging the spring ( amp)
NA
b) Details of relays/contactors used : schematic drawing no
c) Spring operating time
DETAILS
R-PHASE Y-PHASE B-PHASE
FACTORY SITE FACTORY SITE FACTORY SITE
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 6 of15
CIRCUIT REFERENCE MAKE SERIAL NO. TYPE NO+NC
Closing lockoutNA NA NA NA
Auto reclosing lockoutNA NA NA NA
General lockoutNA NA NA NA
Pole descrepancy timerNA NA NA NA
AuxillaryNA NA NA NA
Power contactorNA NA NA NA
OthersNA NA NA NA
-
7/27/2019 28 Circuit Breaker
7/15
DOC NO.: D-2-01-03-01-03
CHARGING TIME 3.5s 3.6s 4.25s 4.0s 3.6s 3.9s
Factory test report ref no
IV. SF6 DENSITY MONITOR DETAILS
i.
R-PHASE Y-PHASE B-PHASE
Make WIKAI WIKAI WIKAI
Model - - -
Sl.no 280HNYI 280HNYH 280HNY
Year of manufacture
Quantity of SF6 gas filled actual 7.8bar 7.8bar 7.8bar
As per Specification
ii . SF6 density monitor settings
PHASE
DETAILS
BLOCKING DEBLOCKING
FACTORY SITE FACTORY SITE
R PHASE REFILL ALARM OPERATION BLOCK 6.4 6.4 6.7 6.7
Y PHASE REFILL ALARM OPERATION BLOCK 6.4 6.4 6.7 6.7
B PHASE REFILL ALARM OPERATION BLOCK 6.4 6.4 6.7 6.7
Factory test report ref no :iii. Measurement of dew point of sf6 gas
SL. NOMEASURED
VALUE PERMISSIBLE LIMITS TO BE DECIDED AS PER GRAPH
Rph -38C
Yph -37C
Bph -38C
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 7 of15
-
7/27/2019 28 Circuit Breaker
8/15
DOC NO.: D-2-01-03-01-03
NOTE: Dew point measurement of SF6 gas needs to be done pole wise in close loop method without any wastageof SF6 gas
iv. Leakage check
SL.NO INTERVALS UNIT
A
Initial filling of sf6 gas at ____deg c
(As per temp. Correction chart ) BAR 7.8
B Drop in sf6 gas pressure in 24 hrs : BAR 7.8
C
Final sf6 pressure at __24______deg. C
After all testing BAR 7.8
D
Additional leakage test by covering
individual joint with polythene
YES NO
V. COIL RESISTANCE MEASUREMENT
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 8 of15
-
7/27/2019 28 Circuit Breaker
9/15
DOC NO.: D-2-01-03-01-03
SL NO
PHASE
COILUNIT
MEASUREDVALUE
SERIESRESISTOR TOTAL
A R
TRIP COIL - I 145 NA 145
TRIP COIL - II 144 NA 144
CLOSE COIL 145 NA 145
BY
TRIP COIL - I 144 NA 144
TRIP COIL - II 145 NA 145
CLOSE COIL 144 NA 144
CB
TRIP COIL - I 146 NA 146
TRIP COIL - II 145 NA 145
CLOSE COIL 145 NA 145
VI. CIRCUITRY / OPERATIONAL CHECKS
SL NO CIRCUIT REFERENCECIRCUITARY CHECK OPERATIONAL CHECK
LOCAL REMOTE LOCAL REMOTE
A TRIPPING THROUGH TC-I OK OK OK OK
B TRIPPING THROUGH TC-II OK OK OK OK
C CLOSING CIRCUIT OK OK OK OK
D ANTI-HUNTING FEATUREOK
OK
OK
OK
OK
OK
OK
OK(CLOSE OPEN OPERATION )
E POLE DISCREPANCY FEATURE OK OK OK OK
F BREAKER POSITION INDICATION OK OK OK OK
G HEATER IN SWITCH CUBICLE OK OK OK OK
H HEATER IN CONTROL CUBICLE OK OK OK OK
I ILLUM. IN SWITCH CUBICLE OK OK OK OK
J ILLUM. IN CONTROL CUBICLE OK OK OK OK
Note: In case wiring for remote operation is not ready, please indicate terminal number along with wire ferrulenumber in switch cubicle where remote cables shall be terminated. Remote operation can be checked from these
terminals
VII. OPERATING TIME ( IN MILLI-SECONDS )
PHASE
BREAK
CLOSE(Max 150
ms)
T R I P (Max 25ms 400kV,35 ms
220kV, 40 ms 132kV)
CLOSE TRIP (Min. 35 ms)
TRIP - I TRIP - II TRIP I TRIP - II
R - ph main contactBREAK 1
