3-5 Nov 2014 1
IAEA Technical Meeting on Engineering Responsibility and Design Authority Concept for the Review of Nuclear Power Plant Designs at Istanbul Technical University, Istanbul Turkey
3~5 November 2014
Nasir Mahmood Manager Fluid Systems Division
DNPEP, PAEC
Review of
Nuclear Power Plant Systems Design
3-5 Nov 2014 2
Pakistan’s Nuclear Power Program
NPP’s OPERATING CAPACITY (MW) COMMISSIONING YEAR
K-1 125 1972
C-1 325 2000
C-2 340 2011
NPP‘s UNDER CONSTRUCTION
CAPACITY (MW) EXPECTED COMM. YEAR
C-3 340 2016
C-4 340 2017
K-2 1000 2019
K-3 1000 2020
CJL Canal
Nuclear Aux. Bldg
Turbine Bldg
Circulating Pump house
Water Trtmt. Plant
Switch Yard
Reactor Building
Emergency Diesel Generator
3 3-5 Nov 2014
Implementation of Nuclear Power Program
Plants in operation or under-construction completed by foreign contractors on turnkey basis
K-1 complete turnkey by AECL
C-1, C-2, C-3 and C-4 turnkey by CNNC (except part of civil work)
K-2/ K-3 also turnkey by CNNC (except part of civil work)
3-5 Nov 2014 4
Pakistan Nuclear Power Program
3-5 Nov 2014 5
Supplier (CZEC)
Directorate of
Technical Support
Directorate of
Quality Assurance
Pakistan Nuclear Regulatory Authority
Directorate of
Nuclear Power Engineering (DNPE)
Operating Power Plants(CNPGS)
Member (Engineering)
Directorate General Nuclear Power Engineering
3-5 Nov 2014 22
CHAIRMAN (PAEC)
Member (Power)
Directorate General CNPGS
3-5 Nov 2014 23
Goals • Provide energy security • Achieve self reliance • Partnership between PAEC & industry • Develop design capability • Provide technical support to NPPs • Planning, studies & engineering of future NPPs
Responsibilities
• Site selection and evaluation, design, analysis of buildings and structures of NPPs • Review of Technical Annexure • Review of design and engineering documents • Interface with the designers/supplier • Interface with the regulatory body for licensing • Participation in basic and detailed design with designer • Have been involved in the preparation, review, acceptance, approval, implementation,
and management of design during design phase • Design and engineering of systems, components in PAEC scope. • Technical support to operating NPPs Dire
ctor
ate
Gen
eral
Nuc
lear
Pow
er E
ngin
eerin
g
3-5 Nov 2014 24
Coordination Department Received Documents
Plant Design Directorate
Reactor Design Directorate
Directorate of Civil and Structure
Review of Nuclear Power Plant System Design
CZEC Review Responsibility
Nuclear Power Engineering Directorate
3-5 Nov 2014 25
Plant Design Directorate
Fluid Systems Division
Mechanical Equipment Division
Electrical Division
Instrumentation and Control Division
Review Responsibility (cont..)
3-5 Nov 2014 26
Review of Design Documents Tw
o St
age
Revi
ew
Basic Design Documents
Detailed Design Documents
Design Inputs
• Commitments in the Technical
Annexure at the time of contract
• Reference Plant Relevant
documents/parameters
• Relevant Codes and Standards
• Issues raised in the review process
of PSAR/FSAR of operating plants
• Feedbacks from the operating plants
• Regulatory requirement if any
3-5 Nov 2014 27
Review Process
Coordination Directorate prepare a check list for review
• Responsible engineer review the document and produce comments
• Comments are further reviewed by a senior engineer of the relevant
discipline as per check list
• After finalizing the comments at senior engineer level comments are
forwarded to Manager of the relevant division
• Comments are reviewed at director level
• Forwarded to coordination Directorate
• Further reviewed and forwarded to CZEC or dropped
3-5 Nov 2014 28
Review of Detailed Design Documents
Review inputs:
• Commitments in the Technical Annexure at the time of contract
• Reference Plant Relevant documents/parameters
• Relevant Codes and Standards
• Issues raised in the review process of PSAR/FSAR of operating
plants
• Feedbacks from the operating plants
• Regulatory requirement if any
• To ensure the implementation of basic design review comments
3-5 Nov 2014 30
WHY?
Engineering support is essential to maintain design and configuration so as:
• To ensure the safe operation of NPPs • To maximize their availability and productivity
AREAS IN WHICH TECHNICAL SUPPORT IS PROVIDED
Responsible Designer support in various areas, including
• Specific research • Engineering services • Development of technical improvements • Analysis and testing
ASSISTANCE TO AN NPP OPERATING ORGANIZATION ON DESIGN DECISIONS
• "R & D " and designer can provide technical support to “services” • Feedback from the "service " are provided to "R & D" and "designer" to
enhance plant safety performance.
TECH
NIC
AL S
UPP
ORT
BY
SUPP
LIER