RIL
CP
STAT
ION
PON
D
PON
D
PON
D
PON
D
PON
D
PON
D
JM
3
3.18
BPEP
BP
BP
EP
BP
BP
EP
16.411
m
17.828
m
16.510
m16.093
m
16.881
m16.559
m
17.630
m
17.393
m
18.473
m
18.236
m
19.513
m19.276
m
Plan of Shivaji Nagar Interchange
Plan of Shivaji Nagar Interchange
B-034
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
RAMP CA at Shivaji Nagar
RAMP MA at Shivaji Nagar
RAMP AC at Shivaji Nagar
RAMP MJ at Shivaji Nagar
RAMP AM at Shivaji Nagar
RAMP JM at Shivaji Nagar
JMA2
CAA2
CAP1
MAP1
MAA2
MJP1
MJA2
ACA2
ACP1
AMP1
AMA2
LVL.
LONGITUDINAL SECTION OF RAMP MA FROM MTHL TO PROPOSED NAVI MUMBAI AIRPORT
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
CHAINAGE
HORIZONTAL
FINISH ROAD
EXISTINGGROUND LVL.
VERTICAL
16.828
16.678
8.150
8.150i=0.500%L=30.000m
i=3.300%L=258.400m
LevelL=165.300m
10
15
20
5
0
15 15 15 15 15 1515 15 15 15 15 15 15 15 15Bridge Length 225
STA 0+46.3(STA 17+121.1)
Nose
EXISTING GROUND LEVEL
PROPOSED RAMP PROFILE 85005007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP MA
General View of RAMP MA at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-035
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
LONGITUDINAL SECTION OF RAMP 'AC' FROM PROPOSED NAVI MUMBAI AIRPORT TO MTHL CHIRLE
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
HORIZONTAL
CHAINAGE
FINISH ROADLVL.EXISTING GROUND LVL.
VERTICAL
8.050
7.574
18.074
18.236i=0.250%L=190.300m
i=3.300%
L=318.200m i=
0.540%
L=30.0
00m
10
15
20
5
0
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 151515Bridge Length 285
STA 0+
538.5
(STA 1
7+622.
6)Nos
e
EXISTING GROUND LEVEL
PROPOSED RAMP PROFILE8500
5007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP AC
General View of RAMP AC at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-036
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
HORIZONTAL
CHAINAGE
FINISH ROADLVL.EXISTING GROUND LVL.
VERTICAL
LONGITUDINAL SECTION OF RAMP 'JM' FROM JNPT TO MTHL MUMBAI
8.150
8.150
12.343
15.943
16.093
LevelL=40.000m
i=2.008%
L=208.800m
i=1.200%
L=300.000m i=
0.500%
L=30.0
00m
10
15
5
0
20
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 1515151515151515 15Bridge Length 390
MTHL(SEWRI/MUMBAI)
STA 0+
578.8
Nose
(STA 1
7+101.
3)
EXISTING GROUND LEVEL
PROPOSED RAMP PROFILE8500
5007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP JM
General View of RAMP JM at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-037
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
FINISH ROAD
LONGITUDINAL SECTION OF LOOP MJ FROM MUMBAI TO JNPT
HORIZONTAL
GROUND LVL.
CHAINAGE
LVL.EXISTING
VERTICAL
17.393
17.555
i=0.54
0%
L=30.0
00m
8.329
8.133i=2.426%L=380.300m
i=0.245%L=80.000m
10
15
5
20
0
11 10 10 15 15 15 15 15 15 15 14 13 13 13 13 13 12 13 13 15 15 15 15 15 15 15 15 15
Bridge Length 388
Nose
STA 0+
49.7
(STA 1
7+466.
0)
EXISTING GROUND LEVEL
PROPOSED RAMP PROFILE
8500
5007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP MJ
General View of RAMP MJ at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-038
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
LONGITUDINAL SECTION OF LOOP 'CA' FROM CHIRLE TO NAVI MUMBAI AIRPORT
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
HORIZONTAL
CHAINAGE
FINISH ROADLVL.EXISTING GROUND LVL.
