MIQA & PSM

Post on 15-Apr-2017

76 views 3 download

Transcript of MIQA & PSM

Born Sick

Premature ageing

normal ageing

Life enhancement

If we are not aware about probability of failure due to complexity but at least we should be aware about consequence if things fail and have the barriers and monitoring as well as its hazard control .

High Temperature Sulfidation

Ф52” just upstream of bend ruptured

Low Silicon CS

Tesoro Refinery, 2 Apr 2010, six fatalities

Thinning & Over pressurization

Shock Condensation & UDCBadly failed after 11 months of operation

CLSCC

Integrated Integrity of Entire Plant from

cradle to grave

1. Desired operational reliability & safety between TAs

2. Desired optimum plant run-length time between TAs

3. Maximum cost effective life out of aging equipment without failure

4. Optimum inspection interval for each item 5. Optimum spending on Capex and Revex

Plant Site:5 strategic goals

For the proactive culture to survive over the long term, it takes significant management

energy as well as a strong commitment from all levels of

the organization

Change Reactive to Proactive Culture We, as Site management be passionate in overcoming the organizational inertia built around a reactive culture. In the past, companies that were successful in making the proactive transition were under intense economic pressure - they had to become reliable or go out of business. If management energy is removed, the culture will quickly return to being reactive.

Reactive Culture over Proactive Culture is

Desirable in attending Fire & safety matters