Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

33

Demonstration Problem #1Demonstration Problem #1 Mr. Chan L. Cat wants a pond built on his property in Mr. Chan L. Cat wants a pond built on his property in

Lamar County, TX for livestock water. Location is 0.7 Lamar County, TX for livestock water. Location is 0.7 miles SW of Chicota, TX. This will be a low hazard pond.miles SW of Chicota, TX. This will be a low hazard pond.

The Elevation-Surface Area data in acres:The Elevation-Surface Area data in acres:89.9 – 0.089.9 – 0.096.0 – 1.2196.0 – 1.2197.0 – 1.6097.0 – 1.6098.0 – 1.9098.0 – 1.9099.0 – 3.8099.0 – 3.80

100.0 – 3.90100.0 – 3.90 101.0 – 4.0101.0 – 4.0

102.0 – 4.1102.0 – 4.1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

44

Demonstration Problem #1Demonstration Problem #1

Now execute WinPondNow execute WinPond Click > File > NewClick > File > New This will automatically pull up the default This will automatically pull up the default

template that you created previously.template that you created previously.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

55

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

66

Demonstration Problem #1Demonstration Problem #1

Location-Lamar County, TX-0.7 miles SW of Chicota, TXPrincipal Spillway Design Storm-5 yr-24 hr=5.55 inchesFreeboard Design Storm=25 yr-24 hr=7.8 inchesAllowable Velocity=5.0 fps.

"NOT STAKED YARDAGE"

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

77

Demonstration Problem #1Demonstration Problem #1

Select “File -> Save” orSelect “File -> Save” or “ “File -> Save As”File -> Save As” or press F10or press F10 Save As-DEMO1.prjSave As-DEMO1.prj Save frequentlySave frequently

Saving your dataSaving your data

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

88

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

99

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1010

Demonstration Problem #1Demonstration Problem #1 The drainage area data:The drainage area data:

Land Use: Pasture-47.9 AcresLand Use: Pasture-47.9 AcresHSG-B-28.9 Acres-FairHSG-B-28.9 Acres-FairHSG-C-19.0 Acres-GoodHSG-C-19.0 Acres-Good

Average Watershed Slope-2%Average Watershed Slope-2%Flow Length-1940 Ft.Flow Length-1940 Ft.

Auxiliary Spillway Design Storm-25 yr-24 hr-7.8 inches-Auxiliary Spillway Design Storm-25 yr-24 hr-7.8 inches-Type IIIType III

Allowable velocity in the Auxiliary Spillway-5.0 FPSAllowable velocity in the Auxiliary Spillway-5.0 FPS Auxiliary Spillway velocity without a pipe is 5.6 FPSAuxiliary Spillway velocity without a pipe is 5.6 FPS The Principal Spillway Design Storm will be 5.55 inches The Principal Spillway Design Storm will be 5.55 inches

for a 5 yr-24 hr storm.for a 5 yr-24 hr storm.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1111

Demonstration Problem #1Demonstration Problem #1LAMAR

COUNTY

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1212

Demonstration Problem #1Demonstration Problem #1

POND #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1313

Demonstration Problem #1Demonstration Problem #1

LAMAR COUNTY

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1414

Demonstration Problem #1Demonstration Problem #1

LAMAR COUNTY

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1515

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1616

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1717

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1818

Demonstration Problem #1Demonstration Problem #1 Sediment storage required will be:Sediment storage required will be:

Above Inlet (aerated sediment)= 0.03 AFAbove Inlet (aerated sediment)= 0.03 AFBelow Inlet (submerged sediment) = 0.03 AFBelow Inlet (submerged sediment) = 0.03 AF

The Principal Spillway Crest will be set at Elevation 96.0.The Principal Spillway Crest will be set at Elevation 96.0. The landowner wants a pipe drop for his pond.The landowner wants a pipe drop for his pond.

Top width is 12.0 ft.Top width is 12.0 ft.Front and back slopes will be 4:1Front and back slopes will be 4:1No berms are neededNo berms are neededPool Bottom elevation is 89.9Pool Bottom elevation is 89.9Channel and Outlet elevation is 86.0Channel and Outlet elevation is 86.0Tailwater elevation is 87.5Tailwater elevation is 87.5Outlet extension is 6.0 ft.Outlet extension is 6.0 ft.C/L low point elevation is 87.1C/L low point elevation is 87.1Auxiliary Spillway Exit Slope is 7.4%Auxiliary Spillway Exit Slope is 7.4%Conduit Invert is 89.0Conduit Invert is 89.0

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

1919

Demonstration Problem #1Demonstration Problem #1

Estimated sediment : 0.06 AF

1/2-Above the inlet (aerated)=0.03AF1/2-Below the inlet (submerged)=0.03AF.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2020

Demonstration Problem #1Demonstration Problem #1

Reduces the amount of storage available when the floodrouting is done.Used to determine the

minimum height for the inlet elevation.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2121

Demonstration Problem #1Demonstration Problem #1

LAMAR COUNTY

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2222

Demonstration Problem #1Demonstration Problem #1

Do you have adequate water yield for your purpose? For Lamar county the exhibit shows approx. 5 acres of drainage for each AF of storage. For this location we have 47.9 acres and should be able to supply 47.9/5.0=9.6 AF of storage. This location we need our water yield to supply approx. a max of 5.5 AF. So the pond has adequate water yield. Computer models such as RESOP or SPAW can be used for this determination if needed.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2323

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2424

Demonstration Problem #1Demonstration Problem #1

LAMAR COUNTY

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2525

Demonstration Problem #1Demonstration Problem #1

We want to be sure we have adequate depth for long time water storage. Based on this location we should have a minimum water depth of 8 ft. over 25% of the area. We are providing 6.1 ft. (96.0-89.9) of natural depth and will pick up additional depth from the borrow area in front of the pond. For this pond the constructed front bottom depth was El. 86.0 for a depth of 10.0 ft. (96.0-86.0).

