MIQA & PSM

105

Transcript of MIQA & PSM

Page 1: MIQA & PSM
Page 2: MIQA & PSM
Page 3: MIQA & PSM
Page 4: MIQA & PSM

Born Sick

Premature ageing

normal ageing

Life enhancement

Page 5: MIQA & PSM
Page 6: MIQA & PSM

If we are not aware about probability of failure due to complexity but at least we should be aware about consequence if things fail and have the barriers and monitoring as well as its hazard control .

Page 7: MIQA & PSM
Page 8: MIQA & PSM
Page 9: MIQA & PSM
Page 10: MIQA & PSM
Page 11: MIQA & PSM
Page 12: MIQA & PSM
Page 13: MIQA & PSM
Page 14: MIQA & PSM
Page 15: MIQA & PSM
Page 16: MIQA & PSM

High Temperature Sulfidation

Ф52” just upstream of bend ruptured

Low Silicon CS

Page 17: MIQA & PSM

Tesoro Refinery, 2 Apr 2010, six fatalities

Page 18: MIQA & PSM

Thinning & Over pressurization

Page 19: MIQA & PSM
Page 20: MIQA & PSM
Page 21: MIQA & PSM
Page 22: MIQA & PSM

Shock Condensation & UDCBadly failed after 11 months of operation

Page 23: MIQA & PSM

CLSCC

Page 24: MIQA & PSM
Page 25: MIQA & PSM
Page 26: MIQA & PSM
Page 27: MIQA & PSM
Page 28: MIQA & PSM
Page 29: MIQA & PSM
Page 30: MIQA & PSM
Page 31: MIQA & PSM
Page 32: MIQA & PSM
Page 33: MIQA & PSM
Page 34: MIQA & PSM
Page 35: MIQA & PSM
Page 36: MIQA & PSM
Page 37: MIQA & PSM
Page 38: MIQA & PSM
Page 39: MIQA & PSM
Page 40: MIQA & PSM
Page 41: MIQA & PSM
Page 42: MIQA & PSM
Page 43: MIQA & PSM
Page 44: MIQA & PSM
Page 45: MIQA & PSM
Page 46: MIQA & PSM
Page 47: MIQA & PSM
Page 48: MIQA & PSM
Page 49: MIQA & PSM
Page 50: MIQA & PSM
Page 51: MIQA & PSM
Page 52: MIQA & PSM
Page 53: MIQA & PSM
Page 54: MIQA & PSM
Page 55: MIQA & PSM
Page 56: MIQA & PSM
Page 57: MIQA & PSM
Page 58: MIQA & PSM
Page 59: MIQA & PSM
Page 60: MIQA & PSM
Page 61: MIQA & PSM
Page 62: MIQA & PSM
Page 63: MIQA & PSM
Page 64: MIQA & PSM
Page 65: MIQA & PSM
Page 66: MIQA & PSM
Page 67: MIQA & PSM
Page 68: MIQA & PSM
Page 69: MIQA & PSM
Page 70: MIQA & PSM
Page 71: MIQA & PSM

Integrated Integrity of Entire Plant from

cradle to grave

Page 72: MIQA & PSM
Page 73: MIQA & PSM
Page 74: MIQA & PSM
Page 75: MIQA & PSM
Page 76: MIQA & PSM
Page 77: MIQA & PSM
Page 78: MIQA & PSM
Page 79: MIQA & PSM
Page 80: MIQA & PSM
Page 81: MIQA & PSM
Page 82: MIQA & PSM
Page 83: MIQA & PSM
Page 84: MIQA & PSM
Page 85: MIQA & PSM
Page 86: MIQA & PSM

1. Desired operational reliability & safety between TAs

2. Desired optimum plant run-length time between TAs

3. Maximum cost effective life out of aging equipment without failure

4. Optimum inspection interval for each item 5. Optimum spending on Capex and Revex

Plant Site:5 strategic goals

Page 87: MIQA & PSM
Page 88: MIQA & PSM
Page 89: MIQA & PSM
Page 90: MIQA & PSM
Page 91: MIQA & PSM
Page 92: MIQA & PSM

For the proactive culture to survive over the long term, it takes significant management

energy as well as a strong commitment from all levels of

the organization

Page 93: MIQA & PSM

Change Reactive to Proactive Culture We, as Site management be passionate in overcoming the organizational inertia built around a reactive culture. In the past, companies that were successful in making the proactive transition were under intense economic pressure - they had to become reliable or go out of business. If management energy is removed, the culture will quickly return to being reactive.

Page 94: MIQA & PSM
Page 95: MIQA & PSM

Reactive Culture over Proactive Culture is

Desirable in attending Fire & safety matters

Page 96: MIQA & PSM
Page 97: MIQA & PSM
Page 98: MIQA & PSM
Page 99: MIQA & PSM
Page 100: MIQA & PSM
Page 101: MIQA & PSM
Page 102: MIQA & PSM
Page 103: MIQA & PSM
Page 104: MIQA & PSM
Page 105: MIQA & PSM