15Per Salomonsson DME

download 15Per Salomonsson DME

of 24

Transcript of 15Per Salomonsson DME

  • 7/29/2019 15Per Salomonsson DME

    1/24

    From Wood to WheelPer Salomonsson

    7th Asian DME conference2011-11-16

  • 7/29/2019 15Per Salomonsson DME

    2/24

    European Project BioDME

    7th Framework Programme2

    BioDME From Wood to Wheel

    Worlds first demonstration of the highest scoring alternative fuelfrom the EUCAR/Concawe/JRCstudy

    Basis for REDFrom Wood to Wheel

    Production Distribution Vehicles

    Source:www.biofuelstp.eu

    SRA 2008

  • 7/29/2019 15Per Salomonsson DME

    3/24

    Production of DME from Biomass and utilisationas fuel for transport and for industrial use

    Starting date: 1 September 2008

    Duration 48 monthsContact: [email protected]

    Total budget 28.4 M

    EU funding: 8.2 MEnergimyndigheten: 9.6 M

    EUROPEAN PROJECTGrant agreement No: TREN/FP7EN/218923

  • 7/29/2019 15Per Salomonsson DME

    4/24

    BioDME consortium

    Chemrec and Haldor Topse developand build the DME plant in Pite

    Volvo Trucks develops and buildsDME trucks and a fuel injectionsystem together with Delphi

    ETC, the Energy Technology Centre in Pite,contributes its technical expertise

    Preem is responsible for Bio-DME distributionand builds fuel stations in Sweden

    Total is responsible for fuel andlubricant specifications

    The project is financed by the participants,the EU and the Swedish Energy Agency

  • 7/29/2019 15Per Salomonsson DME

    5/24

    European Project BioDME

    7th Framework Programme5

    Engineering, Procurement

    and Construction of the BioDME Plant

    Erection of main steel

    structure in May 2010

  • 7/29/2019 15Per Salomonsson DME

    6/24

    European Project BioDME

    7th Framework Programme6

    Engineering, Procurement

    and Construction of the BioDME Plant

    DME Productioncapacity: 4 tons / day

    Pipe installation: ~10 000 m

    Hand valves & on

    off valves: ~1400 pieces

    Instruments: ~450 pieces

    Vessels: ~30 pieces

    Heat exchangers: ~25 pieces

    Process Plant

    Foot Print 20 x 30 m

    Construction

    cost:

    ~ 20 million

  • 7/29/2019 15Per Salomonsson DME

    7/24

    First Bio-methanol produced

    Methanol sample from

    intermediate methanolproduction step

    ~7 m3 MeOH was produced in July before

    long (7 weeks) mill stop.Stored MeOH converted to DME Oct 27/28.

    Plant restarted October 17 and is currently taken into operation

  • 7/29/2019 15Per Salomonsson DME

    8/24

    European Project BioDME

    7th Framework Programme8

    Fuel Distribution

    Four filling stations dedicated for the 10 DME trucks in Sweden Based on existing LPG technology modified for DME Safety regulations based on LPG Total investment about 200.000 Euro per Filling Station

  • 7/29/2019 15Per Salomonsson DME

    9/24

    Fuel distribution

    European Project BioDME

    7th Framework Programme9

    Pite

    Stockholm

    Jnkping

    Gteborg

    Available technology modified for DME Low cost Easy to achieve

    200 m3 storage tank in Pite

    34 m3 trailer

  • 7/29/2019 15Per Salomonsson DME

    10/24

    DME fuelling

    49 L/min

    Truck fuelling recorded at Bckebol Dec 2010

    Minutes

    Liter

  • 7/29/2019 15Per Salomonsson DME

    11/24

    European Project BioDME

    7th Framework Programme11

    Volvo DME truck

    Standard Volvo truck New fuel system New engine control Diesel engine with diesel efficiency