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2626

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2727

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2828

Demonstration Problem #1Demonstration Problem #1

• We will use three pipe trials, all HCMP-Helical Corrugated Metal Pipe

12”, 18”, & 24” barrel

Use 18”, 30”, & 40” for riser size.

•The inlet extension horizontal distance is 5.0 ft

•Use an entrance coefficient of 1.0

•A Manning's “n” value of .011, .013, & .015 will be used

•Pipe length is computed based on constructed fill and slopes.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

2929

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3030

Demonstration Problem #1Demonstration Problem #1

This is for new pipe. You should add 10-20% to design for aged pipe condition.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3131

Demonstration Problem #1Demonstration Problem #1

List of pipe

sizes or direct

entree.

Accept default “n” or direct

entree.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3232

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3333

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3434

Demonstration Problem #1Demonstration Problem #1

• We will use the calculated method.

•The auxiliary spillway width is 20 ft. with a C retardance.

•The level section is 25 Ft. with 4:1 side slope.

•The exit channel will be a C retardance.

•The permissible velocity is 5.0 FPS

•Length 1 is 65 ft-5%; Length 2 is 105 ft.-5%

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3535

Demonstration Problem #1Demonstration Problem #1

Discharge will be calculated as in DAMS2

Qe values will be read from

the file ASFILE (same format as in DAMS2)

A file containing stage-discharge data will be read.

An auxiliary spillway will

not be routed.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3636

Demonstration Problem #1Demonstration Problem #1Discharge will be calculated as in DAMS2

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3737

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3838

Demonstration Problem #1Demonstration Problem #1

The top of fill elevation can be changed, but only to a larger value.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

3939

Demonstration Problem #1Demonstration Problem #1

“Use New Pipe Length”

This will return you to T-7, Principal Routing screen to run through the calculations with the new pipe length.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4040

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4141

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4242

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4343

Demonstration Problem #1Demonstration Problem #1

NOTE: Negative distance are upstream of centerline.

NOTE: To change H.I. or % ground

slope, double click on Elev. Or

Dist. Field.

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4444

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4545

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4646

Demonstration Problem #1Demonstration Problem #1 Station----Upstream RR/Distance---CL---Downstream RR/Distance

0+00 8.5 / 6.0 8.5 8.5 / 6.0

0+25 9/0 / 8.0 9.0 9.0 / 8.0

0+75 10.7 / 10.0 10.7 10.7 / 10.0

0+95 12.5 / 21.2 12.5 12.5 / 21.2

1+15 14.2 / 27.6 14.4 14.0 / 27.2

1+35 15.1 / 31.6 15.3 15.0 / 31.2

2+05 18.8 / 46.4 21.6 22.3 / 60.4

2+56 16.7 / 38.0 17.2 17.7 / 42.0

3+13 8.7 / 8.0 8.7 8.7 / 8.0

3+50 6.0 / 6.0 6.0 6.0 / 6.0

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4747

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4848

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

4949

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5050

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5151

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5252

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5353

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5454

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5555

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5656

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5757

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5858

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

5959

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6060

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6161

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6262

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6363

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6464

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6565

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6666

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6767

Demonstration Problem #1Demonstration Problem #1

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6868

Demonstration Problem #1Demonstration Problem #1

THE END

03/08/0703/08/07 CNTSC-WinPond Workshop DEMCNTSC-WinPond Workshop DEMO1O1

6969

Demonstration Problem #1Demonstration Problem #1 ““The U.S. Department of Agriculture (USDA) prohibits The U.S. Department of Agriculture (USDA) prohibits

discrimination in all its programs and activities on the basis of discrimination in all its programs and activities on the basis of race, color, national origin, sex, religion, age, disability, political race, color, national origin, sex, religion, age, disability, political beliefs, sexual orientation, and marital or family status. (Not all beliefs, sexual orientation, and marital or family status. (Not all prohibited bases apply to all programs.) Persons with prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should program information (Braille, large print, audiotape, etc.) should contact USDA's contact USDA's TARGET CenterTARGET Center at 202-720-2600 (voice and at 202-720-2600 (voice and TDD).TDD).

““To file a complaint of discrimination write USDA, Director, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or Independence Avenue, SW, Washington, DC 20250-9410 or call 202-720-5964 (voice or TDD). USDA is an equal call 202-720-5964 (voice or TDD). USDA is an equal opportunity provider and employer.”opportunity provider and employer.”