以创新融资及 PPP 模式来加速道路发展 : ...

18
以以以以以以 PPP 以以以以以以以以以 : 以以 以以以以以以以以以以以以以以以以 Binyam Reja 以以 以以以以以以以 以以以以 , 以以以以以以 2013 以 8 以 19 以 Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development Bank (ADB), its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this document, and accept no responsibility for any consequence of their use. By making any designation or reference to a particular territory or geographical area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.

description

以创新融资及 PPP 模式来加速道路发展 : 以印度卡纳塔克邦高速公路改善项目为例. Binyam Reja 博士 国家部门协调员 世界银行 , 中国交通部门 2013 年 8 月 19 日. Disclaimer: - PowerPoint PPT Presentation

Transcript of 以创新融资及 PPP 模式来加速道路发展 : ...

Page 1: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

以创新融资及 PPP 模式来加速道路发展 : 以印度卡纳塔克邦高速

公路改善项目为例Binyam Reja 博士 国家部门协调员

世界银行 , 中国交通部门2013 年 8 月 19 日

Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development Bank (ADB), its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this document, and accept no responsibility for any consequence of their use. By making any designation or reference to a particular territory or geographical area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

PPP Project Cycle and IFI Role

Page 3: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Background on Karnataka • State Government of Karnataka (GOK) successfully

completed KSHIP I – US$360 million IBRD Loan– Implemented between 2001-2007

• GOK requests a second IBRD loan for US$1.6 billion, but DEA/Bank endorse/approve only US$350 million

• Government Plans US$10 Billion investment to upgrade the CRN (20,000 km)

• Financing is Limited– Only US$360 million annual road budget (for the entire state)– At this rate, it will take more than 28 years to complete

the upgrading of the CRN

Page 4: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Current financing framework a constraint for accelerating road development

• Pay-as-you-go Funding Approach – Road sector expenditure funded from government taxes,

revenues and central grant transfers (Consolidated Fund)• Weaknesses in the Pay-as-you-go approach

– Volatile, depends on cyclical and unpredictable government revenue stream, Political appropriation

– Not suitable to fund large projects, as the available annual revenue is inadequate

– Projects have to be curtailed in size to fit into annual budget – Contracting method is generally item-rate-contract, has inefficiencies

and does not consider the lifetime cost of road– Long-term contract creates uncertainties as revenues are

unpredictable and budget has to be voted every year

Page 5: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Current Government Borrowing: Poorly Structured and Unsustainable

• Debt Financing is done on Government Balance Sheet – Sovereign international borrowing (WB/ADB/JICA) – State-owned Development Banks (limited) – Government deficit capped at 3% of GDP by Fiscal

Responsibility Act • Current borrowing does not link revenue stream to

repayment of debt – paid from budget revenues • Commercial banks do not lend to government for a specific

projects without a specific revenue stream • Commercial, revenue-backed debt financing limited • Government is always playing catch up on road expenditure

– rehabilitation/reconstruction, neglect, rehabilitation/reconstruction

Page 6: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

The Project Road Financing Reform Approach• Move away from pay-as-you go funding approach based on Consolidated

Fund and on-budget borrowing to revenue-backed long-term debt and PPP• Simultaneously solve investment and maintenance problem by combining

capital investment and maintenance expenditure into a Design-Build-Finance-Operate-Maintain-Transfer (DBFOMT) Concession

• At the same time, improve contract management efficiency by moving away from input-based BoQ contracts to output-based DBFO Concessions

• Establish Road Development Financing Facility (Road Fund) to pool user revenues – To be funded initially by tolls on existing and recently improved

highways – Followed by vehicle licensing fees, fuel levies, and other related

charges

• Securitize Road User Revenues to Pledge for PPP Concession Obligations and Debt Services

Page 7: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Benefits of Debt Financing and PPP Approach

• Complements Current Expenditure, not Replace it – Expands fiscal space, without necessarily harming the

government budget – New revenue sources to be raised from users – Can accommodate large, multi-year projects

• Improve efficiency of implementation – Encourages new contracting methods– Banks and concessionaires provide additional oversight

• Commercialization of the road sector, taking it out the budget

• Fast and effective implementation can expedite economic development

• Deepens the domestic financial sector

Page 8: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Benefits of PPP and Debt Financing Approach: Accelerated Development

Page 9: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Options for Leveraging Road Sector Revenue: Financing Strategy for SRN

Page 10: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Availability Payment (Annuity) PPP Concession

• Design-Build-Finance-Operate-Maintain-Transfer (DBFOMT) Contract

• Road Agency engages Concessionaire through Competitive Bidding

• Concessionaire borrows from financial institutions against annuity payment

• Road Fund revenues pays Concessionaire for constructing the highway available and maintaining agreed performance level