    EMS

    Conventionaldiesel engine

    PumpDME tanksystem

    DME

    fuel

  • 7/29/2019 15Per Salomonsson DME

    12/24

    DME EUV engine

    Modifications compared to EUIV diesel engine (blue)

    6 cylinder, 12.8 litre engine Power,max: 440 hp at 1800 rpm Torque,max: 2200 Nm at 1200 rpm Compression ratio: 15.9 NOx reduction: cooled EGRAftertreatment system: ox-cat for CO and HC Euro 5 without urea SCR or Particulate filter Fuel consumption as diesel on energy basis

  • 7/29/2019 15Per Salomonsson DME

    13/24

    DME fuel system

    13 - 20 bar 1 - 15 bar200 - 400 bar

    Common rail system - low injection pressures System design + Control strategy to prevent

    evaporation in fuel lines DME compatible material in fuel system seals

  • 7/29/2019 15Per Salomonsson DME

    14/24

    Safety

    Non-toxic fuel Safety similar to LPG Driver educationOutdoor parking

  • 7/29/2019 15Per Salomonsson DME

    15/24

    Operational range

    ~800 km Two 465 liter DME tanks Depends on application

  • 7/29/2019 15Per Salomonsson DME

    16/24

    10 Field test trucks

  • 7/29/2019 15Per Salomonsson DME

    17/24

    Field test status 2011-11-07

    Trucks at customer: 9 Mileage last week: 11 643 km Average last 5 weeks 10 778 km Accumulated mileage: 213 069 km

  • 7/29/2019 15Per Salomonsson DME

    18/24

    HD BioDME trucks are in operation today!

  • 7/29/2019 15Per Salomonsson DME

    19/24

    Truck BioDME 9 / FH-842Field test start 2011-07-04

    Acc mileage (km) 25 215

    Average consumption 11,1 l DME/10 kmApplication 60 ton, Local haul, 24h/day

    Paper from mill to harbour

    ~20 trips / 480 km per day

    Truck BioDME 9

  • 7/29/2019 15Per Salomonsson DME

    20/24

    Truck BioDME 5 / FH-711

    Field test start 2011-02-22

    Acc mileage (km) 65 450

    Average consumption 7,7 l DME/10 kmApplication 25 - 50 ton, Regional haul,

    2-shift

    Day: 270 kmEvening: 350 km

    Truck BioDME 5

    Watch the video at:http://www.youtube.com/watch?feature=player_detailpage&v=3l0fr_I0p4Y

  • 7/29/2019 15Per Salomonsson DME

    21/24

    Summary

    More than one HD fuel in the future BioDME highest scoring alternative fuel from the JRC / Concawe study

    High CO2 reduction, energy efficient, cost efficient DME as a vehicle fuel is being demonstrated in the BioDME project Bigger threshold to introduce new fuel (compared to drop-in) Need long term regulatory framework designed to promote the bestalternative fuels Society should consider total cost balance initial investment and

    operating cost

    All new fuels need stable initial support to build local/regional markets DME has potential to become an important energy carrier for the future

  • 7/29/2019 15Per Salomonsson DME

    22/24

    Current Status of Domsj Project

    Domsj mill liquor gasified successfully in DP-1, Pite Investment support of 500 MMSEK granted by Swedish Energy Agency Sept 2009

    and finally approved by EUs DG Competition 1Q 2011

    Feasibility report completed (March 2010) Technology for Gas Purification and MeOH/DME Synthesis selected Front-end Engineering Design (FEED) scheduled for Q4-2011 to Q4-2012 for final

    investment decision in Q1 2013.

    Planned production start 2015, 100 000 ton DME/year or 140 000 ton MeOH/year

    &

    in collaboration

  • 7/29/2019 15Per Salomonsson DME

    23/24

    23

    Vision

    Carbon dioxide recycling in the methanol economy (Olah et al. 2009)

  • 7/29/2019 15Per Salomonsson DME

    24/24

    Thank you!

    www.biodme.eu