106.3 22.6 22.5 50.3 50.5
R - PH PIR ( 12 4 ms)
Auxiliary contact 118.0 16.5 16.4 156.9 157.4
R - ph main contactBREAK 2
106.3 22.6 22.5 50.3 50.5
R - PH PIR ( 12 4 ms)
Auxiliary contact 118.0 16.5 16.4 156.9 157.4
Y - ph main contactBREAK 1
106.1 21.8 21.8 48.5 49.5
Y - PH PIR ( 12 4 ms)
Auxiliary contact 116.5 16.2 16.3 155.8 155.8
Y - ph main contactBREAK 2
106.1 21.7 21.8 48.5 49.5
Y - PH PIR ( 12 4 ms) Auxiliary contact 116.5 16.2 16.3 155.8 157.2
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 9 of15
-
7/27/2019 28 Circuit Breaker
10/15
DOC NO.: D-2-01-03-01-03
B - ph main contactBREAK 1
104.9 21.5 21.5 49.0 48..9
B - PH PIR ( 12 4 ms)
Auxiliary contact 114.5 16.4 16.3 156.6 156.9
B - ph main contact BREAK 2 104.9 21.5 21.5 49.0 48..9
B - PH PIR ( 12 4 ms)
Auxiliary contact 114.5 16.4 16.3 156.6 156.8
NOTE: for 765 kV, take measurements for four breaks
VIII. IR VALUE OF CONTROL CIRCUIT(USING 500 VOLT MEGGER)
COIL DETAILSUNIT MEASUREMENT VALUE
R PHASE TRIP COIL - I M >1000
R PHASE TRIP COIL - IIM >1000
R PHASE CLOSE COILM >1000
Y PHASE TRIP COIL - IM
>1000Y PHASE TRIP COIL - II
M >1000
Y PHASE CLOSE COILM >1000
B PHASE TRIP COIL - IM >1000
B PHASE TRIP COIL - IIM >1000
B PHASE CLOSE COILM >1000
CAUTION: Isolate necessary dc for trip coil i and trip coil ii ,closing coil before meggaring .
MINIMUM VALUE 2 MOHM
IX. IR VALUE WITH BREAKER OPEN(USING 5000 VOLT MEGGER)
ACROSS OPEN CONTACT UNIT MEASUREMENT VALUE
R - PHASE BREAK 1G 436
R - PHASE BREAK-2G 486
Y - PHASE BREAK 1G 500
Y - PHASE BREAK-2G 550
B - PHASE BREAK 1G 475
B - PHASE BREAK-2G 450
MINIMUM VALUE 2 MOHMX. IR VALUE WITH RESPECT TO EARTH WITH BREAKER CLOSED, EARTH SWITCHAND ISOLATOR OPEN
BETWEEN UNIT MEASUREMENT VALUE
R PHASE AND EARTHG 436
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 10 of15
-
7/27/2019 28 Circuit Breaker
11/15
DOC NO.: D-2-01-03-01-03
Y PHASE AND EARTHG 500
B PHASE AND EARTHG 450
XI. MINIMUM PICKUP VOLTAGE OF COILS
COIL DETAILSUNIT MEASUREMENT VALUE
R PHASE TRIP COIL - I V 109
R PHASE TRIP COIL - IIV 113
R PHASE CLOSE COILV 101
Y PHASE TRIP COIL - IV 105
Y PHASE TRIP COIL - IIV 103
Y PHASE CLOSE COILV 106
B PHASE TRIP COIL - IV 109
B PHASE TRIP COIL - IIV 108
B PHASE CLOSE COILV 103
XII. GRADING CAPACITOR - NAi. DETAILS
DETAILSINTERRUPTER 1 INTERRUPTER 2
R Y B R Y B
MAKE NA NA NA NA NA NA
SERIAL NO. NA NA NA NA NA NA
CAPACITANCE VALUE NA NA NA NA NA NA
FACTORY VALUE NA NA NA NA NA NA
YEAR OF MANUFAC. NA NA NA NA NA NA
ii. CAPACITANCE AND TAN DELTA MEASUREMENT (TO BE DONE IN UST MODE)
CAPACITANCEINTERRUPTER 1 INTERRUPTER 2
R Y B R Y B
SITE NA NA NA NA NA NA
-FACTORY NA NA NA NA NA NA
% DEVIATION NA NA NA NA NA NA
TAN DELTA NA NA NA NA NA NA
SITE NA NA NA NA NA NA
-FACTORY NA NA NA NA NA NA
% DEVIATION NA NA NA NA NA NA
Permissible Limits
a) Tan delta of grading capacitors 0.007 (max.)
b) Rate of rise in Tan Delta 0.001 per year (max)
c) Capacitance of grading capacitors within 5% of the rated value
Note:
a) Since temperature correction factor for Tan-Delta depends on make, type and also aging conditions, the correction
factors for different types / makes are different. Hence, no standard temperature correction factors can be applied.