VERTICAL
16.559
16.397i=0.540%L=30.000m
i=2.022%L=403.100m 8.245
8.347
i=0.25
5%
L=40.0
00m
10
15
20
5
0
-5
15 15 15 15 15 15 15 15 15 15 15 15 13 13 1310 13 13 13 15 15 15 15 15 15 15Bridge Length 373
Nose
STA 0+
561.0
EXISTING GROUND LEVEL
PROPOSED RAMP PROFILE
8500
5007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP CA
General View of RAMP CA at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-039
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
CHAINAGE
LVL.
GROUND LVL.
VERTICAL
HORIZONTAL
CHAINAGE
FINISH ROADLVL.EXISTING GROUND LVL.
VERTICAL
8.299
8.373
19.567
19.276
i=3.300%
L=339.200mi=
0.247%
L=30.0
00m
i=0.970%L=30.000m
10
15
20
5
0
STA 0+399.
2Nose
(STA 17+78
7.1)
PROPOSED RAMP PROFILE
EXISTING GROUND LEVEL
8500
5007500500
900150
600
150
2.5% SCOPE
LC1 - 1
Generel View of RAMP AM
General View of RAMP AM at Shivaji Nagar Interchange
at Shivaji Nagar Interchange
1
1
1
1
B-040
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
SHO
P
SHO
PS
HOP
SHO
P
SHO
P
SHO
P
SHO
P
SHO
P
SHO
P
HUT
HUT
HUT
WEL
L
CR
USH
ER A
REA
CR
USH
ER A
REA
CR
USH
ER A
REA
3
3 .29
5
4.68
IP-7
25.885
m25.924
m
25.558
m
29.495
m
29.433
m29.035
m
29.872
m
25.885
m
Plan of SH54 Interchange
B-041
Plan of SH54 InterchangeThe Preparatory Survey on the Project
for Construction ofMumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
RAMP MP at SH54
RAMP JM at SH54
MPP1
JMP1MPA2
JMA2
LONGITUDINAL SECTION OF RAMP 'MP' FROM MUMBAI TO PANVEL
CHAINAGE
GROUND LVL.
VERTICAL
HORIZONTAL
CHAINAGE
FINISH ROADLVL.EXISTING GROUND LVL.
VERTICAL
25.924
25.172
8.182i=3.330%L=510.200m
i=1.504%L=50.000m
10
15
20
25
5
0
30 30 30 30 30 30 30 3030Bridge Length 270
PROPOSED RAMP PROFILE
EXISTING GROUND LEVEL
LC
4250 4250
8500
2.5% SLOPE
1 - 1
2000
Generel View of RAMP MP
General View of RAMP MP at SH54 Interchange
at SH54 Interchange
1
1
1
1
B-042
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
LONGITUDINAL SECTION OF RAMP JM
i=3.163%
L=603.600m
25.107
25.558
i=1.50
3%
L=30.0
00m
3030303030303030 30Bridge Length 270
STA 0+
713.6
Nose
(STA 2
0+350.
0)
PROPOSED RAMP PROFILE
EXISTING GROUND LEVEL LC
4250 4250
8500
2.5% SLOPE
1 - 1
2000
VERTICAL
GROUND LVL.
CHAINAGE
HORIZONTAL
FINISH ROADLVL.EXISTING
10
15
20
25
5
0
Generel View of RAMP JM
General View of RAMP JM at SH54 Interchange
at SH54 Interchange
1
1
1
1
B-043
The Preparatory Survey on the Project for Construction of
Mumbai Trans Harbour Link
JAPAN INTERNATIONAL COOPERATION AGENCY
MUMBAI METROPOLITAN REGIONDEVELOPMENT AUTHORITY
JICA
Oriental Consultants Global Co., Ltd.East Nippon Expressway Co., Ltd.Nippon Koei Co., Ltd.Nippon Engineering Consultants Co., Ltd.
B. BRIDGEGeneral View of Shivaji Nagar InterchangeGeneral View of SH54 InterchangeTop Related