cml tainan design

Post on 22-Mar-2016

235 views 2 download

description

design brochure

Transcript of cml tainan design

2012.11.02

CML TAINAN FACILITY OFFICE INTERIOR

中華機械台南廠辦公室裝修設計簡報

DESIGN PROPOSAL

Exclusive Design Inc.Exclusive Design Inc.境新工程設計

1

2

1F PLAN

3 2

13 5 67

9

10

1112

8

4

RECEPTION AREA

( 20 persons )

3

1F -LOBBY PLAN

RECEPTION AREA

INFORMATION

LOGO

MAIL BOX

SOFA

4

2F PLAN

3

4

57

1

8 2

RESTROOM

6

( 56 – 70 persons)( 6 persons)

( 52 - 64 persons)

52F SHOWER ROOM & CHANGING ROOM

Window

B-PLANA-PLAN

Window

Window

Bench-H45cm

locker

Washing Machine

Bench-H45cm

locker

Washing Machine

Shoe cabinetWash basin

Window

6

LOBBY IMAGEMAIL BOX

STAIR IMAGE

7

LOBBY 3D

LOGO-Option A

8

LOBBY 3D

LOGO-Option A

9

LOBBY 3D

LOGO-Option A Elevation

10

LOBBY 3D

LOGO-Option B

11

LOBBY 3D

LOGO-Option B Elevation

12

LOBBY 3D

13

1F MERCHANDISE ROOM 3D

14

1F MERCHANDISE ROOM 3D

15

1F 2F RESTROOM IMAGE

Female

male

male

Female

Pantry

MINI BAR

16

1F MAIN CONFERENCE ROOM

18-20 person

17

1F MAIN CONFERENCE ROOM 3D

18

1F MD ROOM & AREA GM ROOM & VISITOR ROOM

MD ROOM

AREA GM ROOM & VISITOR ROOM

19

WORKSTATION AREA

glass

Linseed oil tile

Melamine board

Floor_OA Partition_Acrylic +Point screws

Wall_

Anti-dirty construction

20

2F TRAINING ROOM&TECHNOLOGY TRAINING ROOM&MEETING ROOM

Training Room

Technology training Room & Meeting Room

21

2F DINING ROOM IMAGE

222F OPEN-TO-SKY CENTRAL COURTYARD

23

2F OPEN-TO-SKY CENTRAL COURTYARD IMAGE

Wood floor

24

2F OPEN-TO-SKY CENTRAL COURTYARD OPTION B

25

2F OPEN-TO-SKY CENTRAL COURTYARD & DINING ROOM 3D

Option B-Vertical garden

26

2F OPEN-TO-SKY CENTRAL COURTYARD & DINING ROOM

1

2

1

1

2

27

40CM-50CM

2F RESTROOM IMAGE

28

AIR CONDITION WORK PLANNING

可變流量節能群控空調工程Air conditioning variable group control system

Energy saving planning

Power Consumption Comparison Chart Air conditioning and group control variable comparison chart

29

AIR CONDITION WORK PLANNING

1F FLOOR

Air conditioning variable group control system

30

AIR CONDITION WORK PLANNING

2F FLOOR

Air conditioning variable group control system

31

AIR CONDITION WORK PLANNING

ROOF

Air conditioning variable group control system

32

OFFICE LIGHTING _ LED PLANNING

33

OFFICE LIGHTING _ LED PLANNING

34

OFFICE LIGHTING _ LED PLANNING

35

OFFICE LIGHTING _ LED PLANNING

36

Remote Lighting Control System

37

Remote Lighting Control System

38

Remote Lighting Control System

39

Remote Lighting Control System

40

Remote Lighting Control System

41

Remote Lighting Control System

42

Interior decoration work project

43

Interior decoration work project

THE END