Page 11: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Availability Payment Structure

Road Fund (Trust and Retention Account)

Road Fund (Trust and Retention Account)

User Charges

User Charges

GOK Treasury

Concessionaire Concessionaire Lending Institutions

Lending Institutions

WB Loan

Equity Investors

Equity Investors

Contractors/sub-contractors

Road Agency Concession Authority

Technical Relationship

Page 12: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Key Features of the DBFO Concession• Four Road Corridors – 562 km • Concession Period – 10 years, including 2 years for construction period • Total Project Cost – US$437 million

– IBRD – US$140 million – Private Developer – US$250 million – GOK – US$47 million (mostly for land acquisition and R&R support)

• IBRD Finances 50% of estimated Construction Cost during construction period

• Government pays concessionaire semi-annual payments for the remaining construction costs plus O&M and other costs

• Bidding parameter is the lowest annuity payment request– It includes amortized construction cost, O&M, financing cost, and any

other costs the concessionaire includes – Amount of upfront grant will be disclosed during bidding – Concessionaire would raise financing based on promised grant and

projected semi-annual payment

Page 13: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

Payment Structure • During Construction Period

– 50 % of the Estimated Construction Cost Financed by IBRD paid in two installments– First Installment

• 50% percent completion of road length • 50% draw down on equity required for project implementation

– Second Installment on Commercial Operation Day

• Payment During Operation Phase – Semi-annual payment (annuity payment) – Concessionaire required to meet maintenance and performance criteria

• Penalties for not meeting the performance criteria

• Tolling is not part of the concession, but the authority may toll the roads separately and the revenues would be pooled together with other tolls and user charges

• Independent Engineer monitors compliance with Concession Agreement during construction and operation, and certifies payment (including any penalty/bonus)

Page 14: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

创新融资中的各个环节及对中国的意义:开展国际合作

Page 15: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

国际金融机构( IFI )的作用:建立PPP 项目的法律及政策框架

• 咨询支持及知识交流,实现以下目标:– 有利的立法及监管机制– 清晰的风险分配安排– 收费及定价政策– 政策应注重投资收益,注重保护公众利益,并为私

人投资创造有利环境– 创建一个单位来协调并引导国家 / 省级 / 产业等各

层面上的 PPP 项目– 清晰的争端解决及履约机制(包括监管)

Page 16: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

国际金融机构的作用:项目交易支持

• 金融交易及金融咨询师来设计 PPP 项目及具体交易:• PPP 项目应该是行业发展策略中的一部分,而不是孤立的• PPP 项目在进入交易流程之前应首先在行业范围内从经济和金融角度进行筛选,以保

证项目自身健康– PPP 项目首先必须是经济上具有可行性的项目– 决定何种项目应以 PPP 方式进行,何种项目应以传统方式进行– 判断何种项目需要政府资金支持,何种项目可产生收益保证其财务可行性

• 形成采购及招标的示范文件– 印度根据不同行业有不同的特许经营协议示范文件– 采购的透明度可以增加竞争

• PPP 能力发展及技术培训– PPP 项目需要合同设计、交易及执行方面的专门技能– 从业者的培训及知识交流很有必要

Page 17: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

国际金融机构的作用:为 PPP 交易建立融资及资助机制

• PPP 项目完成依靠项目财务– 利用 SPV (特殊目的平台)公司来实现有限追索权表外融资,但此类融资主要依靠项目

的未来收益现金流或政府支付来偿债• 长期资金渠道对于国家很重要

– 诸多商业银行均有短期贷款,但不适合基础设施融资需要– 应该发展金融行业来为 PPP 项目提供长期融资

• 有些情况下,经济上可行的项目未必在财务上具有可行性,此时可以:– 政府可提供额外资金让项目财务上同样可行– 印度“可行性缺口基金”( VGF )是一个成功的样本– IFI 可以从国家角度对 PPP予以资金支持

Page 18: 以创新融资及 PPP 模式来加速道路发展 :  以印度卡纳塔克邦高速公路改善项目为例

对中国的启示• 中国如何提升基础设施建设领域的 PPP规模?

– 构建合同框架来管理 PPP 项目合同• 中国的公私部门形成的合同常建立在关系上,其履行多依赖于双

方关系如何而非合同条款– 合同方自行解决争端

• PPP 项目签订的是长期合同,因此需要详细明确的合同• 长期合同中未来不可预见,则有可能需要合同的修订及定夺• 多方冲突可能发生• 第三方争端解决方案很必要

– 长期资金支持 PPP 项目很关键– 需要政府政策清晰、提供资金支持