Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building...

15
Corporate Information 12 February 2015

Transcript of Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building...

Page 1: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Corporate Information 12 February 2015

Page 2: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

Registered Capital: 6.22 US$M.

Sell Capacity: 8 MW

Location: Chaimongkol Mahachai Samutsakhon

ถอืหุน้ 46%

MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW

Land

• Land Owned

by Company

Loan

• Offering a bank to

consider

Technical

• Using the same

technology as CRB

• MOU fuel

Permission

• PPA • Industrial

Permission

• BOI

** Change PPA from Adder to FiT Price System

58.80%

69.75%

Page 3: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW

3

Page 4: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

MAHACHAI GREEN POWER : MGP INSTALL CAPACITY 9.5 MW

Page 5: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

Registered Capital: 5.924 US$M.

Sell Capacity: 8 MW

Location: Wangsan Maewong Nakhonsawan

Share 85%

Land

• Land Owned

by Company

Loan

• KTB

Technical

• Technology and plans

are ready

• O&M contract

Permission

• Industrial Permission

• BOI

• PPA : Sign Contract

MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW

** Change PPA from Adder to FiT Price System

76.69%

85.19%

Page 6: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

6

MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW

Page 7: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

MAEWONG ENERGY : MWE INSTALL CAPACITY 9.9 MW

Page 8: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

8

Land

• Land Owned

by Company

Loan

• Receiveing the

approval of the

loan

Technical

• Using the same

technology as CRB

• O&M contract

Permission

• PPA

• Industrial

Permission • BOI

Registered Capital: 5.924 US$M.

Sell Capacity: 9.2 MW

Location: Thungsung Thungyai Nakhonsithammarat

ถอืหุน้ 65%

land reclamation

THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW

** Change PPA from Adder to FiT Price System

Page 9: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

9

THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW

Page 10: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

10

THUNGSUNG GREEN : TSG INSTALL CAPACITY 9.5 MW

Page 11: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

11

Land

• Making contracts to

buy and sell land

26.5

Loan

• Offering a bank to

consider

Technical

• Using the same

technology as CRB

• Sufficient fuel

Permission

• Council Abt. / not in

building control area

• Industrial Permission

• PPA : Sign Contract

Registered Capital: 7.405 US$M.

Sell Capacity: 9.2 MW

Location: T.Pabon A.Pabon Phatthalung

Share 80%

WWE

Share 20%

PHATTHALUNG GREEN POWER : PGP INSTALL CAPACITY 9.9 MW

** Change PPA from Adder to FiT Price System

Page 12: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

q,,. I

n1 rl1t1fi'M>nL \Jn1 PGP rm!! food> • Tll'C POWCR HOLDING

12

Page 13: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

13

Land

• Making a sale and

purchase Contract

pledging 12.9

million baht

Loan

• Offering a bank to

consider

Technical

• Using the same

technology as CRB

Permission

• Council Abt. / not in building control area

• Industrial Permission • PPA : Sign Contract

Registered Capital: 7.405 US$M.

Sell Capacity: 9.2 MW

Location: T.Khuankalong A.Khuankalong Satun

Share 51%

WWE

Share 40%

GPP

Share 9%

SATUN GREEN POWER : SGP INSTALL CAPACITY 9.9 MW

** Change PPA from Adder to FiT Price System

Page 14: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

ภาพถ่ายพืน้ ท่ี

โครงการ SGP

14

Page 15: Corporate Information 12 February 2015 - tpcpower.co.th … · • Council Abt. / not in building control area • Industrial Permission • PPA : Sign Contract

Civil Work

Mechanical

Electrical

Balance & Test

15

Land

• Land Owned by

Partner

Loan

• Offering a bank to

consider

Technical

• During design

• Procuring

technology

• Sufficient fuel

Permission

• Offering a bank to consider

• EIA: 2nd Community

• Collecting document

for request PPA

Registered Capital: 796,208 US$.

Sell Capacity: 21+21 MW

Location: Lipasango Nongchik Pattani

Share 65%

PATTANI GREEN : PTG INSTALL CAPACITY 46 MW