b) In case of violation of Tan-Delta the test results with temperature are to be referred to CC/OS
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 11 of15
-
7/27/2019 28 Circuit Breaker
12/15
DOC NO.: D-2-01-03-01-03
XIII. CONTACT RESISTANCE MEASUREMENTEqipment detail:- CRM 100 &Sr No:-2300.06X60Calib date 29/12/2011All Values In Micro-Ohm
SL.NO
PHASE
ACROSS EACH POLE ACROSS INTERRUPTR 1 ACROSS INTERRUPTR 2
FACTORY SITE FACTORY SITE FACTORY SITE
A R-PHASE 75.1 82 NA 38 NA 39
B Y-PHASE 73.5 81 NA 39 NA 40
C B-PHASE 73.8 80 NA 38 NA 40
a)Contact Resistance of CB (in Micro-Ohm)* 75 (Micro-Ohm) per breakb)Contact Resistance of CB terminal connector 10 Micro-Ohm per connectorFactory test report ref no :______________________
XIV. BREAKER OPERATION COUNTER READING
XV. CHECK FOR ANNUNCIATION IN CONTROL ROOM AS PER THE FOLLOWINGFORMATS AND RECORD THE READING
SLNO
DESCRIPTIONOF TEST
SOURCE OFINITIATION
WINDOW
DESCRIPTION
RESULT REMARKOK NOTOK
A
Switch off the dc switch in Control
cubicle
Control cubicledc
Switch on/off
Source I/II dc
fail / ac failB Switch off the ac Switch in control Control cubicle Source I/II dc
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 12 of15
400kV 220kV 132kV
150 * 100 100
COUNTER TYPE PUT MARK
ELECTRICAL
MECHANICAL
SL.NO PHASE READING DATE
A R-PHASE 183 04/12/12
B Y-PHASE 226 04/12/12
C B-PHASE 213 04/12/12
-
7/27/2019 28 Circuit Breaker
13/15
DOC NO.: D-2-01-03-01-03
Cubicle
ac
Switch on/off fail / ac fail
C
Short the alarm contacts of sf6 Gas
density monitor (R-phase) Density monitor
Sf6 gas density
low
D
Short the alarm contacts of sf6 Gas
density monitor (Y-phase) Density monitor
Sf6 gas density
low
EShort the alarm contacts of sf6 Gasdensity monitor (B-phase) Density monitor
Sf6 gas densitylow
F
Remove the cable connected to
density monitor (R-phase)
Density monitor
Operation/closi
ng lockout
G
Remove the cable connected todensity monitor (Y-phase)
Density monitor
Operation/closi
ng lockout
H
Remove the cable connected to
density monitor (B-phase)Density monitor
Operation/closing lock out
I
Give tripping command to R-ph only
and check the operation of polediscrepancy relay
Pole discrepancyrelay at breaker
Cubicle Breaker polediscrepancy
J
Give tripping command to Y-phOnly and check the operation of pole
discrepancy relay
Pole discrepancy
relay at breakerCubicle
Breaker polediscrepancy
K
Give tripping Command to B-ph onlyand check the
operation of polediscrepancy relay
polediscrepancy
relay at breakercubicle
Breaker polediscrepancy
L
Check other alarms as per plantCircuit diagram
M
Close the breaker and trip throughProtection which are applicable
protection relayas per scheme
Breaker autotrip
NOTE : The tripping details are to be checked as per the Scheme approved byengineering.
XVI. DYNAMIC CONTACT RESISTANCE & TRAVEL MEASUREMENT
PHASE FACTORY SITE REMARKSAPPROVAL FROM
CC/OS OBTAINED
R
Y
Enclosed
B
XVII. OPERATION TIME MEASUREMENT OF POLE DISCREPANCY RELAY
Close/Trip time pole discrepancy at ratedoperating pressure Permissible Limits
a) Phase to Phase (Max) - close operation5.0ms
b) Phase to Phase (Max) - open operation 3.33ms
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 13 of15
-
7/27/2019 28 Circuit Breaker
14/15
DOC NO.: D-2-01-03-01-03
c) Break to Break (Max) of same pole 2.5 ms
Note- 2.5 Sec for CBs with Auto Reclose Function & 0.5 Sec for CBs without Auto Reclose Function.
XVIII. MECHANICAL CLOSE INTERLOCK CHECKED
(WHEREVER APPLICABLE)
XIX. FINAL DOCUMENTATION REVIEW
i. Factory test results are available
ii. Final documents of Pre- Commissioning checks reviewed and approved
iii. Document regarding spares equipment, O&M manuals etc available at sit
for O&M purpose
iv. After modification, if any, As built Drawings are available at site
v. CC-OS approved dcrm signatures available
Signature:
Name:
Designation:
Organization:(SupplierRepresentative)(WhereverApplicable)
Signature:
Name:
Designation:
(Erection Agency)
Signature:
Name:
Designation:
(POWERGRID SiteI/C)
Signature:
Name:
Designation:
(POWERGRIDCommissioning. Team)Members:1.2.
3.4.
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker
Page 14 of15
Yes No
Yes
Yes No
Yes
Yes No
Yes
Yes No
Yes
Yes No
Yes
Yes No
Yes
-
7/27/2019 28 Circuit Breaker
15/15
DOC NO.: D-2-01-03-01-03
Format No.: No. CF/CB/03/ R-3 DATED 01/04/2011 Circuit Breaker