Post on 28-Jul-2020
Corporate Information 12 February 2015
Civil Work
Mechanical
Electrical
Balance & Test
Registered Capital: 6.22 US$M.
Sell Capacity: 8 MW
Location: Chaimongkol Mahachai Samutsakhon
ถอืหุน้ 46%
MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW
Land
• Land Owned
by Company
Loan
• Offering a bank to
consider
Technical
• Using the same
technology as CRB
• MOU fuel
Permission
• PPA • Industrial
Permission
• BOI
** Change PPA from Adder to FiT Price System
58.80%
69.75%
MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW
3
MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW
Civil Work
Mechanical
Electrical
Balance & Test
Registered Capital: 5.924 US$M.
Sell Capacity: 8 MW
Location: Wangsan Maewong Nakhonsawan
Share 85%
Land
• Land Owned
by Company
Loan
• KTB
Technical
• Technology and plans
are ready
• O&M contract
Permission
• Industrial Permission
• BOI
• PPA : Sign Contract
MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW
** Change PPA from Adder to FiT Price System
76.69%
85.19%
6
MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW
MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW
Civil Work
Mechanical
Electrical
Balance & Test
8
Land
• Land Owned
by Company
Loan
• Receiveing the
approval of the
loan
Technical
• Using the same
technology as CRB
• O&M contract
Permission
• PPA
• Industrial
Permission • BOI
Registered Capital: 5.924 US$M.
Sell Capacity: 9.2 MW
Location: Thungsung Thungyai Nakhonsithammarat
ถอืหุน้ 65%
land reclamation
THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW
** Change PPA from Adder to FiT Price System
9
THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW
10
THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW
Civil Work
Mechanical
Electrical
Balance & Test
11
Land
• Making contracts to
buy and sell land
26.5
Loan
• Offering a bank to
consider
Technical
• Using the same
technology as CRB
• Sufficient fuel
Permission
• Council Abt. / not in
building control area
• Industrial Permission
• PPA : Sign Contract
Registered Capital: 7.405 US$M.
Sell Capacity: 9.2 MW
Location: T.Pabon A.Pabon Phatthalung
Share 80%
WWE
Share 20%
PHATTHALUNG GREEN POWER : PGP INSTALL CAPACITY 9.9 MW
** Change PPA from Adder to FiT Price System
q,,. I
n1 rl1t1fi'M>nL \Jn1 PGP rm!! food> • Tll'C POWCR HOLDING
12
Civil Work
Mechanical
Electrical
Balance & Test
13
Land
• Making a sale and
purchase Contract
pledging 12.9
million baht
Loan
• Offering a bank to
consider
Technical
• Using the same
technology as CRB
Permission
• Council Abt. / not in building control area
• Industrial Permission • PPA : Sign Contract
Registered Capital: 7.405 US$M.
Sell Capacity: 9.2 MW
Location: T.Khuankalong A.Khuankalong Satun
Share 51%
WWE
Share 40%
GPP
Share 9%
SATUN GREEN POWER : SGP INSTALL CAPACITY 9.9 MW
** Change PPA from Adder to FiT Price System
ภาพถ่ายพืน้ ท่ี
โครงการ SGP
14
Civil Work
Mechanical
Electrical
Balance & Test
15
Land
• Land Owned by
Partner
Loan
• Offering a bank to
consider
Technical
• During design
• Procuring
technology
• Sufficient fuel
Permission
• Offering a bank to consider
• EIA: 2nd Community
• Collecting document
for request PPA
Registered Capital: 796,208 US$.
Sell Capacity: 21+21 MW
Location: Lipasango Nongchik Pattani
Share 65%
PATTANI GREEN : PTG INSTALL CAPACITY 46 MW